NTISthis.com

Evidence Guide: RIICPL303D - Install sewer pipelines

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICPL303D - Install sewer pipelines

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installing sewer pipelines

  1. Access, interpret and apply sewer pipelines documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work/plans/specifications requirements
  3. Identify, obtain and implement traffic signage
  4. Select, and check for faults, equipment/tools for work activities
  5. Identify, confirm and apply environmental protection requirements
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, address and report potential hazards and risks
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply sewer pipelines documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work/plans/specifications requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement traffic signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment/tools for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm and apply environmental protection requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and excavate

  1. Prepare work area and materials
  2. Determine and apply dewatering requirements
  3. Determine location, alignment direction, level and grade of sewer pipeline
  4. Set out works to specification
  5. Advise plant operator of excavation requirements and monitor levels
  6. Install sewer pipeline bedding
Prepare work area and materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and apply dewatering requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine location, alignment direction, level and grade of sewer pipeline

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out works to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advise plant operator of excavation requirements and monitor levels

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sewer pipeline bedding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sewer pipeline

  1. Lower pipes and place in position
  2. Join pipes
  3. Place pipes and fit valves, fittings and flow control devices
  4. Continually check alignment level and grade
  5. Position side support and/or overlay beside the pipes
  6. Check sewer pipeline system support structure
  7. Monitor backfill procedure and ensure work is completed to requirements
  8. Construct manholes, inspection and valve chambers, minor structures and thrust blocks
Lower pipes and place in position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Join pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place pipes and fit valves, fittings and flow control devices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually check alignment level and grade

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position side support and/or overlay beside the pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check sewer pipeline system support structure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor backfill procedure and ensure work is completed to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct manholes, inspection and valve chambers, minor structures and thrust blocks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test sewer pipeline

  1. Perform sewer system test procedures establishing functionality and serviceability
  2. Record in writing and report test results
Perform sewer system test procedures establishing functionality and serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record in writing and report test results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for installing sewer pipelines

  1. Access, interpret and apply sewer pipelines documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work/plans/specifications requirements
  3. Identify, obtain and implement traffic signage
  4. Select, and check for faults, equipment/tools for work activities
  5. Identify, confirm and apply environmental protection requirements
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, address and report potential hazards and risks
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply sewer pipelines documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work/plans/specifications requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement traffic signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment/tools for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm and apply environmental protection requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and excavate

  1. Prepare work area and materials
  2. Determine and apply dewatering requirements
  3. Determine location, alignment direction, level and grade of sewer pipeline
  4. Set out works to specification
  5. Advise plant operator of excavation requirements and monitor levels
  6. Install sewer pipeline bedding
Prepare work area and materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and apply dewatering requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine location, alignment direction, level and grade of sewer pipeline

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out works to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Advise plant operator of excavation requirements and monitor levels

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sewer pipeline bedding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sewer pipeline

  1. Lower pipes and place in position
  2. Place pipes and fit valves, fittings and flow control devices
  3. Continually check alignment level and grade
  4. Position side support and/or overlay beside the pipes
  5. Check sewer pipeline system support structure
  6. Monitor backfill procedure and ensure work is completed to requirements
  7. Construct manholes, inspection and valve chambers, minor structures and thrust blocks
Lower pipes and place in position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place pipes and fit valves, fittings and flow control devices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually check alignment level and grade

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position side support and/or overlay beside the pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check sewer pipeline system support structure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor backfill procedure and ensure work is completed to requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct manholes, inspection and valve chambers, minor structures and thrust blocks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test sewer pipeline

  1. Perform sewer system test procedures establishing functionality and serviceability
  2. Record in writing and report test results
  3. Clear work area and dispose of or recycle materials
  4. Clean, check, maintain and store plant, tools and equipment
Perform sewer system test procedures establishing functionality and serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record in writing and report test results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for installing sewer pipelines

1.1 Access, interpret and apply sewer pipelines documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work/plans/specifications requirements

1.3 Identify, obtain and implement traffic signage

1.4 Select, and check for faults, equipment/tools for work activities

1.5 Identify, confirm and apply environmental protection requirements

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Identify, address and report potential hazards and risks

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and excavate

2.1 Prepare work area and materials

2.2 Determine and apply dewatering requirements

2.3 Determine location, alignment direction, level and grade of sewer pipeline

2.4 Set out works to specification

2.5 Advise plant operator of excavation requirements and monitor levels

2.6 Install sewer pipeline bedding

3. Install sewer pipeline

3.1 Lower pipes and place in position

3.2 Join pipes

3.3 Place pipes and fit valves, fittings and flow control devices

3.4 Continually check alignment level and grade

3.5 Position side support and/or overlay beside the pipes

3.6 Check sewer pipeline system support structure

3.7 Monitor backfill procedure and ensure work is completed to requirements

3.8 Construct manholes, inspection and valve chambers, minor structures and thrust blocks

4. Test sewer pipeline

4.1 Perform sewer system test procedures establishing functionality and serviceability

4.2 Record in writing and report test results

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare for installing sewer pipelines

1.1 Access, interpret and apply sewer pipelines documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work/plans/specifications requirements

1.3 Identify, obtain and implement traffic signage

1.4 Select, and check for faults, equipment/tools for work activities

1.5 Identify, confirm and apply environmental protection requirements

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Identify, address and report potential hazards and risks

1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Set out and excavate

2.1 Prepare work area and materials

2.2 Determine and apply dewatering requirements

2.3 Determine location, alignment direction, level and grade of sewer pipeline

2.4 Set out works to specification

2.5 Advise plant operator of excavation requirements and monitor levels

2.6 Install sewer pipeline bedding

3. Install sewer pipeline

3.1 Lower pipes and place in position

3.2 Join pipes

3.3 Place pipes and fit valves, fittings and flow control devices

3.4 Continually check alignment level and grade

3.5 Position side support and/or overlay beside the pipes

3.6 Check sewer pipeline system support structure

3.7 Monitor backfill procedure and ensure work is completed to requirements

3.8 Construct manholes, inspection and valve chambers, minor structures and thrust blocks

4. Test sewer pipeline

4.1 Perform sewer system test procedures establishing functionality and serviceability

4.2 Record in writing and report test results

5. Clean up

5.1 Clear work area and dispose of or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of installation of sewer pipelines including:

applying problem solving and troubleshooting techniques

applying diagnostic techniques

works effectively with others to undertake and complete the installation of sewer pipelines that meets all of the required outcomes including:

communicating clearly and concisely with others to confirm work/plans/specifications

using a range of communications techniques and equipment to convey information to others

demonstrates completion of installing sewer pipelines that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

determining location, alignment direction, level and grade of sewer pipeline

installing sewer pipeline bedding

installing a minimum of 100 metres of sewer pipe

constructing manholes, inspection and valve chambers, minor structures and thrust blocks

completing pipe joins

performing test procedures, establishing functionality and serviceability

maintaining written and verbal reporting requirements and procedures

The candidate must demonstrate knowledge in installing sewer pipelines through:

accessing, interpreting and applying the legislative, organisation and site requirements and procedures for;

hazard identification, risk assessment and response

using JSA/JSEA/safe work method statements

project quality measures

using tools/equipment

maintaining excavation/trench safety

confined space entry

site dewatering

using safety data sheets and materials handling methods

using civil construction terminology

using sewer pipe systems and installation procedures

identifying mains pipe and utility services

using concrete and concrete fabrication

using sedimentation and erosion controls

reading and interpreting engineering drawings

identifying equipment types, characteristics, technical capabilities and limitations

identifying valves and flow control devices

construction of water reticulation

calculating pipeline grades and percentages

identifying site isolation and traffic control responsibilities and authorities