NTISthis.com

Evidence Guide: RIICRC202D - Install signs

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRC202D - Install signs

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installing signs

  1. Access, interpret and apply sign installation documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults all plant, tools and equipment to carry out tasks
  7. Clarify and confirm permits and clearances in accordance with regulatory authority requirements
Access, interpret and apply sign installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults all plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clarify and confirm permits and clearances in accordance with regulatory authority requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transport sign and materials to the site

  1. Survey location of the site in accordance with job drawings and specifications
  2. Arrange site access in accordance with safe working procedures
  3. Prepare delivery site for risk control
  4. Determine availability of loading/unloading equipment
  5. Arrange transportation of signage
  6. Protect signs appropriately and pack them securely for transportation
  7. Load, transport and off-load signs and equipment correctly
Survey location of the site in accordance with job drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange site access in accordance with safe working procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare delivery site for risk control

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine availability of loading/unloading equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange transportation of signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protect signs appropriately and pack them securely for transportation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load, transport and off-load signs and equipment correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble sign

  1. Lay out and check sign components prior to assembly
  2. Confirm correct signage against specifications
  3. Assemble sign on or off site as appropriate
Lay out and check sign components prior to assembly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm correct signage against specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble sign on or off site as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect sign

  1. Determine method of erection according to job requirements
  2. Prepare support materials according to drawings and specifications
  3. Install fastenings to manufacturer’s recommendations
  4. Brace support structure safely
  5. Erect sign efficiently and safely
Determine method of erection according to job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare support materials according to drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install fastenings to manufacturer’s recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace support structure safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect sign efficiently and safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and recycle or dispose of materials
  2. Clean, check, maintain and store plant and equipment
Clear work area and recycle or dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for installing signs

  1. Access, interpret and apply sign installation documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults all plant, tools and equipment to carry out tasks
  7. Clarify and confirm permits and clearances in accordance with regulatory authority requirements
Access, interpret and apply sign installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults all plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clarify and confirm permits and clearances in accordance with regulatory authority requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transport sign and materials to the site

  1. Survey location of the site in accordance with job drawings and specifications
  2. Arrange site access in accordance with safe working procedures
  3. Prepare delivery site for risk control
  4. Determine availability of loading/unloading equipment
  5. Arrange transportation of signage
  6. Protect signs appropriately and pack them securely for transportation
  7. Load, transport and off-load signs and equipment correctly
Survey location of the site in accordance with job drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange site access in accordance with safe working procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare delivery site for risk control

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine availability of loading/unloading equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange transportation of signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Protect signs appropriately and pack them securely for transportation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load, transport and off-load signs and equipment correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble sign

  1. Lay out and check sign components prior to assembly
  2. Confirm correct signage against specifications
  3. Assemble sign on or off site as appropriate
  4. Determine method of erection according to job requirements
  5. Prepare support materials according to drawings and specifications
  6. Install fastenings to manufacturer’s recommendations
  7. Brace support structure safely
  8. Erect sign efficiently and safely
  9. Clear work area and recycle or dispose of materials
  10. Clean, check, maintain and store plant and equipment
Lay out and check sign components prior to assembly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm correct signage against specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assemble sign on or off site as appropriate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine method of erection according to job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare support materials according to drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install fastenings to manufacturer’s recommendations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Brace support structure safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect sign efficiently and safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and recycle or dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for installing signs

1.1 Access, interpret and apply sign installation documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

1.7 Clarify and confirm permits and clearances in accordance with regulatory authority requirements

2. Transport sign and materials to the site

2.1 Survey location of the site in accordance with job drawings and specifications

2.2 Arrange site access in accordance with safe working procedures

2.3 Prepare delivery site for risk control

2.4 Determine availability of loading/unloading equipment

2.5 Arrange transportation of signage

2.6 Protect signs appropriately and pack them securely for transportation

2.7 Load, transport and off-load signs and equipment correctly

3. Assemble sign

3.1 Lay out and check sign components prior to assembly

3.2 Confirm correct signage against specifications

3.3 Assemble sign on or off site as appropriate

4. Erect sign

4.1 Determine method of erection according to job requirements

4.2 Prepare support materials according to drawings and specifications

4.3 Install fastenings to manufacturer’s recommendations

4.4 Brace support structure safely

4.5 Erect sign efficiently and safely

5. Clean up

5.1 Clear work area and recycle or dispose of materials

5.2 Clean, check, maintain and store plant and equipment

Required Skills and Knowledge

1. Plan and prepare for installing signs

1.1 Access, interpret and apply sign installation documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

1.7 Clarify and confirm permits and clearances in accordance with regulatory authority requirements

2. Transport sign and materials to the site

2.1 Survey location of the site in accordance with job drawings and specifications

2.2 Arrange site access in accordance with safe working procedures

2.3 Prepare delivery site for risk control

2.4 Determine availability of loading/unloading equipment

2.5 Arrange transportation of signage

2.6 Protect signs appropriately and pack them securely for transportation

2.7 Load, transport and off-load signs and equipment correctly

3. Assemble sign

3.1 Lay out and check sign components prior to assembly

3.2 Confirm correct signage against specifications

3.3 Assemble sign on or off site as appropriate

4. Erect sign

4.1 Determine method of erection according to job requirements

4.2 Prepare support materials according to drawings and specifications

4.3 Install fastenings to manufacturer’s recommendations

4.4 Brace support structure safely

4.5 Erect sign efficiently and safely

5. Clean up

5.1 Clear work area and recycle or dispose of materials

5.2 Clean, check, maintain and store plant and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of installing signs including:

identifying and applying relevant drawings and job specifications

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements and availability of signs

selecting and checking for faults, tools and equipment to carry out tasks surveying location of the site in accordance with job drawings and specifications

arranging site access in accordance with safe working procedures

preparing delivery site for risk control

determining availability of loading/unloading equipment

arranging transportation of signage

protecting signs appropriately and pack them securely for transportation

loading, transporting and off-loading signs and equipment correctly

works effectively with others to undertake and complete the installation of signs in a way that meets all required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of installing signs that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

laying out and checking sign components prior to assembly

confirming correct signage against specifications

assembling sign on or off site as appropriate

determining method of erection according to job requirements

preparing support materials according to drawings and specifications

installing fastenings to manufacturer’s recommendations

bracing support structure safely

erecting sign efficiently and safely

clearing work area and recycling or disposing of materials

cleaning, checking, maintaining and storing plant and equipment

the loading, transportation, unloading and installation of a minimum of three different free standing signs with at least one (1) being a free standing sign requiring the installation of dual supports

The candidate must demonstrate knowledge in installing signs through:

accessing, interpreting and applying, organisation and site requirements and procedures for:

for installing designated signs

identifying and managing risks

clarifying and confirming permits and clearances in accordance with regulatory authority requirements

identifying, addressing and reporting environmental issues and ground conditions

setting up work activity

site isolation and traffic control responsibilities

work health and safety

arranging site access

arranging transport and loading activities

managing waste

selecting and checking for faults, tools and equipment to carry out tasks carrying out work to specifications

applying effective sign installation techniques