The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Identify and apply relevant drawings and job specifications to all work activities Completed |
Evidence:
|
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task Completed |
Evidence:
|
Set out and excavate trenches
|
|
Check trench depths and grades to ensure conformity with plans and specifications Completed |
Evidence:
|
Set out and clearly mark trench location Completed |
Evidence:
|
Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering Completed |
Evidence:
|
Install bedding materials
|
|
Determine bedding material type and depth from plans and specifications Completed |
Evidence:
|
Lay bedding materials to specified depths and grades Completed |
Evidence:
|
Install sub-soil drainage
|
|
Place geo-textile according to specifications Completed |
Evidence:
|
Prepare drain sections and fittings Completed |
Evidence:
|
Lay subsoil drain Completed |
Evidence:
|
Provide inspection opening and flush out points according to plans Completed |
Evidence:
|
Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems Completed |
Evidence:
|
Install packing and prepare system for backfilling Completed |
Evidence:
|
Monitor backfill procedure to ensure work completed to specification Completed |
Evidence:
|
Clean up
|
|
Clear work area and recycle or dispose of materials in accordance with project environmental management plan Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|