The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for installing sub-soil drainage
|
|
Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, obtain, confirm and implement signage requirements Completed |
Evidence:
|
Select and check for faults all plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Plan stock-piling of materials for ease of access and hazard reduction Completed |
Evidence:
|
Set out and excavate trenches
|
|
Check trench depths and grades to ensure conformity with plans and specifications Completed |
Evidence:
|
Set out and clearly mark trench location Completed |
Evidence:
|
Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering Completed |
Evidence:
|
Install bedding materials
|
|
Identify bedding material type and depth from plans and specifications Completed |
Evidence:
|
Lay bedding materials to specified depths and grades Completed |
Evidence:
|
Install sub-soil drainage
|
|
Place geo-textile according to specifications Completed |
Evidence:
|
Prepare drain sections and fittings Completed |
Evidence:
|
Lay subsoil drain Completed |
Evidence:
|
Provide inspection opening and flush out points according to plans Completed |
Evidence:
|
Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems Completed |
Evidence:
|
Install packing and prepare system for backfilling Completed |
Evidence:
|
Monitor backfill procedure to ensure work completed to specification Completed |
Evidence:
|
Clean up
|
|
Clear work area and recycle or dispose of materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Plan and prepare for installing sub-soil drainage
|
|
Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, obtain, confirm and implement signage requirements Completed |
Evidence:
|
Select and check for faults all plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Plan stock-piling of materials for ease of access and hazard reduction Completed |
Evidence:
|
Set out and excavate trenches
|
|
Check trench depths and grades to ensure conformity with plans and specifications Completed |
Evidence:
|
Set out and clearly mark trench location Completed |
Evidence:
|
Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering Completed |
Evidence:
|
Install bedding materials
|
|
Identify bedding material type and depth from plans and specifications Completed |
Evidence:
|
Lay bedding materials to specified depths and grades Completed |
Evidence:
|
Install sub-soil drainage
|
|
Place geo-textile according to specifications Completed |
Evidence:
|
Prepare drain sections and fittings Completed |
Evidence:
|
Lay subsoil drain Completed |
Evidence:
|
Provide inspection opening and flush out points according to plans Completed |
Evidence:
|
Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems Completed |
Evidence:
|
Install packing and prepare system for backfilling Completed |
Evidence:
|
Monitor backfill procedure to ensure work completed to specification Completed |
Evidence:
|
Clear work area and recycle or dispose of materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|