Evidence Guide: RIICRC203D - Install sub-soil drainage

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRC203D - Install sub-soil drainage

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installing sub-soil drainage

  1. Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults all plant, tools and equipment to carry out tasks
  7. Plan stock-piling of materials for ease of access and hazard reduction
Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults all plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan stock-piling of materials for ease of access and hazard reduction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and excavate trenches

  1. Check trench depths and grades to ensure conformity with plans and specifications
  2. Set out and clearly mark trench location
  3. Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering
Check trench depths and grades to ensure conformity with plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and clearly mark trench location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bedding materials

  1. Identify bedding material type and depth from plans and specifications
  2. Lay bedding materials to specified depths and grades
Identify bedding material type and depth from plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay bedding materials to specified depths and grades

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sub-soil drainage

  1. Place geo-textile according to specifications
  2. Prepare drain sections and fittings
  3. Lay subsoil drain
  4. Provide inspection opening and flush out points according to plans
  5. Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems
  6. Install packing and prepare system for backfilling
  7. Monitor backfill procedure to ensure work completed to specification
Place geo-textile according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare drain sections and fittings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay subsoil drain

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide inspection opening and flush out points according to plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install packing and prepare system for backfilling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor backfill procedure to ensure work completed to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and recycle or dispose of materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and recycle or dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for installing sub-soil drainage

  1. Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults all plant, tools and equipment to carry out tasks
  7. Plan stock-piling of materials for ease of access and hazard reduction
Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults all plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan stock-piling of materials for ease of access and hazard reduction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and excavate trenches

  1. Check trench depths and grades to ensure conformity with plans and specifications
  2. Set out and clearly mark trench location
  3. Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering
Check trench depths and grades to ensure conformity with plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and clearly mark trench location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bedding materials

  1. Identify bedding material type and depth from plans and specifications
  2. Lay bedding materials to specified depths and grades
Identify bedding material type and depth from plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay bedding materials to specified depths and grades

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install sub-soil drainage

  1. Place geo-textile according to specifications
  2. Prepare drain sections and fittings
  3. Lay subsoil drain
  4. Provide inspection opening and flush out points according to plans
  5. Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems
  6. Install packing and prepare system for backfilling
  7. Monitor backfill procedure to ensure work completed to specification
  8. Clear work area and recycle or dispose of materials
  9. Clean, check, maintain and store plant, tools and equipment
Place geo-textile according to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare drain sections and fittings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay subsoil drain

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Provide inspection opening and flush out points according to plans

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install packing and prepare system for backfilling

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor backfill procedure to ensure work completed to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and recycle or dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for installing sub-soil drainage

1.1 Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

1.7 Plan stock-piling of materials for ease of access and hazard reduction

2. Set out and excavate trenches

2.1 Check trench depths and grades to ensure conformity with plans and specifications

2.2 Set out and clearly mark trench location

2.3 Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering

3. Install bedding materials

3.1 Identify bedding material type and depth from plans and specifications

3.2 Lay bedding materials to specified depths and grades

4. Install sub-soil drainage

4.1 Place geo-textile according to specifications

4.2 Prepare drain sections and fittings

4.3 Lay subsoil drain

4.4 Provide inspection opening and flush out points according to plans

4.5 Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems

4.6 Install packing and prepare system for backfilling

4.7 Monitor backfill procedure to ensure work completed to specification

5. Clean up

5.1 Clear work area and recycle or dispose of materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare for installing sub-soil drainage

1.1 Access, interpret and apply sub-soil drainage installation documentation and ensure the work activity is complaint

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

1.7 Plan stock-piling of materials for ease of access and hazard reduction

2. Set out and excavate trenches

2.1 Check trench depths and grades to ensure conformity with plans and specifications

2.2 Set out and clearly mark trench location

2.3 Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering

3. Install bedding materials

3.1 Identify bedding material type and depth from plans and specifications

3.2 Lay bedding materials to specified depths and grades

4. Install sub-soil drainage

4.1 Place geo-textile according to specifications

4.2 Prepare drain sections and fittings

4.3 Lay subsoil drain

4.4 Provide inspection opening and flush out points according to plans

4.5 Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems

4.6 Install packing and prepare system for backfilling

4.7 Monitor backfill procedure to ensure work completed to specification

5. Clean up

5.1 Clear work area and recycle or dispose of materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of sub-soil drainage installation including:

accessing, interpreting and applying relevant documentation to the installing sub-soil drainage work activity including relevant drawings and job specifications

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

planning stock-piling of materials for ease of access and hazard reduction

works effectively with others to undertake and complete the installation of sub-soil drainage in a way that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of installing sub-soil drainage that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting out and excavating trenches to the correct location, depth and grade

installing sub-soil drainage using specified materials and meeting backfill requirements

clearing work area and recycling or disposing of materials

cleaning, checking, maintaining and storing plant, tools and equipment

installation of a minimum of one hundred (100) metres of sub-soil drain in two (2) separate locations, including end structures or outlets to design specifications

The candidate must demonstrate knowledge in installing sub-soil drainage through:

accessing, interpreting and applying, organisation and site requirements and procedures for:

identifying and managing risks

setting up the work activity

utilising signage for creating an exclusion zone

environmental protection

work health and safety

managing waste

selection of appropriate plant, tools and materials

carrying out work to plans and specifications

applying effective installation of sub-soil drainage techniques