Evidence Guide: RIICRC302D - Place and form concrete kerb, channel and fixtures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRC302D - Place and form concrete kerb, channel and fixtures

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to place and form concrete kerb, channel and fixtures

  1. Access, interpret and apply concrete kerb, channel and fixtures documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
Access, interpret and apply concrete kerb, channel and fixtures documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare for construction/ installation

  1. Identify and protect existing services to prevent damage
  2. Set out location of kerb, channel and/or fixtures to dimensions from drawings and specifications or to pre-set pegs
  3. Set out driveways and other inverts
  4. Check grades to ensure correct fall
  5. Construct formwork and check to ensure compliance with specifications
  6. Complete services and conduit preparation in accordance with relevant procedures
Identify and protect existing services to prevent damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out location of kerb, channel and/or fixtures to dimensions from drawings and specifications or to pre-set pegs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out driveways and other inverts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check grades to ensure correct fall

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct formwork and check to ensure compliance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete services and conduit preparation in accordance with relevant procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Form kerb and barrier strips

  1. Maintain vertical and horizontal alignment during concrete placement
  2. Place concrete accurately to string line
  3. Maintain concrete to specified standard
  4. Mix and apply mortar at quality and quantity to achieve specified finish
Maintain vertical and horizontal alignment during concrete placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete accurately to string line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain concrete to specified standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix and apply mortar at quality and quantity to achieve specified finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pour concrete to installed formwork

  1. Place and compact concrete into formwork
  2. Finish surface to alignment specifications
  3. Remove face formwork without damage to concrete following concrete set
Place and compact concrete into formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish surface to alignment specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove face formwork without damage to concrete following concrete set

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish kerbs, channels and fixtures

  1. Finish job to shape in accordance with specifications or to the relevant Australian standard
  2. Finish concrete to specified quality and texture
  3. Position expansion, construction and dowel joints to specification
  4. Cure and protect finished work during process
Finish job to shape in accordance with specifications or to the relevant Australian standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete to specified quality and texture

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position expansion, construction and dowel joints to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cure and protect finished work during process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install pre-cast concrete units

  1. Prepare base section and finish to specification for pre-cast unit installation
  2. Install and join pre-cast concrete units
Prepare base section and finish to specification for pre-cast unit installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and join pre-cast concrete units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair kerb, gutters and median, barrier strips

  1. Identify damaged areas, assess repair requirements and carefully remove or repair damaged section
  2. Set up formwork or slip form machine and use to replace removed section
  3. Place concrete accurately to correct alignment using concrete to the specified mix
  4. Finish concrete to specification matching the shape of the kerb or gutter in place
  5. Clear, backfill and finish area
Identify damaged areas, assess repair requirements and carefully remove or repair damaged section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up formwork or slip form machine and use to replace removed section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete accurately to correct alignment using concrete to the specified mix

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete to specification matching the shape of the kerb or gutter in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear, backfill and finish area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, maintain, check and store tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, maintain, check and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to place and form concrete kerb, channel and fixtures

  1. Access, interpret and apply concrete kerb, channel and fixtures documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
Access, interpret and apply concrete kerb, channel and fixtures documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out and prepare for construction/ installation

  1. Identify and protect existing services to prevent damage
  2. Set out location of kerb, channel and/or fixtures to dimensions from drawings and specifications or to pre-set pegs
  3. Set out driveways and other inverts
  4. Check grades to ensure correct fall
  5. Construct formwork and check to ensure compliance with specifications
  6. Complete services and conduit preparation in accordance with relevant procedures
Identify and protect existing services to prevent damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out location of kerb, channel and/or fixtures to dimensions from drawings and specifications or to pre-set pegs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out driveways and other inverts

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check grades to ensure correct fall

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct formwork and check to ensure compliance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete services and conduit preparation in accordance with relevant procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Form kerb and barrier strips

  1. Maintain vertical and horizontal alignment during concrete placement
  2. Place concrete accurately to string line
  3. Maintain concrete to specified standard
  4. Mix and apply mortar at quality and quantity to achieve specified finish
Maintain vertical and horizontal alignment during concrete placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete accurately to string line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain concrete to specified standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix and apply mortar at quality and quantity to achieve specified finish

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pour concrete to installed formwork

  1. Place and compact concrete into formwork
  2. Finish surface to alignment specifications
  3. Remove face formwork without damage to concrete following concrete set
Place and compact concrete into formwork

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish surface to alignment specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove face formwork without damage to concrete following concrete set

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish kerbs, channels and fixtures

  1. Finish job to shape in accordance with specifications or to the relevant Australian standard
  2. Finish concrete to specified quality and texture
  3. Position expansion, construction and dowel joints to specification
  4. Cure and protect finished work during process
Finish job to shape in accordance with specifications or to the relevant Australian standard

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete to specified quality and texture

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position expansion, construction and dowel joints to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cure and protect finished work during process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install pre-cast concrete units

  1. Prepare base section and finish to specification for pre-cast unit installation
  2. Install and join pre-cast concrete units
Prepare base section and finish to specification for pre-cast unit installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and join pre-cast concrete units

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Repair kerb, gutters and median, barrier strips

  1. Identify damaged areas, assess repair requirements and carefully remove or repair damaged section
  2. Set up formwork or slip form machine and use to replace removed section
  3. Place concrete accurately to correct alignment using concrete to the specified mix
  4. Finish concrete to specification matching the shape of the kerb or gutter in place
  5. Clear, backfill and finish area
  6. Clear work area and dispose of or recycle materials
  7. Clean, maintain, check and store tools and equipment
Identify damaged areas, assess repair requirements and carefully remove or repair damaged section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up formwork or slip form machine and use to replace removed section

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Place concrete accurately to correct alignment using concrete to the specified mix

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete to specification matching the shape of the kerb or gutter in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear, backfill and finish area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, maintain, check and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to place and form concrete kerb, channel and fixtures

1.1 Access, interpret and apply concrete kerb, channel and fixtures documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

2. Set out and prepare for construction/ installation

2.1 Identify and protect existing services to prevent damage

2.2 Set out location of kerb, channel and/or fixtures to dimensions from drawings and specifications or to pre-set pegs

2.3 Set out driveways and other inverts

2.4 Check grades to ensure correct fall

2.5 Construct formwork and check to ensure compliance with specifications

2.6 Complete services and conduit preparation in accordance with relevant procedures

3. Form kerb and barrier strips

3.1 Maintain vertical and horizontal alignment during concrete placement

3.2 Place concrete accurately to string line

3.3 Maintain concrete to specified standard

3.4 Mix and apply mortar at quality and quantity to achieve specified finish

4. Pour concrete to installed formwork

4.1 Place and compact concrete into formwork

4.2 Finish surface to alignment specifications

4.3 Remove face formwork without damage to concrete following concrete set

5. Finish kerbs, channels and fixtures

5.1 Finish job to shape in accordance with specifications or to the relevant Australian standard

5.2 Finish concrete to specified quality and texture

5.3 Position expansion, construction and dowel joints to specification

5.4 Cure and protect finished work during process

6. Install pre-cast concrete units

6.1 Prepare base section and finish to specification for pre-cast unit installation

6.2 Install and join pre-cast concrete units

7. Repair kerb, gutters and median, barrier strips

7.1 Identify damaged areas, assess repair requirements and carefully remove or repair damaged section

7.2 Set up formwork or slip form machine and use to replace removed section

7.3 Place concrete accurately to correct alignment using concrete to the specified mix

7.4 Finish concrete to specification matching the shape of the kerb or gutter in place

7.5 Clear, backfill and finish area

8. Clean up

8.1 Clear work area and dispose of or recycle materials

8.2 Clean, maintain, check and store tools and equipment

Required Skills and Knowledge

1. Plan and prepare to place and form concrete kerb, channel and fixtures

1.1 Access, interpret and apply concrete kerb, channel and fixtures documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

2. Set out and prepare for construction/ installation

2.1 Identify and protect existing services to prevent damage

2.2 Set out location of kerb, channel and/or fixtures to dimensions from drawings and specifications or to pre-set pegs

2.3 Set out driveways and other inverts

2.4 Check grades to ensure correct fall

2.5 Construct formwork and check to ensure compliance with specifications

2.6 Complete services and conduit preparation in accordance with relevant procedures

3. Form kerb and barrier strips

3.1 Maintain vertical and horizontal alignment during concrete placement

3.2 Place concrete accurately to string line

3.3 Maintain concrete to specified standard

3.4 Mix and apply mortar at quality and quantity to achieve specified finish

4. Pour concrete to installed formwork

4.1 Place and compact concrete into formwork

4.2 Finish surface to alignment specifications

4.3 Remove face formwork without damage to concrete following concrete set

5. Finish kerbs, channels and fixtures

5.1 Finish job to shape in accordance with specifications or to the relevant Australian standard

5.2 Finish concrete to specified quality and texture

5.3 Position expansion, construction and dowel joints to specification

5.4 Cure and protect finished work during process

6. Install pre-cast concrete units

6.1 Prepare base section and finish to specification for pre-cast unit installation

6.2 Install and join pre-cast concrete units

7. Repair kerb, gutters and median, barrier strips

7.1 Identify damaged areas, assess repair requirements and carefully remove or repair damaged section

7.2 Set up formwork or slip form machine and use to replace removed section

7.3 Place concrete accurately to correct alignment using concrete to the specified mix

7.4 Finish concrete to specification matching the shape of the kerb or gutter in place

7.5 Clear, backfill and finish area

8. Clean up

8.1 Clear work area and dispose of or recycle materials

8.2 Clean, maintain, check and store tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of placing and forming concrete kerbs, channels and fixtures including:

accessing, interpreting and applying documentation relevant to the placing and forming concrete kerb, channel and fixtures

identifying and applying relevant drawings and job specifications to all work activities

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues and ground conditions

works effectively with others to undertake and complete the placing and forming of concrete kerbs, channels and fixtures that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of place and form concrete kerb, channel and fixtures that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

setting out and preparing for construction/installation in compliance with drawings and specifications requirements

forming kerb and barrier strips by placing concrete and applying mortar to specifications requirements

pouring concrete into installed formwork

finishing kerbs, channels and fixtures

installing pre-cast concrete units and finishing to specifications

repairing kerb, gutters and median, barrier strips

clearing, backfilling and finishing work areas

clearing work area and disposing of, recycling or storing materials

The candidate must demonstrate knowledge in placing and forming concrete kerb, channel and fixtures through:

applying organisation and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues and ground conditions

setting up work activity

site isolation and traffic control responsibilities

work health and safety

managing waste

selecting and checking for faults, tools and equipment to carry out tasks

carrying out work to drawings and specifications

applying effective place and form concrete kerb, channel and fixture techniques