The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for work
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Select tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task Completed |
Evidence:
|
Identify area and location of paving from job drawings Completed |
Evidence:
|
Calculate paving requirements and select material to meet required finish of surface and pattern Completed |
Evidence:
|
Prepare to lay paving
|
|
Set out location and shape of paving area to dimensions from job drawings Completed |
Evidence:
|
Carry out excavation to specified depth, allowing for base and thickness of unit Completed |
Evidence:
|
Position drainage pipes in sub-soil to local regulations Completed |
Evidence:
|
Prepare sub-soil and footing in accordance with specifications Completed |
Evidence:
|
Select base material in accordance with manufacturer's specifications for identified substrate Completed |
Evidence:
|
Clean surface free of loose material and dust where paving is to be bonded to substrate Completed |
Evidence:
|
Lay pavers
|
|
Position edge boards to set out and specifications Completed |
Evidence:
|
Spread sand and aggregate, and compact to specifications Completed |
Evidence:
|
Grade paving surface, where drainage is necessary, to fall evenly without ponding to outlets or surface run off system provided Completed |
Evidence:
|
Mix mortar for masonry paving to specifications Completed |
Evidence:
|
Cut pavers to form edges ensuring fit and minimum wastage of material Completed |
Evidence:
|
Lay paving units to designed pattern Completed |
Evidence:
|
Complete edges to specification Completed |
Evidence:
|
Complete compaction, mortaring and sweeping work to specifications Completed |
Evidence:
|
Maintain finish level across junctions between different levels Completed |
Evidence:
|
Clean up
|
|
Finish paving clean to requirements Completed |
Evidence:
|
Clear work area and dispose of or recycle materials in accordance with project environmental management plan Completed |
Evidence:
|
Clean, check, maintain and store tools and equipment Completed |
Evidence:
|