The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for work to lay pavers
|
|
Access, interpret and apply paver laying documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, obtain, confirm and implement signage and barrier requirements Completed |
Evidence:
|
Select and check for faults all plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Identify and survey area and location of paving from job drawings Completed |
Evidence:
|
Calculate paving requirements and select material to meet required finish of surface and pattern Completed |
Evidence:
|
Stockpile materials safely and within proximity to the work area Completed |
Evidence:
|
Prepare to lay paving
|
|
Set out location and shape of paving area to dimensions from job drawings Completed |
Evidence:
|
Carry out excavation to specified depth, allowing for base and thickness of unit Completed |
Evidence:
|
Position drainage pipes in sub-soil to local regulations Completed |
Evidence:
|
Prepare sub-soil and footing in accordance with specifications Completed |
Evidence:
|
Select base material in accordance with manufacturer’s specifications for identified substrate Completed |
Evidence:
|
Clean surface free of loose material and dust where paving is to be bonded to substrate Completed |
Evidence:
|
Lay pavers
|
|
Position edge boards to set out and specifications Completed |
Evidence:
|
Spread sand and aggregate, and compact to specifications Completed |
Evidence:
|
Grade paving surface, where drainage is necessary, to fall evenly without ponding to outlets or surface run off system provided Completed |
Evidence:
|
Mix mortar for masonry paving to specifications Completed |
Evidence:
|
Cut pavers to form edges ensuring fit and minimum wastage of material Completed |
Evidence:
|
Lay paving units to designed pattern and required fall Completed |
Evidence:
|
Complete edges to specification Completed |
Evidence:
|
Complete compaction, mortaring and sweeping work to specifications Completed |
Evidence:
|
Maintain finish level across junctions between different levels Completed |
Evidence:
|
Clean up
|
|
Finish paving clean to requirements Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store tools and equipment Completed |
Evidence:
|
Plan and prepare for work to lay pavers
|
|
Access, interpret and apply paver laying documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, obtain, confirm and implement signage and barrier requirements Completed |
Evidence:
|
Select and check for faults all plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Identify and survey area and location of paving from job drawings Completed |
Evidence:
|
Calculate paving requirements and select material to meet required finish of surface and pattern Completed |
Evidence:
|
Stockpile materials safely and within proximity to the work area Completed |
Evidence:
|
Prepare to lay paving
|
|
Set out location and shape of paving area to dimensions from job drawings Completed |
Evidence:
|
Carry out excavation to specified depth, allowing for base and thickness of unit Completed |
Evidence:
|
Position drainage pipes in sub-soil to local regulations Completed |
Evidence:
|
Prepare sub-soil and footing in accordance with specifications Completed |
Evidence:
|
Select base material in accordance with manufacturer’s specifications for identified substrate Completed |
Evidence:
|
Clean surface free of loose material and dust where paving is to be bonded to substrate Completed |
Evidence:
|
Position edge boards to set out and specifications Completed |
Evidence:
|
Spread sand and aggregate, and compact to specifications Completed |
Evidence:
|
Grade paving surface, where drainage is necessary, to fall evenly without ponding to outlets or surface run off system provided Completed |
Evidence:
|
Mix mortar for masonry paving to specifications Completed |
Evidence:
|
Cut pavers to form edges ensuring fit and minimum wastage of material Completed |
Evidence:
|
Lay paving units to designed pattern and required fall Completed |
Evidence:
|
Complete edges to specification Completed |
Evidence:
|
Complete compaction, mortaring and sweeping work to specifications Completed |
Evidence:
|
Maintain finish level across junctions between different levels Completed |
Evidence:
|
Finish paving clean to requirements Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store tools and equipment Completed |
Evidence:
|