The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for operations
|
|
Access, interpret and apply concrete paver stringlines documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, obtain and implement signage requirements Completed |
Evidence:
|
Select and check for faults all plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Inspect equipment and layout
|
|
Conduct visual inspection of stringlines to ensure compliance with workplace specifications Completed |
Evidence:
|
Conduct inspection of stringline flags and pins and ensure compliance with worksite plans Completed |
Evidence:
|
Inspect hand or car winch and other pulling devices for safe and accurate operation Completed |
Evidence:
|
Conduct visual inspection of ground conditions for conformance to work requirements Completed |
Evidence:
|
Load and unload stringline pins onto vehicle within workplace specifications Completed |
Evidence:
|
Set up barricades and exclusion zones around work area/PTE Completed |
Evidence:
|
Conduct placement of stringline and pins
|
|
Drive in stringline pins and placement of pins within workplace specifications Completed |
Evidence:
|
Ensure correct tension of stringlines Completed |
Evidence:
|
Use tension measuring devices to establish accurate tensions on stringlines Completed |
Evidence:
|
Set up anchor pins within workplace specifications Completed |
Evidence:
|
Communicate with work teams using workplace hand or radio communication procedures Completed |
Evidence:
|
Tie off stringline to anchor pins Completed |
Evidence:
|
Release stringline from anchor pins Completed |
Evidence:
|
Set out from survey pins heights/level and undertake visual verification of alignment Completed |
Evidence:
|
Reset stringline to specification after it breaks Completed |
Evidence:
|
Install and remove access gates
|
|
Release stringline from the flags and fix on ground to allow vehicles to cross Completed |
Evidence:
|
Install and remove protective devices for crossing vehicles where required Completed |
Evidence:
|
Verify stringline vertical and horizontal upon resetting via measurement and visual inspection Completed |
Evidence:
|
Store and maintain pins and stringline
|
|
Check and maintain clamps, nuts and drive pins Completed |
Evidence:
|
Clean, check, maintain and store stringline to protect it from damage Completed |
Evidence:
|
Plan and prepare for operations
|
|
Access, interpret and apply concrete paver stringlines documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear correct personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify, obtain and implement signage requirements Completed |
Evidence:
|
Select and check for faults all plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Inspect equipment and layout
|
|
Conduct visual inspection of stringlines to ensure compliance with workplace specifications Completed |
Evidence:
|
Conduct inspection of stringline flags and pins and ensure compliance with worksite plans Completed |
Evidence:
|
Inspect hand or car winch and other pulling devices for safe and accurate operation Completed |
Evidence:
|
Conduct visual inspection of ground conditions for conformance to work requirements Completed |
Evidence:
|
Load and unload stringline pins onto vehicle within workplace specifications Completed |
Evidence:
|
Set up barricades and exclusion zones around work area/PTE Completed |
Evidence:
|
Conduct placement of stringline and pins
|
|
Drive in stringline pins and placement of pins within workplace specifications Completed |
Evidence:
|
Ensure correct tension of stringlines Completed |
Evidence:
|
Use tension measuring devices to establish accurate tensions on stringlines Completed |
Evidence:
|
Set up anchor pins within workplace specifications Completed |
Evidence:
|
Communicate with work teams using workplace hand or radio communication procedures Completed |
Evidence:
|
Tie off stringline to anchor pins Completed |
Evidence:
|
Release stringline from anchor pins Completed |
Evidence:
|
Set out from survey pins heights/level and undertake visual verification of alignment Completed |
Evidence:
|
Reset stringline to specification after it breaks Completed |
Evidence:
|
Install and remove access gates
|
|
Release stringline from the flags and fix on ground to allow vehicles to cross Completed |
Evidence:
|
Install and remove protective devices for crossing vehicles where required Completed |
Evidence:
|
Verify stringline vertical and horizontal upon resetting via measurement and visual inspection Completed |
Evidence:
|
Store and maintain pins and stringline
|
|
Check and maintain clamps, nuts and drive pins Completed |
Evidence:
|
Clean, check, maintain and store stringline to protect it from damage Completed |
Evidence:
|