NTISthis.com

Evidence Guide: RIICRC317D - Finish concrete pavements

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRC317D - Finish concrete pavements

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to finish concrete pavements

  1. Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, address and report potential hazards and risks and implement control measures
  6. Identify, obtain, confirm and implement signage requirements
  7. Select and check for faults to plant, tools and equipment
  8. Identify, address and report environmental issues and ground conditions
Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards and risks and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults to plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues and ground conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete

  1. Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies
  2. Apply mechanical trowelling to consolidate and densify the setting concrete surface
  3. Install control joints, edges finished and concrete trowelled to specifications
  4. Apply texture according to client requirements
  5. Apply final trowel finish to concrete surface to specifications
  6. Monitor movements and hazards and identify and communicate changes to the work environment during the work process
Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply mechanical trowelling to consolidate and densify the setting concrete surface

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install control joints, edges finished and concrete trowelled to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply texture according to client requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply final trowel finish to concrete surface to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor movements and hazards and identify and communicate changes to the work environment during the work process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of, reuse or recycle material
  2. Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices
Clear work area and dispose of, reuse or recycle material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to finish concrete pavements

  1. Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, address and report potential hazards and risks and implement control measures
  6. Identify, obtain, confirm and implement signage requirements
  7. Select and check for faults to plant, tools and equipment
  8. Identify, address and report environmental issues and ground conditions
Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards and risks and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults to plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues and ground conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finish concrete

  1. Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies
  2. Apply mechanical trowelling to consolidate and densify the setting concrete surface
  3. Install control joints, edges finished and concrete trowelled to specifications
  4. Apply texture according to client requirements
  5. Apply final trowel finish to concrete surface to specifications
  6. Monitor movements and hazards and identify and communicate changes to the work environment during the work process
  7. Clear work area and dispose of, reuse or recycle material
  8. Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices
Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply mechanical trowelling to consolidate and densify the setting concrete surface

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install control joints, edges finished and concrete trowelled to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply texture according to client requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply final trowel finish to concrete surface to specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor movements and hazards and identify and communicate changes to the work environment during the work process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of, reuse or recycle material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to finish concrete pavements

1.1 Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, address and report potential hazards and risks and implement control measures

1.6 Identify, obtain, confirm and implement signage requirements

1.7 Select and check for faults to plant, tools and equipment

1.8 Identify, address and report environmental issues and ground conditions

2. Finish concrete

2.1 Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies

2.2 Apply mechanical trowelling to consolidate and densify the setting concrete surface

2.3 Install control joints, edges finished and concrete trowelled to specifications

2.4 Apply texture according to client requirements

2.5 Apply final trowel finish to concrete surface to specifications

2.6 Monitor movements and hazards and identify and communicate changes to the work environment during the work process

3. Clean up

3.1 Clear work area and dispose of, reuse or recycle material

3.2 Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices

Required Skills and Knowledge

1. Plan and prepare to finish concrete pavements

1.1 Access, interpret and apply concrete pavement finishing documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, address and report potential hazards and risks and implement control measures

1.6 Identify, obtain, confirm and implement signage requirements

1.7 Select and check for faults to plant, tools and equipment

1.8 Identify, address and report environmental issues and ground conditions

2. Finish concrete

2.1 Apply float and trowel after initial screeding to assist in maintaining a level surface and to remove screeding inaccuracies

2.2 Apply mechanical trowelling to consolidate and densify the setting concrete surface

2.3 Install control joints, edges finished and concrete trowelled to specifications

2.4 Apply texture according to client requirements

2.5 Apply final trowel finish to concrete surface to specifications

2.6 Monitor movements and hazards and identify and communicate changes to the work environment during the work process

3. Clean up

3.1 Clear work area and dispose of, reuse or recycle material

3.2 Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer recommendations and standard work practices

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient finishing of pavements including:

accessing, interpreting and applying documentation for finishing concrete pavements

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

identifying, obtaining, confirming and implementing signage requirements

selecting and checking for faults to plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues

works effectively with others to undertake the finishing of concrete that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of finish concrete pavements that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

finishing concrete to specifications

clearing work area and disposing of, recycling or storing materials

cleaning, checking, maintaining and storing plant, tools and equipment

conduct finishing of concrete on:

four x ten (4x10) metre slab or equivalent

demonstrate the use of:

wood float

vibration screed

power screed

steel trowel

edging tool

demonstrate the removal of form work over ten (10) metres

The candidate must demonstrate knowledge in finishing concrete pavements through:

accessing, interpreting and applying the organisation and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage, erecting barriers and traffic control

work health and safety

managing waste

selecting and checking for faults, all tools and equipment to carry out tasks

carrying out work to specifications

applying effective techniques finishing concrete