Evidence Guide: RIICRC322D - Receive, check and record concrete deliveries

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRC322D - Receive, check and record concrete deliveries

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to receive, check and record concrete deliveries

  1. Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults to plant, tools and equipment, to carry out tasks
Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults to plant, tools and equipment, to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive concrete

  1. Identify survey datum points required to accurately locate material placement
  2. Check delivery documents for accuracy against ordered material
  3. Check delivery docket for compliance with test results
  4. Check for compliance of delivery docket with batching times
  5. Direct required action for non-compliant loads
  6. Direct concrete delivery vehicle to location for discharge
  7. Monitor movements and hazards and identify and communicate changes to the work environment during the work process
Identify survey datum points required to accurately locate material placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check delivery documents for accuracy against ordered material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check delivery docket for compliance with test results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check for compliance of delivery docket with batching times

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct required action for non-compliant loads

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct concrete delivery vehicle to location for discharge

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor movements and hazards and identify and communicate changes to the work environment during the work process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tip/discharge concrete

  1. Maintain safe working area around pour location
  2. Establish actual pour location of discharged load
  3. Discharge concrete from delivery vehicle directly or via chute or material handling equipment
  4. Discharge concrete to required placement level
  5. Visually assess load for uniformity and consistency to test results recorded on delivery docket
  6. Direct delivery vehicle safely away from pour location once discharge is complete
Maintain safe working area around pour location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish actual pour location of discharged load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharge concrete from delivery vehicle directly or via chute or material handling equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharge concrete to required placement level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visually assess load for uniformity and consistency to test results recorded on delivery docket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct delivery vehicle safely away from pour location once discharge is complete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record information

  1. Record appropriate details from the delivery docket
  2. Record the time and location of the discharge of the load
  3. Record additional information as required by worksite procedures
  4. Compete end of day records and dockets and pass onto appropriate site personnel completed days records
Record appropriate details from the delivery docket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record the time and location of the discharge of the load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record additional information as required by worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compete end of day records and dockets and pass onto appropriate site personnel completed days records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clean work area and dispose of, reuse or recycle materials
  2. Clean, check, maintain and store tools and equipment
Clean work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to receive, check and record concrete deliveries

  1. Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues, and implement control measures
  4. Select and wear correct personal protective equipment appropriate for work activities
  5. Identify, obtain, confirm and implement signage requirements
  6. Select and check for faults to plant, tools and equipment, to carry out tasks
Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain, confirm and implement signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults to plant, tools and equipment, to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive concrete

  1. Identify survey datum points required to accurately locate material placement
  2. Check delivery documents for accuracy against ordered material
  3. Check delivery docket for compliance with test results
  4. Check for compliance of delivery docket with batching times
  5. Direct required action for non-compliant loads
  6. Direct concrete delivery vehicle to location for discharge
  7. Monitor movements and hazards and identify and communicate changes to the work environment during the work process
Identify survey datum points required to accurately locate material placement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check delivery documents for accuracy against ordered material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check delivery docket for compliance with test results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check for compliance of delivery docket with batching times

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct required action for non-compliant loads

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct concrete delivery vehicle to location for discharge

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor movements and hazards and identify and communicate changes to the work environment during the work process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tip/discharge concrete

  1. Maintain safe working area around pour location
  2. Establish actual pour location of discharged load
  3. Discharge concrete from delivery vehicle directly or via chute or material handling equipment
  4. Discharge concrete to required placement level
  5. Visually assess load for uniformity and consistency to test results recorded on delivery docket
  6. Direct delivery vehicle safely away from pour location once discharge is complete
Maintain safe working area around pour location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish actual pour location of discharged load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharge concrete from delivery vehicle directly or via chute or material handling equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharge concrete to required placement level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visually assess load for uniformity and consistency to test results recorded on delivery docket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Direct delivery vehicle safely away from pour location once discharge is complete

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record information

  1. Record appropriate details from the delivery docket
  2. Record the time and location of the discharge of the load
  3. Record additional information as required by worksite procedures
  4. Compete end of day records and dockets and pass onto appropriate site personnel completed days records
  5. Clean work area and dispose of, reuse or recycle materials
  6. Clean, check, maintain and store tools and equipment
Record appropriate details from the delivery docket

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record the time and location of the discharge of the load

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record additional information as required by worksite procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compete end of day records and dockets and pass onto appropriate site personnel completed days records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to receive, check and record concrete deliveries

1.1 Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults to plant, tools and equipment, to carry out tasks

2. Receive concrete

2.1 Identify survey datum points required to accurately locate material placement

2.2 Check delivery documents for accuracy against ordered material

2.3 Check delivery docket for compliance with test results

2.4 Check for compliance of delivery docket with batching times

2.5 Direct required action for non-compliant loads

2.6 Direct concrete delivery vehicle to location for discharge

2.7 Monitor movements and hazards and identify and communicate changes to the work environment during the work process

3. Tip/discharge concrete

3.1 Maintain safe working area around pour location

3.2 Establish actual pour location of discharged load

3.3 Discharge concrete from delivery vehicle directly or via chute or material handling equipment

3.4 Discharge concrete to required placement level

3.5 Visually assess load for uniformity and consistency to test results recorded on delivery docket

3.6 Direct delivery vehicle safely away from pour location once discharge is complete

4. Record information

4.1 Record appropriate details from the delivery docket

4.2 Record the time and location of the discharge of the load

4.3 Record additional information as required by worksite procedures

4.4 Compete end of day records and dockets and pass onto appropriate site personnel completed days records

5. Clean up

5.1 Clean work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store tools and equipment

Required Skills and Knowledge

1. Plan and prepare to receive, check and record concrete deliveries

1.1 Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults to plant, tools and equipment, to carry out tasks

2. Receive concrete

2.1 Identify survey datum points required to accurately locate material placement

2.2 Check delivery documents for accuracy against ordered material

2.3 Check delivery docket for compliance with test results

2.4 Check for compliance of delivery docket with batching times

2.5 Direct required action for non-compliant loads

2.6 Direct concrete delivery vehicle to location for discharge

2.7 Monitor movements and hazards and identify and communicate changes to the work environment during the work process

3. Tip/discharge concrete

3.1 Maintain safe working area around pour location

3.2 Establish actual pour location of discharged load

3.3 Discharge concrete from delivery vehicle directly or via chute or material handling equipment

3.4 Discharge concrete to required placement level

3.5 Visually assess load for uniformity and consistency to test results recorded on delivery docket

3.6 Direct delivery vehicle safely away from pour location once discharge is complete

4. Record information

4.1 Record appropriate details from the delivery docket

4.2 Record the time and location of the discharge of the load

4.3 Record additional information as required by worksite procedures

4.4 Compete end of day records and dockets and pass onto appropriate site personnel completed days records

5. Clean up

5.1 Clean work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient concrete deliveries including:

accessing, interpreting and applying documentation for Receive, check and record concrete deliveries

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues

works effectively with others to check concrete deliveries meet all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of receiving, checking and recording concrete deliveries that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

receiving concrete according to site procedures

tipping/discharging concrete safely and in the correct location

recording all required information

cleaning the work area

cleaning, checking, maintaining and storing tools and equipment in line with relevant site procedures

carrying out all receive, check and record concrete deliveries activities to site procedures and standards

The candidate must demonstrate knowledge in receiving, checking and recording concrete deliveries through:

accessing, interpreting and applying organisation and site requirements and procedures for concrete deliveries for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage and erecting barriers

work health and safety

selecting and checking for faults, all tools and equipment to carry out tasks

carrying out work to specifications

applying effective techniques to receiving, checking and recording concrete deliveries