NTISthis.com

Evidence Guide: RIICRM207D - Install raised pavement markers

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICRM207D - Install raised pavement markers

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install raised pavement markers

  1. Access, interpret and apply raised pavement markers documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Identify and implement traffic management signage requirements
  4. Select and check for faults plant, tools and equipment to carry out tasks
  5. Identify, address and report hazards, risks and environmental issues
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply raised pavement markers documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare surface and set out

  1. Clear area of dirt, debris and other contaminants
  2. Identify location for raised pavement markers and position to control point
  3. Remove defective raised pavement markers where required
  4. Prime marked location for raised pavement markers in readiness
Clear area of dirt, debris and other contaminants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify location for raised pavement markers and position to control point

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove defective raised pavement markers where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prime marked location for raised pavement markers in readiness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare marking materials

  1. Mix and prepare marking material
  2. Adjust additives and consistency of material to allow easy application and appropriate curing time
  3. Transfer marking material carefully to applicator container
Mix and prepare marking material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust additives and consistency of material to allow easy application and appropriate curing time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transfer marking material carefully to applicator container

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply raised pavement markers

  1. Use equipment with the correct movement and pressure
  2. Apply material
  3. Identify and correct defects with the material
  4. Maintain equipment
Use equipment with the correct movement and pressure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and correct defects with the material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure work

  1. Assess, record and report work outcomes
  2. Calculate and quantify amount of raised pavement markers completed
  3. Identify and report non-conforming work
Assess, record and report work outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate and quantify amount of raised pavement markers completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and report non-conforming work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
  3. Carry out housekeeping activities
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out housekeeping activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install raised pavement markers

  1. Access, interpret and apply raised pavement markers documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Identify and implement traffic management signage requirements
  4. Select and check for faults plant, tools and equipment to carry out tasks
  5. Identify, address and report hazards, risks and environmental issues
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply raised pavement markers documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare surface and set out

  1. Clear area of dirt, debris and other contaminants
  2. Identify location for raised pavement markers and position to control point
  3. Remove defective raised pavement markers where required
  4. Prime marked location for raised pavement markers in readiness
Clear area of dirt, debris and other contaminants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify location for raised pavement markers and position to control point

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove defective raised pavement markers where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prime marked location for raised pavement markers in readiness

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare marking materials

  1. Mix and prepare marking material
  2. Adjust additives and consistency of material to allow easy application and appropriate curing time
  3. Transfer marking material carefully to applicator container
Mix and prepare marking material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust additives and consistency of material to allow easy application and appropriate curing time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transfer marking material carefully to applicator container

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply raised pavement markers

  1. Use equipment with the correct movement and pressure
  2. Apply material
  3. Identify and correct defects with the material
  4. Maintain equipment
Use equipment with the correct movement and pressure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and correct defects with the material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure work

  1. Assess, record and report work outcomes
  2. Calculate and quantify amount of raised pavement markers completed
  3. Identify and report non-conforming work
  4. Clear work area and dispose of or recycle materials
  5. Clean, check, maintain and store plant, tools and equipment
  6. Carry out housekeeping activities
Assess, record and report work outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calculate and quantify amount of raised pavement markers completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and report non-conforming work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out housekeeping activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install raised pavement markers

1.1 Access, interpret and apply raised pavement markers documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Identify and implement traffic management signage requirements

1.4 Select and check for faults plant, tools and equipment to carry out tasks

1.5 Identify, address and report hazards, risks and environmental issues

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Prepare surface and set out

2.1 Clear area of dirt, debris and other contaminants

2.2 Identify location for raised pavement markers and position to control point

2.3 Remove defective raised pavement markers where required

2.4 Prime marked location for raised pavement markers in readiness

3. Prepare marking materials

3.1 Mix and prepare marking material

3.2 Adjust additives and consistency of material to allow easy application and appropriate curing time

3.3 Transfer marking material carefully to applicator container

4. Apply raised pavement markers

4.1 Use equipment with the correct movement and pressure

4.2 Apply material

4.3 Identify and correct defects with the material

4.4 Maintain equipment

5. Measure work

5.1 Assess, record and report work outcomes

5.2 Calculate and quantify amount of raised pavement markers completed

5.3 Identify and report non-conforming work

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

6.3 Carry out housekeeping activities

Required Skills and Knowledge

1. Plan and prepare to install raised pavement markers

1.1 Access, interpret and apply raised pavement markers documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work instructions before proceeding

1.3 Identify and implement traffic management signage requirements

1.4 Select and check for faults plant, tools and equipment to carry out tasks

1.5 Identify, address and report hazards, risks and environmental issues

1.6 Select and wear correct personal protective equipment appropriate for work activities

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Prepare surface and set out

2.1 Clear area of dirt, debris and other contaminants

2.2 Identify location for raised pavement markers and position to control point

2.3 Remove defective raised pavement markers where required

2.4 Prime marked location for raised pavement markers in readiness

3. Prepare marking materials

3.1 Mix and prepare marking material

3.2 Adjust additives and consistency of material to allow easy application and appropriate curing time

3.3 Transfer marking material carefully to applicator container

4. Apply raised pavement markers

4.1 Use equipment with the correct movement and pressure

4.2 Apply material

4.3 Identify and correct defects with the material

4.4 Maintain equipment

5. Measure work

5.1 Assess, record and report work outcomes

5.2 Calculate and quantify amount of raised pavement markers completed

5.3 Identify and report non-conforming work

6. Clean up

6.1 Clear work area and dispose of or recycle materials

6.2 Clean, check, maintain and store plant, tools and equipment

6.3 Carry out housekeeping activities

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

works effectively with others to undertake and complete the installation of raised pavement markers that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of the installation of raised pavement markers that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

selecting and inspecting for faults in plant, tools and equipment

identifying, reporting and recording hazards, risks and environmental issues

removing dirt, debris and contaminants from the area

setting out the location for line marking with control points

preparing the marking materials by mixing, adjusting and curing appropriately

installation of two hundred (200) permanent reflective or non-reflective raised pavement markers on the various line configurations

measuring, calculating and quantifying amount of raised pavement markers

The candidate must demonstrate knowledge in installing raised pavement markers through:

applying organisation and site requirements and procedures for:

work, health and safety

equipment operation

operational, maintenance and basic diagnostics

JSAs/safe work method statements

housekeeping

identifying and applying road markings

identifying equipment types, characteristics, technical capabilities and limitations

complying with project quality requirements

identifying and using civil construction terminology

complying with site isolation and traffic control responsibilities and authorities

identifying road marking materials

applying raised pavement marking activities and techniques

complying with safety data sheets and materials handling methods

applying processes for the calculation of marker requirements, placement rates and travel speed

being prepared for fire/accident/emergency