Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICTB302D - Install temporary support members

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install temporary support members

  1. Access, interpret and apply temporary support members installation documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, confirm safely handle and locate, ready for use materials, required for the work application
  7. Select and wear personal protective equipment appropriate for work activities
  8. Identify, address and report hazards, risks and environmental issues
  9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply temporary support members installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm safely handle and locate, ready for use materials, required for the work application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary foundations, bed-logs and shoring systems

  1. Excavate foundation installation site
  2. Install bed-log or concrete footing
  3. Install shoring system or prepare timbers
  4. Install jacks or proprietary shoring systems to restore the bridge/deck level
Excavate foundation installation site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bed-log or concrete footing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install shoring system or prepare timbers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install jacks or proprietary shoring systems to restore the bridge/deck level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install braces for stability during corrective work

  1. Install custom designed support brackets or piles
Install custom designed support brackets or piles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary members

  1. Install fasteners
  2. Install girders/stringers
  3. Install supplementary members
Install fasteners

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install girders/stringers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install supplementary members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store machinery, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install temporary support members

  1. Access, interpret and apply temporary support members installation documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage requirements
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Identify, confirm safely handle and locate, ready for use materials, required for the work application
  7. Select and wear personal protective equipment appropriate for work activities
  8. Identify, address and report hazards, risks and environmental issues
  9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply temporary support members installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm safely handle and locate, ready for use materials, required for the work application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary foundations, bed-logs and shoring systems

  1. Excavate foundation installation site
  2. Install bed-log or concrete footing
  3. Install shoring system or prepare timbers
  4. Install jacks or proprietary shoring systems to restore the bridge/deck level
  5. Install braces for stability during corrective work
  6. Install custom designed support brackets or piles
Excavate foundation installation site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install bed-log or concrete footing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install shoring system or prepare timbers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install jacks or proprietary shoring systems to restore the bridge/deck level

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install braces for stability during corrective work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install custom designed support brackets or piles

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary members

  1. Install fasteners
  2. Install girders/stringers
  3. Install supplementary members
  4. Clear work area and dispose of or recycle materials
  5. Clean, check, maintain and store machinery, tools and equipment
Install fasteners

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install girders/stringers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install supplementary members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install temporary support members

1.1. Access, interpret and apply temporary support members installation documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions before proceeding

1.3. Confirm and apply environmental protection and safety requirements

1.4. Obtain, interpret and implement traffic management signage requirements

1.5. Select and check for faults plant, tools and equipment to carry out tasks

1.6. Identify, confirm safely handle and locate, ready for use materials, required for the work application

1.7. Select and wear personal protective equipment appropriate for work activities

1.8. Identify, address and report hazards, risks and environmental issues

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install temporary foundations, bed-logs and shoring systems

2.1. Excavate foundation installation site

2.2. Install bed-log or concrete footing

2.3. Install shoring system or prepare timbers

2.4. Install jacks or proprietary shoring systems to restore the bridge/deck level

2.5.Install braces for stability during corrective work

2.6. Install custom designed support brackets or piles

3. Install temporary members

3.1. Install fasteners

3.2. Install girders/stringers

3.3. Install supplementary members

4. Clean up

4.1. Clear work area and dispose of or recycle materials

4.2. Clean, check, maintain and store machinery, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to install temporary support members

1.1. Access, interpret and apply temporary support members installation documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions before proceeding

1.3. Confirm and apply environmental protection and safety requirements

1.4. Obtain, interpret and implement traffic management signage requirements

1.5. Select and check for faults plant, tools and equipment to carry out tasks

1.6. Identify, confirm safely handle and locate, ready for use materials, required for the work application

1.7. Select and wear personal protective equipment appropriate for work activities

1.8. Identify, address and report hazards, risks and environmental issues

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install temporary foundations, bed-logs and shoring systems

2.1. Excavate foundation installation site

2.2. Install bed-log or concrete footing

2.3. Install shoring system or prepare timbers

2.4. Install jacks or proprietary shoring systems to restore the bridge/deck level

2.5.Install braces for stability during corrective work

2.6. Install custom designed support brackets or piles

3. Install temporary members

3.1. Install fasteners

3.2. Install girders/stringers

3.3. Install supplementary members

4. Clean up

4.1. Clear work area and dispose of or recycle materials

4.2. Clean, check, maintain and store machinery, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the installation of temporary support members that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of the installation of temporary support members that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying reporting and recording hazards and risks

installing one (1) temporary pier at least three (3) metres high, including a bed-log and a jacking system

installing of at least one (1) temporary girder and fastening to one (1) timber member

The candidate must demonstrate knowledge of installing temporary support members through:

applying legislative, organisational and site requirements and procedures for:

site and equipment safety requirements

temporary support member installation procedures and techniques

pier stability and foundations

connection behaviour

shoring and jacking systems

bridge foundations

bridge heritage

calculation of material requirements

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

quality assurance systems and standards

JSA/JSEA/safe work method statements