Evidence Guide: RIICTB305D - Install or replace super-structure members

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICTB305D - Install or replace super-structure members

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install or replace super-structure members

  1. Access, interpret and apply install or replace super-structure members documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, confirm, safely handle and locate, ready for use, materials required for the work application
  8. Identify, address and report hazards, risks and environmental issues
  9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply install or replace super-structure members documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm, safely handle and locate, ready for use, materials required for the work application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary supports

  1. Locate and level bed logs in place
  2. Bolt temporary headers to the girders
  3. Position toms and jacks on the bed logs
  4. Install temporary bracing
  5. Loosen or cut existing bolts to allow movement and access
  6. Jack structure to allow removal of defective part
Locate and level bed logs in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bolt temporary headers to the girders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position toms and jacks on the bed logs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary bracing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Loosen or cut existing bolts to allow movement and access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jack structure to allow removal of defective part

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install or replace members

  1. Remove defective part/s avoiding damage to surrounding members and other workers
  2. Measure and prepare members for installation or replacement
  3. Fit new members
  4. Apply durability treatments to the new members
  5. Install connectors to the new super-structure members
  6. Remove temporary supports after new members are secured in place
  7. Remove temporary headers and bed logs and return bridge to its normal settle point
Remove defective part/s avoiding damage to surrounding members and other workers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure and prepare members for installation or replacement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit new members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply durability treatments to the new members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install connectors to the new super-structure members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove temporary supports after new members are secured in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove temporary headers and bed logs and return bridge to its normal settle point

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of or recycle materials
  2. Clean, check, maintain and store machinery, tools and equipment
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install or replace super-structure members

  1. Access, interpret and apply install or replace super-structure members documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions before proceeding
  3. Confirm and apply environmental protection and safety requirements
  4. Obtain, interpret and implement traffic management signage
  5. Select and check for faults plant, tools and equipment to carry out tasks
  6. Select and wear correct personal protective equipment appropriate for work activities
  7. Identify, confirm, safely handle and locate, ready for use, materials required for the work application
  8. Identify, address and report hazards, risks and environmental issues
  9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply install or replace super-structure members documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm and apply environmental protection and safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and implement traffic management signage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and check for faults plant, tools and equipment to carry out tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear correct personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm, safely handle and locate, ready for use, materials required for the work application

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary supports

  1. Locate and level bed logs in place
  2. Bolt temporary headers to the girders
  3. Position toms and jacks on the bed logs
  4. Install temporary bracing
  5. Loosen or cut existing bolts to allow movement and access
  6. Jack structure to allow removal of defective part
Locate and level bed logs in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bolt temporary headers to the girders

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position toms and jacks on the bed logs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install temporary bracing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Loosen or cut existing bolts to allow movement and access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jack structure to allow removal of defective part

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install or replace members

  1. Remove defective part/s avoiding damage to surrounding members and other workers
  2. Measure and prepare members for installation or replacement
  3. Fit new members
  4. Apply durability treatments to the new members
  5. Install connectors to the new super-structure members
  6. Remove temporary supports after new members are secured in place
  7. Remove temporary headers and bed logs and return bridge to its normal settle point
  8. Clear work area and dispose of or recycle materials
  9. Clean, check, maintain and store machinery, tools and equipment
Remove defective part/s avoiding damage to surrounding members and other workers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure and prepare members for installation or replacement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fit new members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply durability treatments to the new members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install connectors to the new super-structure members

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove temporary supports after new members are secured in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remove temporary headers and bed logs and return bridge to its normal settle point

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store machinery, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install or replace super-structure members

1.1 Access, interpret and apply install or replace super-structure members documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions before proceeding

1.3. Confirm and apply environmental protection and safety requirements

1.4. Obtain, interpret and implement traffic management signage

1.5. Select and check for faults plant, tools and equipment to carry out tasks

1.6. Select and wear correct personal protective equipment appropriate for work activities

1.7. Identify, confirm, safely handle and locate, ready for use, materials required for the work application

1.8. Identify, address and report hazards, risks and environmental issues

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install temporary supports

2.1. Locate and level bed logs in place

2.2. Bolt temporary headers to the girders

2.3. Position toms and jacks on the bed logs

2.4. Install temporary bracing

2.5. Loosen or cut existing bolts to allow movement and access

2.6. Jack structure to allow removal of defective part

3. Install or replace members

3.1. Remove defective part/s avoiding damage to surrounding members and other workers

3.2. Measure and prepare members for installation or replacement

3.3. Fit new members

3.4. Apply durability treatments to the new members

3.5. Install connectors to the new super-structure members

3.6. Remove temporary supports after new members are secured in place

3.7. Remove temporary headers and bed logs and return bridge to its normal settle point

4. Clean up

4.1. Clear work area and dispose of or recycle materials

4.2. Clean, check, maintain and store machinery, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to install or replace super-structure members

1.1 Access, interpret and apply install or replace super-structure members documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions before proceeding

1.3. Confirm and apply environmental protection and safety requirements

1.4. Obtain, interpret and implement traffic management signage

1.5. Select and check for faults plant, tools and equipment to carry out tasks

1.6. Select and wear correct personal protective equipment appropriate for work activities

1.7. Identify, confirm, safely handle and locate, ready for use, materials required for the work application

1.8. Identify, address and report hazards, risks and environmental issues

1.9. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install temporary supports

2.1. Locate and level bed logs in place

2.2. Bolt temporary headers to the girders

2.3. Position toms and jacks on the bed logs

2.4. Install temporary bracing

2.5. Loosen or cut existing bolts to allow movement and access

2.6. Jack structure to allow removal of defective part

3. Install or replace members

3.1. Remove defective part/s avoiding damage to surrounding members and other workers

3.2. Measure and prepare members for installation or replacement

3.3. Fit new members

3.4. Apply durability treatments to the new members

3.5. Install connectors to the new super-structure members

3.6. Remove temporary supports after new members are secured in place

3.7. Remove temporary headers and bed logs and return bridge to its normal settle point

4. Clean up

4.1. Clear work area and dispose of or recycle materials

4.2. Clean, check, maintain and store machinery, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable legislation, documentation, policies and procedures

works effectively with others to undertake and complete the installation or replacement of super-structure members that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and systems such as signage to advise others of work activity and exclusion zone

demonstrates completion of installing or replacing super-structure members that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying, reporting and recording hazards and risks

installing and removing temporary supports

selecting and preparing timber

applying preservatives

marking out and cutting to size of at least one (1) corbel or girder for a super-structure

The candidate must demonstrate knowledge of installing or replacing super-structure members through:

applying legislative, organisational and site requirements and procedures for:

site and equipment safety requirements

temporary support member installation

connection behaviour

shoring and jacking systems

timber grading

test boring

bridge foundations

bridge heritage

calculation of material requirements

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

safety data sheets and materials handling methods

quality assurance systems and standards

JSA/JSEA/safe work method statements