The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task Completed |
Evidence:
|
Identify, obtain and implement signage requirements from the project traffic management plan Completed |
Evidence:
|
Identify and assess ground conditions from engineers' survey analysis Completed |
Evidence:
|
Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults Completed |
Evidence:
|
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task Completed |
Evidence:
|
Set up for machine operation
|
|
Devise and follow production schedules consistent with job requirements Completed |
Evidence:
|
Locate and set up machine and equipment in accordance with planned operating procedure Completed |
Evidence:
|
Adjust machine and attachments for terrain, rock and ground conditions where specified Completed |
Evidence:
|
Use controls to produce smooth and efficient operation of machine according to manufacturer's manual Completed |
Evidence:
|
Carry out operator maintenance and servicing of machine and equipment to regular schedule during excavation process Completed |
Evidence:
|
Excavate tunnel and control dust and water
|
|
Excavate tunnel to shape required by specification according to laser/line levels and measurements Completed |
Evidence:
|
Incorporate dust suppression methods with machine cutting operations to control dust according to OHS requirements Completed |
Evidence:
|
Operate and maintain dust extraction systems to maximum efficiency during excavation Completed |
Evidence:
|
Remove excess water by operating pumping or drainage system to maintain minimal surface water levels Completed |
Evidence:
|
Control mucking
|
|
Set up and align conveyor/mucking system to spoil system Completed |
Evidence:
|
Operate mucking attachments safely Completed |
Evidence:
|
Maintain dust extraction system in operation along conveyor or mucking system Completed |
Evidence:
|
Remove spoil in accordance with planned operating procedures Completed |
Evidence:
|
Direct trucks safely to and from mucking area Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials in accordance with project environmental management plan Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|