The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare to excavate tunnel by machine
|
|
Access, interpret and apply excavate tunnel by machine documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, interpret, clarify and confirm work instructions before proceeding Completed |
Evidence:
|
Identify, obtain and implement the traffic signage requirements Completed |
Evidence:
|
Select and wear personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify and assess ground conditions from engineers’ survey analysis Completed |
Evidence:
|
Select and check for faults plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Identify, address and report environmental issues, potential hazards and risks Completed |
Evidence:
|
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency Completed |
Evidence:
|
Set up for machine operation
|
|
Devise and follow production schedules consistent with job requirements Completed |
Evidence:
|
Locate and set up machine and equipment Completed |
Evidence:
|
Carry out pre-start, start-up, park up, shutdown and secure equipment procedures Completed |
Evidence:
|
Adjust machine and attachments for terrain, rock and ground conditions Completed |
Evidence:
|
Drive, operate machine and use controls to produce smooth and efficient operation Completed |
Evidence:
|
Complete operator maintenance and servicing of machine and equipment to schedule Completed |
Evidence:
|
Excavate tunnel and control dust and water
|
|
Excavate tunnel to shape required by specification according to laser/line levels and measurements Completed |
Evidence:
|
Incorporate dust suppression methods with machine cutting operations to control dust Completed |
Evidence:
|
Operate and maintain dust extraction systems to maximum efficiency during excavation Completed |
Evidence:
|
Remove excess water by operating pumping or drainage system to maintain minimal surface water levels Completed |
Evidence:
|
Control mucking
|
|
Set up and align conveyor/mucking system to spoil system Completed |
Evidence:
|
Operate mucking attachments safely Completed |
Evidence:
|
Maintain dust extraction system in operation along conveyor or mucking system Completed |
Evidence:
|
Remove spoil in accordance with planned operating procedures Completed |
Evidence:
|
Direct trucks safely to and from mucking area Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Carry out housekeeping activities Completed |
Evidence:
|
Plan and prepare to excavate tunnel by machine
|
|
Access, interpret and apply excavate tunnel by machine documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, interpret, clarify and confirm work instructions before proceeding Completed |
Evidence:
|
Identify, obtain and implement the traffic signage requirements Completed |
Evidence:
|
Select and wear personal protective equipment appropriate for work activities Completed |
Evidence:
|
Identify and assess ground conditions from engineers’ survey analysis Completed |
Evidence:
|
Select and check for faults plant, tools and equipment to carry out tasks Completed |
Evidence:
|
Identify, address and report environmental issues, potential hazards and risks Completed |
Evidence:
|
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency Completed |
Evidence:
|
Set up for machine operation
|
|
Devise and follow production schedules consistent with job requirements Completed |
Evidence:
|
Locate and set up machine and equipment Completed |
Evidence:
|
Carry out pre-start, start-up, park up, shutdown and secure equipment procedures Completed |
Evidence:
|
Adjust machine and attachments for terrain, rock and ground conditions Completed |
Evidence:
|
Drive, operate machine and use controls to produce smooth and efficient operation Completed |
Evidence:
|
Complete operator maintenance and servicing of machine and equipment to schedule Completed |
Evidence:
|
Excavate tunnel and control dust and water
|
|
Excavate tunnel to shape required by specification according to laser/line levels and measurements Completed |
Evidence:
|
Incorporate dust suppression methods with machine cutting operations to control dust Completed |
Evidence:
|
Operate and maintain dust extraction systems to maximum efficiency during excavation Completed |
Evidence:
|
Remove excess water by operating pumping or drainage system to maintain minimal surface water levels Completed |
Evidence:
|
Control mucking
|
|
Set up and align conveyor/mucking system to spoil system Completed |
Evidence:
|
Operate mucking attachments safely Completed |
Evidence:
|
Maintain dust extraction system in operation along conveyor or mucking system Completed |
Evidence:
|
Remove spoil in accordance with planned operating procedures Completed |
Evidence:
|
Direct trucks safely to and from mucking area Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Carry out housekeeping activities Completed |
Evidence:
|