The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICTT303D - Control micro tunnelling and pipe-jacking

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to control micro tunnelling and pipe-jacking

  1. Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity
  2. Obtain, confirm and apply written and verbal work instructions
  3. Obtain, confirm and apply safety requirements from the site safety plan
  4. Identify, obtain and implement signage requirements from the project traffic management plan
  5. Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults
  6. Identify, confirm and apply environmental protection requirements from the project environmental management plan,
Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply written and verbal work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply safety requirements from the site safety plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm and apply environmental protection requirements from the project environmental management plan,

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for boring operations

  1. Determine location, alignment direction, level and grade of bore from drawings and specifications
  2. Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment
  3. Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions
  4. Select bore head and drilling fluid for the strata
  5. Position, anchor/stake down boring equipment
Determine location, alignment direction, level and grade of bore from drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select bore head and drilling fluid for the strata

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position, anchor/stake down boring equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment checks

  1. Identify, confirm and apply safety requirements
  2. Carry out start-up, shutdown and communication procedures
  3. Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults
  4. Conduct inspection and fault finding
  5. Carry out equipment maintenance tasks regularly
Identify, confirm and apply safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out start-up, shutdown and communication procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out equipment maintenance tasks regularly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive bore hole

  1. Construct launch and receiving pits to accommodate bore rig and tools
  2. Identify and implement trench collapse prevention for launch and receiving pits
  3. Establish thrust wall in accordance with pipe size and soil characteristics
  4. Determine traverse line of pilot hole to receiving pit
  5. Confirm traverse line of pilot hole to receiving pit at specified distances
  6. Collect and dispose spoil
  7. Select and attach augers to drilling machine
  8. Jack through casings/pipes to receiving pit
  9. Monitor equipment for continuity of production in varied site conditions
Construct launch and receiving pits to accommodate bore rig and tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement trench collapse prevention for launch and receiving pits

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish thrust wall in accordance with pipe size and soil characteristics

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine traverse line of pilot hole to receiving pit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm traverse line of pilot hole to receiving pit at specified distances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect and dispose spoil

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and attach augers to drilling machine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jack through casings/pipes to receiving pit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor equipment for continuity of production in varied site conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of, reuse or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to control micro tunnelling and pipe-jacking

  1. Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity
  2. Obtain, confirm and apply written and verbal work instructions
  3. Obtain, confirm and apply safety requirements from the site safety plan
  4. Identify, obtain and implement signage requirements from the project traffic management plan
  5. Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults
  6. Identify, confirm and apply environmental protection requirements from the project environmental management plan,
Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply written and verbal work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply safety requirements from the site safety plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, confirm and apply environmental protection requirements from the project environmental management plan,

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare for boring operations

  1. Determine location, alignment direction, level and grade of bore from drawings and specifications
  2. Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment
  3. Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions
  4. Select bore head and drilling fluid for the strata
  5. Position, anchor/stake down boring equipment
Determine location, alignment direction, level and grade of bore from drawings and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select bore head and drilling fluid for the strata

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position, anchor/stake down boring equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment checks

  1. Identify, confirm and apply safety requirements
  2. Carry out start-up, shutdown and communication procedures
  3. Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults
  4. Conduct inspection and fault finding
  5. Carry out equipment maintenance tasks regularly
Identify, confirm and apply safety requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out start-up, shutdown and communication procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out equipment maintenance tasks regularly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive bore hole

  1. Construct launch and receiving pits to accommodate bore rig and tools
  2. Identify and implement trench collapse prevention for launch and receiving pits
  3. Establish thrust wall in accordance with pipe size and soil characteristics
  4. Determine traverse line of pilot hole to receiving pit
  5. Confirm traverse line of pilot hole to receiving pit at specified distances
  6. Collect and dispose spoil
  7. Select and attach augers to drilling machine
  8. Jack through casings/pipes to receiving pit
  9. Monitor equipment for continuity of production in varied site conditions
  10. Clear work area and dispose of, reuse or recycle materials
  11. Clean, check, maintain and store plant, tools and equipment
Construct launch and receiving pits to accommodate bore rig and tools

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement trench collapse prevention for launch and receiving pits

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish thrust wall in accordance with pipe size and soil characteristics

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine traverse line of pilot hole to receiving pit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm traverse line of pilot hole to receiving pit at specified distances

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect and dispose spoil

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and attach augers to drilling machine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Jack through casings/pipes to receiving pit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor equipment for continuity of production in varied site conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to control micro tunnelling and pipe-jacking

1.1 Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity

1.2 Obtain, confirm and apply written and verbal work instructions

1.3 Obtain, confirm and apply safety requirements from the site safety plan

1.4 Identify, obtain and implement signage requirements from the project traffic management plan

1.5 Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

1.6 Identify, confirm and apply environmental protection requirements from the project environmental management plan,

2. Prepare for boring operations

2.1 Determine location, alignment direction, level and grade of bore from drawings and specifications

2.2 Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment

2.3 Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions

2.4 Select bore head and drilling fluid for the strata

2.5 Position, anchor/stake down boring equipment

3. Conduct equipment checks

3.1 Identify, confirm and apply safety requirements

3.2 Carry out start-up, shutdown and communication procedures

3.3 Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults

3.4 Conduct inspection and fault finding

3.5 Carry out equipment maintenance tasks regularly

4. Drive bore hole

4.1 Construct launch and receiving pits to accommodate bore rig and tools

4.2 Identify and implement trench collapse prevention for launch and receiving pits

4.3 Establish thrust wall in accordance with pipe size and soil characteristics

4.4 Determine traverse line of pilot hole to receiving pit

4.5 Confirm traverse line of pilot hole to receiving pit at specified distances

4.6 Collect and dispose spoil

4.7 Select and attach augers to drilling machine

4.8 Jack through casings/pipes to receiving pit

4.9 Monitor equipment for continuity of production in varied site conditions

5. Clean up

5.1 Clear work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to control micro tunnelling and pipe-jacking

1.1 Access, interpret and apply documentation and procedures for controlling micro tunnelling and pipe-jacking and ensure compliance to the work activity

1.2 Obtain, confirm and apply written and verbal work instructions

1.3 Obtain, confirm and apply safety requirements from the site safety plan

1.4 Identify, obtain and implement signage requirements from the project traffic management plan

1.5 Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

1.6 Identify, confirm and apply environmental protection requirements from the project environmental management plan,

2. Prepare for boring operations

2.1 Determine location, alignment direction, level and grade of bore from drawings and specifications

2.2 Use above and below ground survey instruments to determine the bore pathway for underground vertical and horizontal alignment

2.3 Conduct visual geological investigation of alignment to determine the differing soil types and groundwater conditions

2.4 Select bore head and drilling fluid for the strata

2.5 Position, anchor/stake down boring equipment

3. Conduct equipment checks

3.1 Identify, confirm and apply safety requirements

3.2 Carry out start-up, shutdown and communication procedures

3.3 Check equipment controls and functions, including implements or other attachments, anchors and/or stabilising equipment for serviceability and report faults

3.4 Conduct inspection and fault finding

3.5 Carry out equipment maintenance tasks regularly

4. Drive bore hole

4.1 Construct launch and receiving pits to accommodate bore rig and tools

4.2 Identify and implement trench collapse prevention for launch and receiving pits

4.3 Establish thrust wall in accordance with pipe size and soil characteristics

4.4 Determine traverse line of pilot hole to receiving pit

4.5 Confirm traverse line of pilot hole to receiving pit at specified distances

4.6 Collect and dispose spoil

4.7 Select and attach augers to drilling machine

4.8 Jack through casings/pipes to receiving pit

4.9 Monitor equipment for continuity of production in varied site conditions

5. Clean up

5.1 Clear work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient controlling of micro tunnelling and pipe-jacking including:

selecting and using the required plant, tools and equipment

preparing for boring operations

carrying out start-up and shutdown activities

works effectively with others to undertake and complete controlling of micro-tunnelling and pipe-jacking tasks that meets all of the required outcomes including:

using a range of communication techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

organising work activities to meet all task requirements

demonstrates completion of conducting micro tunnelling and pipe-jacking that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing a minimum of fifty (50) metres micro-tunnelling and pipe-jacking

identify, obtain, confirm and apply work, safety and signage instructions and requirements

checking and inspecting equipment prior to use

preparing for bore operations

The candidate must demonstrate knowledge in controlling micro tunnelling and pipe-jacking through:

using drilling fluids

applying categories of horizontal directional drilling

using laser control equipment

applying manual handling techniques

using electronic cable locating devices

accessing and interpreting engineering drawings, plans and specifications

identifying equipment types, characteristics, technical capabilities and limitations

identifying and applying site isolation and traffic control responsibilities

applying materials safety data sheets and materials handling methods

using laser control equipment

applying confined space entry techniques

identifying, interpreting and using civil construction terminology