The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIICTT308D - Install close-fit linings for existing pipeline systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install close-fit linings for existing pipeline systems

  1. Access, interpret and apply documentation and procedures for installation of close-fit linings for existing pipeline systems and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Identify, obtain and implement signage requirements from the project traffic management plan
  6. Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults
Access, interpret and apply documentation and procedures for installation of close-fit linings for existing pipeline systems and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site survey

  1. Notify and obtain approval from property owners and occupiers for entry onto their property
  2. Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities
  3. Locate underground utilities
  4. Maintain system serviceability during rehabilitation works
  5. Survey and record existing site conditions
Notify and obtain approval from property owners and occupiers for entry onto their property

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate underground utilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain system serviceability during rehabilitation works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey and record existing site conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate rehabilitation works

  1. Prepare entry and exit pits where specified
  2. Identify, interpret and apply confined space entry procedures
  3. Monitor installation process and finished product to ensure conformity to the design requirements
Prepare entry and exit pits where specified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, interpret and apply confined space entry procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor installation process and finished product to ensure conformity to the design requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake close-fit lining

  1. Determine fault with the aid of plans, drawings, CCTV recording or other mechanisms
  2. Select close fit lining method appropriate to the fault
  3. Apply pressure cleaning to the designated location
  4. Pull lining through the pipe and set in position
  5. Install close fit lining material
  6. Conduct curing process
  7. Correctly secure and seal termination at ends of process
  8. Open junctions for inspection and operation
  9. Monitor installation process and finished product to ensure conformity to the design requirements
Determine fault with the aid of plans, drawings, CCTV recording or other mechanisms

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select close fit lining method appropriate to the fault

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply pressure cleaning to the designated location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pull lining through the pipe and set in position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install close fit lining material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct curing process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correctly secure and seal termination at ends of process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Open junctions for inspection and operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor installation process and finished product to ensure conformity to the design requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up

  1. Clear work area and dispose of, reuse or recycle materials
  2. Clean, check, maintain and store plant, tools and equipment
Clear work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install close-fit linings for existing pipeline systems

  1. Access, interpret and apply documentation and procedures for installation of close-fit linings for existing pipeline systems and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Identify, obtain and implement signage requirements from the project traffic management plan
  6. Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults
Access, interpret and apply documentation and procedures for installation of close-fit linings for existing pipeline systems and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement signage requirements from the project traffic management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform site survey

  1. Notify and obtain approval from property owners and occupiers for entry onto their property
  2. Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities
  3. Locate underground utilities
  4. Maintain system serviceability during rehabilitation works
  5. Survey and record existing site conditions
Notify and obtain approval from property owners and occupiers for entry onto their property

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate underground utilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain system serviceability during rehabilitation works

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey and record existing site conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate rehabilitation works

  1. Prepare entry and exit pits where specified
  2. Identify, interpret and apply confined space entry procedures
  3. Monitor installation process and finished product to ensure conformity to the design requirements
Prepare entry and exit pits where specified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, interpret and apply confined space entry procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor installation process and finished product to ensure conformity to the design requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake close-fit lining

  1. Determine fault with the aid of plans, drawings, CCTV recording or other mechanisms
  2. Select close fit lining method appropriate to the fault
  3. Apply pressure cleaning to the designated location
  4. Pull lining through the pipe and set in position
  5. Install close fit lining material
  6. Conduct curing process
  7. Correctly secure and seal termination at ends of process
  8. Open junctions for inspection and operation
  9. Monitor installation process and finished product to ensure conformity to the design requirements
  10. Clear work area and dispose of, reuse or recycle materials
  11. Clean, check, maintain and store plant, tools and equipment
Determine fault with the aid of plans, drawings, CCTV recording or other mechanisms

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select close fit lining method appropriate to the fault

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply pressure cleaning to the designated location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pull lining through the pipe and set in position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install close fit lining material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct curing process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correctly secure and seal termination at ends of process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Open junctions for inspection and operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor installation process and finished product to ensure conformity to the design requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of, reuse or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install close-fit linings for existing pipeline systems

1.1 Access, interpret and apply documentation and procedures for installation of close-fit linings for existing pipeline systems and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement signage requirements from the project traffic management plan

1.6 Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

2. Perform site survey

2.1 Notify and obtain approval from property owners and occupiers for entry onto their property

2.2 Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities

2.3 Locate underground utilities

2.4 Maintain system serviceability during rehabilitation works

2.5 Survey and record existing site conditions

3. Initiate rehabilitation works

3.1 Prepare entry and exit pits where specified

3.2 Identify, interpret and apply confined space entry procedures

3.3 Monitor installation process and finished product to ensure conformity to the design requirements

4. Undertake close-fit lining

4.1 Determine fault with the aid of plans, drawings, CCTV recording or other mechanisms

4.2 Select close fit lining method appropriate to the fault

4.3 Apply pressure cleaning to the designated location

4.4 Pull lining through the pipe and set in position

4.5 Install close fit lining material

4.6 Conduct curing process

4.7 Correctly secure and seal termination at ends of process

4.8 Open junctions for inspection and operation

4.9 Monitor installation process and finished product to ensure conformity to the design requirements

5. Clean up

5.1 Clear work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to install close-fit linings for existing pipeline systems

1.1 Access, interpret and apply documentation and procedures for installation of close-fit linings for existing pipeline systems and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement signage requirements from the project traffic management plan

1.6 Identify and select plant, tools and equipment, check for serviceability and rectify or report any faults

2. Perform site survey

2.1 Notify and obtain approval from property owners and occupiers for entry onto their property

2.2 Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities

2.3 Locate underground utilities

2.4 Maintain system serviceability during rehabilitation works

2.5 Survey and record existing site conditions

3. Initiate rehabilitation works

3.1 Prepare entry and exit pits where specified

3.2 Identify, interpret and apply confined space entry procedures

3.3 Monitor installation process and finished product to ensure conformity to the design requirements

4. Undertake close-fit lining

4.1 Determine fault with the aid of plans, drawings, CCTV recording or other mechanisms

4.2 Select close fit lining method appropriate to the fault

4.3 Apply pressure cleaning to the designated location

4.4 Pull lining through the pipe and set in position

4.5 Install close fit lining material

4.6 Conduct curing process

4.7 Correctly secure and seal termination at ends of process

4.8 Open junctions for inspection and operation

4.9 Monitor installation process and finished product to ensure conformity to the design requirements

5. Clean up

5.1 Clear work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient installation of close-fit linings for existing pipeline systems including:

selecting and using the required tools and equipment

determining site conditions and locating underground utilities

preparing exit and entry pits

undertaking confined space entry

identifying and selecting close-fit lining methods

monitoring installation process and the finished product

works effectively with others to undertake and complete close-fit linings for existing pipeline systems that meets all of the required outcomes including:

using a range of communication techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

organising work activities to meet all task requirements

demonstrates completion of installing close-fit linings for existing pipeline systems that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing a minimum of two (2) different close-fit linings for existing pipeline systems

identifying, obtaining, confirming and applying work, safety and signage instructions and requirements

cleaning, checking, maintaining and storing plant, tools and equipment

The candidate must demonstrate knowledge in installing close-fit linings for existing pipeline systems through:

laser control equipment techniques

manual handling techniques

application of thrust and rotation

engineering drawings, plans and specifications

equipment types, characteristics, technical capabilities and limitations

site isolation and traffic control responsibilities

safety data sheets and materials handling methods

pipeline systems

civil construction terminology