Evidence Guide: RIIHAN207D - Operate personnel and materials hoists

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIHAN207D - Operate personnel and materials hoists

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to operate personnel and materials hoists

  1. Access, interpret and apply load handling documentation and ensure the work activity is compliant
  2. Obtain, read, interpret clarify and confirm work instructions including shift changeover details, quality requirements, plans and specifications
  3. Select and wear personal protective equipment appropriate for work activities
  4. Arrange signals and communication with other workers including barricade requirements
  5. Identify, address and report potential hazards and environmental issues and implement control measures
  6. Identify materials, equipment and tools required to complete work, check for serviceability, and report faults
  7. Conduct equipment pre-start checks
Access, interpret and apply load handling documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret clarify and confirm work instructions including shift changeover details, quality requirements, plans and specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange signals and communication with other workers including barricade requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify materials, equipment and tools required to complete work, check for serviceability, and report faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare personnel/material hoist

  1. Inspect personnel cage/platform structure and SWL plate
  2. Assess weather conditions for safe hoist operation
  3. Conduct test run through full height of travel without a load, check mast and wall bolting
  4. Check all safety systems including braking system
  5. Ensure that attachment is lowered to ground safely and does not crush feet of personnel
  6. Check personnel’s lanyards/harnesses and anchors comply with relevant Australian standards and are securely fitted to railing/anchor points and personnel harness attachment points
Inspect personnel cage/platform structure and SWL plate

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess weather conditions for safe hoist operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct test run through full height of travel without a load, check mast and wall bolting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all safety systems including braking system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that attachment is lowered to ground safely and does not crush feet of personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check personnel’s lanyards/harnesses and anchors comply with relevant Australian standards and are securely fitted to railing/anchor points and personnel harness attachment points

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate personnel/material hoist

  1. Lift personnel cage/platform and test all equipment in a range positions, operating controls smoothly and carefully, considering working clearances and potential crushing risks to workers
  2. Travel personnel cage/platform as low as possible and operating in low gear and low speed, ensuring maximum stability at all times
  3. Remain seated at controls whenever workers are on/in attachment and in the raised position
  4. Communicate with personnel cage/platform using recommended signals
Lift personnel cage/platform and test all equipment in a range positions, operating controls smoothly and carefully, considering working clearances and potential crushing risks to workers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Travel personnel cage/platform as low as possible and operating in low gear and low speed, ensuring maximum stability at all times

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Remain seated at controls whenever workers are on/in attachment and in the raised position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate with personnel cage/platform using recommended signals

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform post-operation activities

  1. Empty and park attachment in designated area
  2. Clean, remove, inspect and store attachments and equipment correctly
  3. Clean and leave attachment parked on level, secure, and safe position
  4. Report location and state/condition of personnel cage/platform before going off shift
  5. Complete all required written records and documents
Empty and park attachment in designated area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, remove, inspect and store attachments and equipment correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and leave attachment parked on level, secure, and safe position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report location and state/condition of personnel cage/platform before going off shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all required written records and documents

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to operate personnel and materials hoists

1.1 Access, interpret and apply load handling documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret clarify and confirm work instructions including shift changeover details, quality requirements, plans and specifications

1.3 Select and wear personal protective equipment appropriate for work activities

1.4 Arrange signals and communication with other workers including barricade requirements

1.5 Identify, address and report potential hazards and environmental issues and implement control measures

1.6 Identify materials, equipment and tools required to complete work, check for serviceability, and report faults

1.7 Conduct equipment pre-start checks

2. Prepare personnel/material hoist

2.1 Inspect personnel cage/platform structure and SWL plate

2.2 Assess weather conditions for safe hoist operation

2.3 Conduct test run through full height of travel without a load, check mast and wall bolting

2.4 Check all safety systems including braking system

2.5 Ensure that attachment is lowered to ground safely and does not crush feet of personnel

2.6 Check personnel’s lanyards/harnesses and anchors comply with relevant Australian standards and are securely fitted to railing/anchor points and personnel harness attachment points

3. Operate personnel/material hoist

3.1 Lift personnel cage/platform and test all equipment in a range positions, operating controls smoothly and carefully, considering working clearances and potential crushing risks to workers

3.2 Travel personnel cage/platform as low as possible and operating in low gear and low speed, ensuring maximum stability at all times

3.3 Remain seated at controls whenever workers are on/in attachment and in the raised position

3.4 Communicate with personnel cage/platform using recommended signals

4. Perform post-operation activities

4.1 Empty and park attachment in designated area

4.2 Clean, remove, inspect and store attachments and equipment correctly

4.3 Clean and leave attachment parked on level, secure, and safe position

4.4 Report location and state/condition of personnel cage/platform before going off shift

4.5 Complete all required written records and documents

Required Skills and Knowledge

1. Plan and prepare to operate personnel and materials hoists

1.1 Access, interpret and apply load handling documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret clarify and confirm work instructions including shift changeover details, quality requirements, plans and specifications

1.3 Select and wear personal protective equipment appropriate for work activities

1.4 Arrange signals and communication with other workers including barricade requirements

1.5 Identify, address and report potential hazards and environmental issues and implement control measures

1.6 Identify materials, equipment and tools required to complete work, check for serviceability, and report faults

1.7 Conduct equipment pre-start checks

2. Prepare personnel/material hoist

2.1 Inspect personnel cage/platform structure and SWL plate

2.2 Assess weather conditions for safe hoist operation

2.3 Conduct test run through full height of travel without a load, check mast and wall bolting

2.4 Check all safety systems including braking system

2.5 Ensure that attachment is lowered to ground safely and does not crush feet of personnel

2.6 Check personnel’s lanyards/harnesses and anchors comply with relevant Australian standards and are securely fitted to railing/anchor points and personnel harness attachment points

3. Operate personnel/material hoist

3.1 Lift personnel cage/platform and test all equipment in a range positions, operating controls smoothly and carefully, considering working clearances and potential crushing risks to workers

3.2 Travel personnel cage/platform as low as possible and operating in low gear and low speed, ensuring maximum stability at all times

3.3 Remain seated at controls whenever workers are on/in attachment and in the raised position

3.4 Communicate with personnel cage/platform using recommended signals

4. Perform post-operation activities

4.1 Empty and park attachment in designated area

4.2 Clean, remove, inspect and store attachments and equipment correctly

4.3 Clean and leave attachment parked on level, secure, and safe position

4.4 Report location and state/condition of personnel cage/platform before going off shift

4.5 Complete all required written records and documents

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient operation of personnel and material hoists including:

keeping plant and equipment records

complying with environmental requirements

working at heights

applying isolation procedures

reading and appreciating ground conditions

conducting work area risk assessment techniques

works effectively with others to undertake and complete the operation of personnel and material hoists that meet all of the required outcomes including:

using a range of communication systems and techniques to effectively coordinate and communicate information to others

considering working clearances and potential crushing risks to workers

reporting location and state/condition of personnel cage/platform

demonstrates completion of operating personnel and material hoists that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting test run through full height of travel without a load, check mast and wall bolting

checking all safety systems including braking system

checking personnel’s lanyards/harnesses and anchors

lifting personnel cage/platform

testing all equipment in a range positions

operating controls smoothly and carefully

travel personnel cage/platform as low as possible and operating in low gear and low speed

ensuring maximum stability at all times

The candidate must demonstrate knowledge of the following when operating personnel and materials hoists:

communication procedures and hand signals

workplace and equipment safety requirements

plant, tools and equipment types, characteristics, uses and limitations

hoist operation techniques

personnel and material hoist equipment

processes for the calculation of load mass requirements

materials safety data sheet

materials handling, storage and environmentally friendly waste management

designs and functions of hoisting equipment

signaling methods and communications

fault finding and identification

working at heights procedures

emergency procedures (hoist specific)

JSA's/safe work method statements