NTISthis.com

Evidence Guide: RIIMPO322D - Conduct civil construction tracked front end loader operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIMPO322D - Conduct civil construction tracked front end loader operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for tracked front end loader operations

  1. Access, interpret and apply tracked front end loader operations documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work instructions
  3. Identify and address risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Identify, obtain and implement traffic management signage requirements
  6. Select, and check for faults, equipment and/or attachments for work activities
  7. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply tracked front end loader operations documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, obtain and implement traffic management signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment and/or attachments for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate front end loader

  1. Carry out pre-start, start-up, park, shutdown and secure equipment procedures
  2. Coordinate activities with others at the site prior to commencement of, and during, the work activity
  3. Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment
  4. Drive and operate front end loader, and modify the operating technique to meet changing work conditions
  5. Complete work plan within the operating capacity of the equipment
  6. Act on or report monitoring systems and alarms
Carry out pre-start, start-up, park, shutdown and secure equipment procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate activities with others at the site prior to commencement of, and during, the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive and operate front end loader, and modify the operating technique to meet changing work conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work plan within the operating capacity of the equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Act on or report monitoring systems and alarms

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Attach, secure, lift, carry and place

  1. Conduct communication practices associated with transportation and lifting of materials
  2. Establish weight of load and ensure it is within safe operational limits of the machine
  3. Select , attach and use slings and lifting gear in accordance with safe working load requirements
  4. Position machinery to ensure stability and locate to effectively shift materials according to job specifications
  5. Shift load safely and effectively
  6. Move load using hand/audible/communication signals
Conduct communication practices associated with transportation and lifting of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish weight of load and ensure it is within safe operational limits of the machine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select , attach and use slings and lifting gear in accordance with safe working load requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Position machinery to ensure stability and locate to effectively shift materials according to job specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shift load safely and effectively

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Move load using hand/audible/communication signals

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Relocate the front end loader

  1. Prepare front end loader for relocation
  2. Move front end loader safely between work sites, observing relevant codes and traffic management requirements
  3. Load and unload machine from float/trailer
Prepare front end loader for relocation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Move front end loader safely between work sites, observing relevant codes and traffic management requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load and unload machine from float/trailer

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out machine operator maintenance

  1. Prepare machine for maintenance
  2. Conduct inspection and fault finding
  3. Carry out scheduled maintenance tasks
  4. Return machine to service
  5. Process written maintenance records
Prepare machine for maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out scheduled maintenance tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Return machine to service

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written maintenance records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct housekeeping activities

  1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  2. Process records
Clear work area and dispose of or recycle materials in accordance with project environmental management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for tracked front end loader operations

1.1 Access, interpret and apply tracked front end loader operations documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work instructions

1.3 Identify and address risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement traffic management signage requirements

1.6 Select, and check for faults, equipment and/or attachments for work activities

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Operate front end loader

2.1 Carry out pre-start, start-up, park, shutdown and secure equipment procedures

2.2 Coordinate activities with others at the site prior to commencement of, and during, the work activity

2.3 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

2.4 Drive and operate front end loader, and modify the operating technique to meet changing work conditions

2.5 Complete work plan within the operating capacity of the equipment

2.6 Act on or report monitoring systems and alarms

3. Attach, secure, lift, carry and place

3.1 Conduct communication practices associated with transportation and lifting of materials

3.2 Establish weight of load and ensure it is within safe operational limits of the machine

3.3 Select , attach and use slings and lifting gear in accordance with safe working load requirements

3.4 Position machinery to ensure stability and locate to effectively shift materials according to job specifications

3.5 Shift load safely and effectively

3.6 Move load using hand/audible/communication signals

4. Relocate the front end loader

4.1 Prepare front end loader for relocation

4.2 Move front end loader safely between work sites, observing relevant codes and traffic management requirements

4.3 Load and unload machine from float/trailer

5. Carry out machine operator maintenance

5.1 Prepare machine for maintenance

5.2 Conduct inspection and fault finding

5.3 Carry out scheduled maintenance tasks

5.4 Return machine to service

5.5 Process written maintenance records

6. Conduct housekeeping activities

6.1 Clear work area and dispose of or recycle materials in accordance with project environmental management plan

6.2 Process records

Required Skills and Knowledge

1. Plan and prepare for tracked front end loader operations

1.1 Access, interpret and apply tracked front end loader operations documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work instructions

1.3 Identify and address risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Identify, obtain and implement traffic management signage requirements

1.6 Select, and check for faults, equipment and/or attachments for work activities

1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Operate front end loader

2.1 Carry out pre-start, start-up, park, shutdown and secure equipment procedures

2.2 Coordinate activities with others at the site prior to commencement of, and during, the work activity

2.3 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

2.4 Drive and operate front end loader, and modify the operating technique to meet changing work conditions

2.5 Complete work plan within the operating capacity of the equipment

2.6 Act on or report monitoring systems and alarms

3. Attach, secure, lift, carry and place

3.1 Conduct communication practices associated with transportation and lifting of materials

3.2 Establish weight of load and ensure it is within safe operational limits of the machine

3.3 Select , attach and use slings and lifting gear in accordance with safe working load requirements

3.4 Position machinery to ensure stability and locate to effectively shift materials according to job specifications

3.5 Shift load safely and effectively

3.6 Move load using hand/audible/communication signals

4. Relocate the front end loader

4.1 Prepare front end loader for relocation

4.2 Move front end loader safely between work sites, observing relevant codes and traffic management requirements

4.3 Load and unload machine from float/trailer

5. Carry out machine operator maintenance

5.1 Prepare machine for maintenance

5.2 Conduct inspection and fault finding

5.3 Carry out scheduled maintenance tasks

5.4 Return machine to service

5.5 Process written maintenance records

6. Conduct housekeeping activities

6.1 Clear work area and dispose of or recycle materials in accordance with project environmental management plan

6.2 Process records

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of tracked front end loader operations including:

conducting prestart checks prior to commencing operations and shutdown procedures on completion of operations

carrying out vehicle refuelling requirements and procedures

driving and operating the equipment to site conditions

applying safe work practices and identifying and reporting all potential hazards, risks and environmental issues

applying problem solving and troubleshooting techniques

applying leveling techniques

selecting and using the required tools and equipment

working safely around other machines and personnel

safely parking and securing of equipment

applying methods of changing machine attachments

works effectively with others to undertake and complete tracked front end loader operations that meet all of the required outcomes including:

using a range of communications techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

demonstrates completion of civil construction tracked front end loader operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completion of operations to specification using a variety of material types including:

mixing materials

stripping/spreading topsoil and materials

loading

cutting/boxing

backfilling

lifting and carrying materials

site clean-up

The candidate must demonstrate knowledge of the following when conducting civil construction tracked front end loader operations:

identifying, interpreting ground conditions

communicating and performing isolation procedures

identifying equipment processes, technical capability and limitations

being prepared for fire/accident/emergency

identifying signs of operator fatigue and how it should be managed

interpreting drawings and sketches

identifying site isolation and traffic control responsibilities and authorities

using civil construction terminology

complying with project quality requirements

applying basic principles of soil technology and soil compaction for civil works

using basic earthworks calculations

using civil construction activity sequences of road construction, earthworks and drainage

using methods for calculating safe working loads

applying operational, maintenance and basic diagnostics

completing housekeeping activities