NTISthis.com

Evidence Guide: RIIMPO333D - Conduct underground load haul dump operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIMPO333D - Conduct underground load haul dump operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for underground load haul dump operations

  1. Access, interpret and apply underground load haul dump operations documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Select, and check for faults, equipment and/or attachments for work activities
  6. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  7. Inspect and assess site conditions to determine if scaling is required and take action according to site requirements
  8. Use approved dust suppression and extraction methods
  9. Ensure work area is well ventilated before entry
  10. Identify need for, and apply signage and barricades during each stage of activities
Access, interpret and apply underground load haul dump operations documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment and/or attachments for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine if scaling is required and take action according to site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure work area is well ventilated before entry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify need for, and apply signage and barricades during each stage of activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate load haul dump plant

  1. Carry out start-up, park, shutdown and secure equipment procedures
  2. Coordinate activities with others at the site prior to commencement of, and during, the work activity
  3. Drive and operate equipment safely within working environment, load limitations and road conditions
  4. Monitor and manage equipment performance using appropriate indicators and ensure efficiency of operations
  5. Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment
  6. Complete the work plan, within the operating capacities of the plant
Carry out start-up, park, shutdown and secure equipment procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate activities with others at the site prior to commencement of, and during, the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drive and operate equipment safely within working environment, load limitations and road conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage equipment performance using appropriate indicators and ensure efficiency of operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete the work plan, within the operating capacities of the plant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Load material

  1. Wash down surrounding area and wet material to suppress dust
  2. Scale down loose material
  3. Check job site and identify and manages possible misfires in accordance with site procedures
  4. Check, identify and remove contaminants
  5. Ensure all hoses and other auxiliary services are neatly stored
  6. Bog to work plan removing required materials
  7. Ensure road is kept clear during bogging
Wash down surrounding area and wet material to suppress dust

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scale down loose material

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check job site and identify and manages possible misfires in accordance with site procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check, identify and remove contaminants

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all hoses and other auxiliary services are neatly stored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bog to work plan removing required materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure road is kept clear during bogging

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Haul material

  1. Confirm type of material and haul to designated location
  2. Lower bucket in recommended position
  3. Identify and manage spillages on hauling surface
  4. Maintain hauling efficiency by managing working environment conditions
Confirm type of material and haul to designated location

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lower bucket in recommended position

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and manage spillages on hauling surface

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain hauling efficiency by managing working environment conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dump materials

  1. Slow equipment to crawl when approaching dump site
  2. Lift bucket to appropriate height in readiness for dumping, maintaining stability of loader
  3. Dump material evenly distributing load or as required
Slow equipment to crawl when approaching dump site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lift bucket to appropriate height in readiness for dumping, maintaining stability of loader

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dump material evenly distributing load or as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up job site

  1. Scale down site ensuring loose materials are dislodged safely
  2. Leave site and surrounding area clear, safe and accessible
Scale down site ensuring loose materials are dislodged safely

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Leave site and surrounding area clear, safe and accessible

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operator maintenance

  1. Prepare machine for maintenance
  2. Conduct inspection and fault finding
  3. Carry out scheduled maintenance tasks
  4. Process written maintenance records
Prepare machine for maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct inspection and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out scheduled maintenance tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written maintenance records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out housekeeping activities

  1. Clear work area and dispose of or recycle materials
  2. Process records
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for underground load haul dump operations

1.1 Access, interpret and apply underground load haul dump operations documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Select, and check for faults, equipment and/or attachments for work activities

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.7 Inspect and assess site conditions to determine if scaling is required and take action according to site requirements

1.8 Use approved dust suppression and extraction methods

1.9 Ensure work area is well ventilated before entry

1.10 Identify need for, and apply signage and barricades during each stage of activities

2. Operate load haul dump plant

2.1 Carry out start-up, park, shutdown and secure equipment procedures

2.2 Coordinate activities with others at the site prior to commencement of, and during, the work activity

2.3 Drive and operate equipment safely within working environment, load limitations and road conditions

2.4 Monitor and manage equipment performance using appropriate indicators and ensure efficiency of operations

2.5 Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

2.6 Complete the work plan, within the operating capacities of the plant

3. Load material

3.1 Wash down surrounding area and wet material to suppress dust

3.2 Scale down loose material

3.3 Check job site and identify and manages possible misfires in accordance with site procedures

3.4 Check, identify and remove contaminants

3.5 Ensure all hoses and other auxiliary services are neatly stored

3.6 Bog to work plan removing required materials

3.7 Ensure road is kept clear during bogging

4. Haul material

4.1 Confirm type of material and haul to designated location

4.2 Lower bucket in recommended position

4.3 Identify and manage spillages on hauling surface

4.4 Maintain hauling efficiency by managing working environment conditions

5. Dump materials

5.1 Slow equipment to crawl when approaching dump site

5.2 Lift bucket to appropriate height in readiness for dumping, maintaining stability of loader

5.3 Dump material evenly distributing load or as required

6. Clean up job site

6.1 Scale down site ensuring loose materials are dislodged safely

6.2 Leave site and surrounding area clear, safe and accessible

7. Carry out operator maintenance

7.1 Prepare machine for maintenance

7.2 Conduct inspection and fault finding

7.3 Carry out scheduled maintenance tasks

7.4 Process written maintenance records

8. Carry out housekeeping activities

8.1 Clear work area and dispose of or recycle materials

8.2 Process records

Required Skills and Knowledge

1. Plan and prepare for underground load haul dump operations

1.1 Access, interpret and apply underground load haul dump operations documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Select, and check for faults, equipment and/or attachments for work activities

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.7 Inspect and assess site conditions to determine if scaling is required and take action according to site requirements

1.8 Use approved dust suppression and extraction methods

1.9 Ensure work area is well ventilated before entry

1.10 Identify need for, and apply signage and barricades during each stage of activities

2. Operate load haul dump plant

2.1 Carry out start-up, park, shutdown and secure equipment procedures

2.2 Coordinate activities with others at the site prior to commencement of, and during, the work activity

2.3 Drive and operate equipment safely within working environment, load limitations and road conditions

2.4 Monitor and manage equipment performance using appropriate indicators and ensure efficiency of operations

2.5 Continually monitor hazards and risks, and ensure safety of self, other personnel, plant and equipment

2.6 Complete the work plan, within the operating capacities of the plant

3. Load material

3.1 Wash down surrounding area and wet material to suppress dust

3.2 Scale down loose material

3.3 Check job site and identify and manages possible misfires in accordance with site procedures

3.4 Check, identify and remove contaminants

3.5 Ensure all hoses and other auxiliary services are neatly stored

3.6 Bog to work plan removing required materials

3.7 Ensure road is kept clear during bogging

4. Haul material

4.1 Confirm type of material and haul to designated location

4.2 Lower bucket in recommended position

4.3 Identify and manage spillages on hauling surface

4.4 Maintain hauling efficiency by managing working environment conditions

5. Dump materials

5.1 Slow equipment to crawl when approaching dump site

5.2 Lift bucket to appropriate height in readiness for dumping, maintaining stability of loader

5.3 Dump material evenly distributing load or as required

6. Clean up job site

6.1 Scale down site ensuring loose materials are dislodged safely

6.2 Leave site and surrounding area clear, safe and accessible

7. Carry out operator maintenance

7.1 Prepare machine for maintenance

7.2 Conduct inspection and fault finding

7.3 Carry out scheduled maintenance tasks

7.4 Process written maintenance records

8. Carry out housekeeping activities

8.1 Clear work area and dispose of or recycle materials

8.2 Process records

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient conducting of load haul dump operations in underground metalliferous mines including:

conducting prestart checks prior to commencing operations and shutdown procedures on completion of operations

carrying out vehicle refuelling requirements and procedures

driving and operating the equipment to site conditions

applying safe work practices and identifying and reporting all potential hazards, risks and environmental issues

applying problem solving and troubleshooting techniques

selecting and using the required tools and equipment

carrying out equipment towing

applying vehicle directing procedures

applying pushing techniques

Works effectively with others to undertake and complete load haul dump operations in underground metalliferous mines that meet all of the required outcomes including:

using a range of communications techniques and equipment to convey information to others

maintaining written and verbal reporting requirements and procedures

organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

demonstrates completion of conducting underground load, haul and dump truck operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

loading material

hauling material

dumping material

scaling down lose material

identifying and managing misfires

identifying and removing contaminants

identifying and managing spillages

The candidate must demonstrate knowledge of the following when conducting underground load haul dump operations:

communicating and performing isolation procedures

identifying primary and secondary ventilation

identifying equipment processes, technical capability and limitations

identifying, interpreting and using geological and technical data (basic)

being prepared for fire/accident/emergency

identifying signs of operator fatigue and how it should be managed

applying operational, maintenance and basic diagnostics

completing housekeeping activities