Evidence Guide: RIINHB303D - Install product pipe

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIINHB303D - Install product pipe

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installation of product pipe

  1. Access, interpret and apply install product pipe documentation, and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Communicate and coordinate activities with others throughout the work activity
  6. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply install product pipe documentation, and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate and coordinate activities with others throughout the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install product pipe

  1. Select appropriate equipment to install product pipe
  2. Carry out pre-start and start up procedures
  3. Lock out machine
  4. Check and connect necessary equipment
  5. Locate product feed to prevent damage and within breakover limitations
  6. Install product, removing drill stem sections to procedure as required
  7. Monitor and interpret all gauge/dial readings
  8. Monitor product feed
  9. Take required actions to achieve satisfactory product installation
  10. Maintain drill log and reports as required
Select appropriate equipment to install product pipe

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-start and start up procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lock out machine

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and connect necessary equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Locate product feed to prevent damage and within breakover limitations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install product, removing drill stem sections to procedure as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and interpret all gauge/dial readings

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor product feed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take required actions to achieve satisfactory product installation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain drill log and reports as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain equipment

  1. Monitor wear on drill stem, particularly threads
  2. Dress damaged threads or replace drill stem as required
  3. Check all equipment and hoses
  4. Clean all equipment on completion of installation, ensuring environmental controls are followed
  5. Rotate drill stems in stack
  6. Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment
  7. Carry out shutdown and secure equipment
  8. Complete housekeeping activities
  9. Process records
Monitor wear on drill stem, particularly threads

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dress damaged threads or replace drill stem as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check all equipment and hoses

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean all equipment on completion of installation, ensuring environmental controls are followed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rotate drill stems in stack

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out shutdown and secure equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete housekeeping activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to problems

  1. Identify possible problems in equipment or process
  2. Determine problems needing action
  3. Determine possible fault causes
  4. Rectify problem using appropriate solution within area of responsibility
  5. Follow through items initiated until final resolution has occurred
  6. Report problems outside area of responsibility to designated person
Identify possible problems in equipment or process

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine problems needing action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine possible fault causes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rectify problem using appropriate solution within area of responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Follow through items initiated until final resolution has occurred

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report problems outside area of responsibility to designated person

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for installation of product pipe

1.1 Access, interpret and apply install product pipe documentation, and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install product pipe

2.1 Select appropriate equipment to install product pipe

2.2 Carry out pre-start and start up procedures

2.3 Lock out machine

2.4 Check and connect necessary equipment

2.5 Locate product feed to prevent damage and within breakover limitations

2.6 Install product, removing drill stem sections to procedure as required

2.7 Monitor and interpret all gauge/dial readings

2.8 Monitor product feed

2.9 Take required actions to achieve satisfactory product installation

2.10 Maintain drill log and reports as required

3. Maintain equipment

3.1 Monitor wear on drill stem, particularly threads

3.2 Dress damaged threads or replace drill stem as required

3.3 Check all equipment and hoses

3.4 Clean all equipment on completion of installation, ensuring environmental controls are followed

3.5 Rotate drill stems in stack

3.6 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

3.7 Carry out shutdown and secure equipment

3.8 Complete housekeeping activities

3.9 Process records

4. Respond to problems

4.1 Identify possible problems in equipment or process

4.2 Determine problems needing action

4.3 Determine possible fault causes

4.4 Rectify problem using appropriate solution within area of responsibility

4.5 Follow through items initiated until final resolution has occurred

4.6 Report problems outside area of responsibility to designated person

Required Skills and Knowledge

1. Plan and prepare for installation of product pipe

1.1 Access, interpret and apply install product pipe documentation, and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install product pipe

2.1 Select appropriate equipment to install product pipe

2.2 Carry out pre-start and start up procedures

2.3 Lock out machine

2.4 Check and connect necessary equipment

2.5 Locate product feed to prevent damage and within breakover limitations

2.6 Install product, removing drill stem sections to procedure as required

2.7 Monitor and interpret all gauge/dial readings

2.8 Monitor product feed

2.9 Take required actions to achieve satisfactory product installation

2.10 Maintain drill log and reports as required

3. Maintain equipment

3.1 Monitor wear on drill stem, particularly threads

3.2 Dress damaged threads or replace drill stem as required

3.3 Check all equipment and hoses

3.4 Clean all equipment on completion of installation, ensuring environmental controls are followed

3.5 Rotate drill stems in stack

3.6 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

3.7 Carry out shutdown and secure equipment

3.8 Complete housekeeping activities

3.9 Process records

4. Respond to problems

4.1 Identify possible problems in equipment or process

4.2 Determine problems needing action

4.3 Determine possible fault causes

4.4 Rectify problem using appropriate solution within area of responsibility

4.5 Follow through items initiated until final resolution has occurred

4.6 Report problems outside area of responsibility to designated person

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of installation of product pipe including:

operating the drill

operating ancillary equipment

attaching product pipe

identifying and dressing slightly damaged drill stem threads

works effectively with others to undertake and complete the installation of product pipe that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements prior to commencing and during work activities

demonstrates completion of the installation of product pipe that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

selecting appropriate equipment to install product pipe

locking out machine

locating product feed to prevent damage and within breakover limitations

installing product, removing drill stem sections

monitoring and interpreting all gauge/dial readings

monitoring product feed

maintaining drill log and reports as required

The candidate must demonstrate knowledge in installing product pipe through:

accessing, interpreting and applying the organisation and site requirements and procedures for:

work, health and safety

environmental issues

operating drill rig

housekeeping

identifying basic rock/geology types and their impact on HDD operations including hard rock and scree

identifying the minimum radius of curvature for different products and impact on the job

complying with the strengths (compressive, tension) for different products and impact on the job

understanding the principles of HDD (general only)