Evidence Guide: RIINHB316A - Conduct underground in-seam directional drilling

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIINHB316A - Conduct underground in-seam directional drilling

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for conducting of underground in-seam directional drilling

  1. Access, interpret and apply compliance documentation relevant to the work activity
  2. Obtain, confirm and apply work instructions for the allocated task
  3. Identify, manage and report all potential hazards
  4. Resolve coordination requirements with others at the site prior to commencing and during work activities
Access, interpret and apply compliance documentation relevant to the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, confirm and apply work instructions for the allocated task

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, manage and report all potential hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing and during work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Calibrate and operate survey tool

  1. Calibrate survey tool in accordance with instructions
  2. Set up the orientation of the survey tool and the down-hole motor in accordance with instructions
  3. Take the first survey reading in accordance with manufacturer's instructions and with regard to the standpipe length and composition and use the result to adjust the orientation of the down-hole motor
  4. Conduct on-going surveys at intervals in accordance with the drill plan and use the result to adjust the orientation of the down-hole motor
  5. Monitor and maintain the survey tool power supply and basic consumable items as per instructions
Calibrate survey tool in accordance with instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up the orientation of the survey tool and the down-hole motor in accordance with instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Take the first survey reading in accordance with manufacturer's instructions and with regard to the standpipe length and composition and use the result to adjust the orientation of the down-hole motor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct on-going surveys at intervals in accordance with the drill plan and use the result to adjust the orientation of the down-hole motor

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and maintain the survey tool power supply and basic consumable items as per instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drill hole

  1. Prepare for drilling in accordance with the drill plan
  2. Choose drill bits appropriate to the geology
  3. Issue clear and timely instructions to drill team members and others involved, for the safe, effective and efficient conduct of the task, to meet the requirements of drill plan
  4. Carry out the drilling in accordance with the drill plan
  5. Monitor and adjust drilling technique according to conditions
  6. Identify and remedy operational problems
  7. Reorientate the down-hole motor when branching is required to achieved required deviation of the hole
  8. Maintain communication with all relevant personnel
Prepare for drilling in accordance with the drill plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Choose drill bits appropriate to the geology

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Issue clear and timely instructions to drill team members and others involved, for the safe, effective and efficient conduct of the task, to meet the requirements of drill plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out the drilling in accordance with the drill plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and adjust drilling technique according to conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and remedy operational problems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reorientate the down-hole motor when branching is required to achieved required deviation of the hole

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain communication with all relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documents and report

  1. Maintain drill log and plot drilling data
  2. Download survey instrument data system and upload data to site and/or work computer system
  3. Report data and drilling plots
Maintain drill log and plot drilling data

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Download survey instrument data system and upload data to site and/or work computer system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report data and drilling plots

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete equipment maintenance and housekeeping

  1. Ensure that the drill rods are inspected for wear and damage and that threads are dressed and greased in accordance with standard procedures or that rods are replace as required
  2. Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action
  3. Monitor wear on drill bit and reamers and take appropriate action
  4. Apply health, safety and environmental controls
  5. Maintain safe and tidy site for the duration and at the conclusion of the job
  6. Ensure all drilling equipment is cleaned and maintained
  7. Ensure that drill fluids are appropriately contained and disposed of appropriately
Ensure that the drill rods are inspected for wear and damage and that threads are dressed and greased in accordance with standard procedures or that rods are replace as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor wear on drill bit and reamers and take appropriate action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply health, safety and environmental controls

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain safe and tidy site for the duration and at the conclusion of the job

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure all drilling equipment is cleaned and maintained

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure that drill fluids are appropriately contained and disposed of appropriately

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting of underground in-seam directional drilling

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of conducting of underground in-seam directional drilling

working with others to undertake and complete the conducting of underground in-seam directional drilling that meets all of the required outcomes

consistent timely completion of conducting of underground in-seam directional drilling that safely, effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistently achieving the required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete underground in-seam directional drilling

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Required Skills and Knowledge

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to conduct underground in-seam directional drilling:

apply legislative, organisation and site requirements and procedures for the conducting of underground in-seam directional drilling

apply safe manual handling practices

apply drill rig operating procedures

apply survey equipment operating procedures

apply drill bit, down-hole motor, and survey tool attaching procedures

apply operational communication procedures

apply inspection and monitoring procedures

apply maintenance procedures

interpret drill plans

apply ancillary equipment operating procedures, including; communications equipment, computer equipment, pumps, ventilation equipment, separator pods and fluid mixers

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to conduct underground in-seam directional drilling:

legislative, organisation's and site OHS requirements

potential underground directional drilling hazards

potential work place hazards

potential underground environmental hazards

principles of underground in-seam directional drilling operations

organisation's operational requirements and procedures

manufacturer's requirements and procedures

specific handling requirements for underground drilling equipment

housekeeping requirements and procedures

basic geology types and their impact on underground in-seam directional drilling operations

appropriate drill bits for different geology types

appropriate reamers for different geology types

importance and functions of the standpipe

maximum radius of curvature for drill string

types of drill fluid and their applications

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation

may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work instructions may come from:

briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

nature and scope of tasks

specifications

quality of finished works

achievement targets

operational conditions

obtaining of permits required

site layout

out of bounds areas

worksite inspection requirements

lighting conditions

plant or equipment defects

hazards and potential hazards

coordination requirements or issues

contamination control requirements

environmental control requirements

barricade and signage requirements

Hazards may include:

mining equipment

roof and rib spalls

the presence of gases and water

release of gases or water from formation

spread of contaminants as a result of drilling or cleaning processes

working in proximity to drilling rig

use of high air or hydraulic pressure for drilling operations

entanglement in rotating pipes

string makeup and breakout hazards

Coordination requirements may include:

drill team

other equipment operators

maintenance personnel

supervisors

mine personnel

Drill plan may include:

hole location, dip and direction

hole sizes

hole depths

site geology

specific drill bits required

frequency of surveys

frequency of floor and or roof hits

coring requirements

Drill bits may include:

PCD bits

tri-cone rock bits

tungsten bits

Instructions may include:

likely geology

purpose of the drilling

survey intervals

hole parameters

in-hole drill component requirements

Monitor may include:

gauge readings

colour and consistency of return water

down-hole motor penetration rate

vibration and noise levels

Drilling technique may include:

applied feed pressure

rotational speed

regulation of water pressure and volume

use of drilling agents for stabilisation or to enhance flushing (e.g. bentonite, polymers or pH adjusting agents)

Conditions my include:

variations in geology, including:

consistency of the coal

presence of stone (e.g. shale, sandstone)

presence of clay

faults and jointing

dykes

water and gas emissions from the drill face

variations in environmental conditions (e.g. ventilation)

Operational problems may include:

changing geological formations, particularly clay, rock or unstable or porous formations

loss of air or water volume or pressure

equipment failure

bogging or parting of rod string

loss of signal from down-hole survey tool

reliability of communications

Relevant personnel may include:

drill crew members

mine staff and supervisors

site safety personnel

statutory persons

Ancillary equipment may include:

pumps

water disposal lines and

ventilation equipment

Remedial action may include:

clear or remove obstructions

replace damaged hoses

top-up lubricants