The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan for the installation and operation of water and gas control equipment
|
|
Access, interpret and apply compliance documentation relevant to the work activity Completed |
Evidence:
|
Access, clarify and apply the specific task requirements for the installation and operation of water and gas control equipment Completed |
Evidence:
|
Identify workplace hazards, assess, maintain control and report associated risks in accordance with required procedures Completed |
Evidence:
|
Resolve coordination requirements with others at the site prior to commencing and during work activities for the safe effective and efficient execution of the work Completed |
Evidence:
|
Prepare and maintain a job plan, in consultation with relevant team members, which makes best use of the available resources and meets the task requirements Completed |
Evidence:
|
Prepare for the installation and operation of water and gas control equipment
|
|
Select the appropriate water and gas control equipment to meet the requirements of the configuration Completed |
Evidence:
|
Inspect the water and gas control equipment components for serviceability Completed |
Evidence:
|
Arrange the delivery of all equipment required for the installation and operation of the water and gas control equipment to the worksite Completed |
Evidence:
|
Ensure that the drill hole is deep enough to house the down-hole components and adjust depth as necessary Completed |
Evidence:
|
Insert the down-hole components into the standpipe Completed |
Evidence:
|
Separate the rod string, leaving sufficient distance between the rod clamp and standpipe (or other attachments) to install the stuffing box Completed |
Evidence:
|
Install water and gas control equipment
|
|
Install the control valve, applying appropriate securing method Completed |
Evidence:
|
Install the 'T' piece, applying appropriate securing method Completed |
Evidence:
|
Install the stuffing box, applying appropriate securing method Completed |
Evidence:
|
Pack and secure the seal in accordance with requirements and procedures Completed |
Evidence:
|
Operate the water and gas control equipment
|
|
Monitor the water and gas control equipment and ensure its correct operation Completed |
Evidence:
|
Rectify water and gas control equipment operational problems Completed |
Evidence:
|
Isolate the water and gas control equipment in the event of line failure Completed |
Evidence:
|
Apply site environmental controls Completed |
Evidence:
|
Carry out maintenance and housekeeping
|
|
Inspect and fault-find all water and gas control equipment Completed |
Evidence:
|
Remove and replace defective components Completed |
Evidence:
|
Maintain and leave the work area in a safe, clean and tidy condition Completed |
Evidence:
|
maintain and complete all reports as required Completed |
Evidence:
|