The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for coiled tubing
|
|
Obtain, confirm and apply work instructions Completed |
Evidence:
|
Access, interpret and apply coil tube drilling documentation and confirm work activity is compliant Completed |
Evidence:
|
Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures Completed |
Evidence:
|
Select and wear personal protective equipment required for work activities Completed |
Evidence:
|
Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received Completed |
Evidence:
|
Select equipment, tools and equipment required to carry out tasks, check for serviceability and rectify or report any faults within scope of own role Completed |
Evidence:
|
Check restraining devices on all pressure hoses Completed |
Evidence:
|
Fit and replace restraining devices on pressure hoses as required Completed |
Evidence:
|
Raise alarm and report as required Completed |
Evidence:
|
Position the crane hook to the centre of the storage reel Completed |
Evidence:
|
Hoist the storage reel over the centre of the carrier and lower into saddles Completed |
Evidence:
|
Lock down the storage reel with retainer brackets and set tension screws Completed |
Evidence:
|
Install circulating equipment Completed |
Evidence:
|
Remove mud tank side hoses, swivel and cross over Completed |
Evidence:
|
Line up saddles and cut excess coil tubing on rig floor with casing cutter Completed |
Evidence:
|
Align saddles to remove storage reel Completed |
Evidence:
|
Install dog nut and chain coil Completed |
Evidence:
|
Cut coil tubing according to manufacturer and work requirements Completed |
Evidence:
|
Open level wind box, shut off the motor and lockout rig and open storage reel saddles Completed |
Evidence:
|
Remove the lockout and prepare to pick up the coil Completed |
Evidence:
|
Measure amount of coil cut and record remaining length Completed |
Evidence:
|
Install tubing snake connector
|
|
Prepare coil tubing ends Completed |
Evidence:
|
Conduct NDT crack test on the tubing stake connector Completed |
Evidence:
|
Check the o-rings for die retention are not stretched out Completed |
Evidence:
|
Separate the two-piece tubing snake connector in the middle at the threads Completed |
Evidence:
|
Size, install and tighten threaded half of tubing snake connector into the tail end of the coil tubing on the storage reel Completed |
Evidence:
|
Size, install and tighten threaded half of tubing snake connector into tail end of coil tubing on the injector side Completed |
Evidence:
|
Align tubing connector up and screw two tubing stake connector pieces together at centre treads Completed |
Evidence:
|
Perform and pull test on the tubing snake and confirm that the connector is locked in prior to removing chains Completed |
Evidence:
|
Handle tubing snake connector
|
|
Inspect derrick and rig floor for equipment Completed |
Evidence:
|
Raise derrick until injector coil tubing end and storage reel coil tubing line up Completed |
Evidence:
|
Check the integrity of the tubing stake connection by performing a pull test Completed |
Evidence:
|
Lock out floor motor according to manufacturer requirements Completed |
Evidence:
|
Remove storage reel retention chain and dog nut Completed |
Evidence:
|
Remove lock from the floor motor Completed |
Evidence:
|
Engage storage reel while maintaining the correct pressure Completed |
Evidence:
|
Run coil with tubing stake connector through injector making cuts until the tubing snake connector is completely through the injector Completed |
Evidence:
|
Install set screw tubing dimple
|
|
Prepare coil tubing ends with a grinder Completed |
Evidence:
|
Install the dimple template Completed |
Evidence:
|
Tighten all set screws on the dimple template Completed |
Evidence:
|
Loosen screws and remove template Completed |
Evidence:
|
Deepen the template indents with a drill to dimple screw depth Completed |
Evidence:
|
Install the tubing dimple and dimple set screws according to manufacturer requirements Completed |
Evidence:
|
Conduct bottom hole assembly operations
|
|
Place float on bit and install bit sub onto bit Completed |
Evidence:
|
Run drill collar up v-door and pick up with top drive and elevators Completed |
Evidence:
|
Stab drill collar in bit sub and make up drill collar into bit sub Completed |
Evidence:
|
Pick up sub and position where needed for stabbing into stump Completed |
Evidence:
|
Stab the tubing dimple into the bottom hole assembly on the stump Completed |
Evidence:
|
Apply make up tong to dimple while rotating table to make up BHA Completed |
Evidence:
|
Apply breakout tong to dimple and make up to BHA while torqueing up BHA Completed |
Evidence:
|
Tripping in with coil tubing
|
|
Set bottom hole assembly depths at rotary Kelly bushing before lowering the lube tube Completed |
Evidence:
|
Confirm lube tube is down and air bag inflated on flow T Completed |
Evidence:
|
Confirm stripping head is deflated Completed |
Evidence:
|
Confirm the reel drag is set to no higher than 1000 psi Completed |
Evidence:
|
Set the traction pressure on the injector as low as possible without coil tubing slippage Completed |
Evidence:
|
Verify the trip speed with the Rig Manager Completed |
Evidence:
|
Verify level wind is continuously in line with coil tubing, depths are tracking correctly and conduct flow checks at the shaker box Completed |
Evidence:
|
Tripping out with coil tubing
|
|
Grease and inspect injector as per industry standards Completed |
Evidence:
|
Check the air bag on flow T is still inflated Completed |
Evidence:
|
Verify stripper rubber on the injector is inflated to the correct pressure, level wind is continuously in line with coil tubing and all depths are tracking at all times Completed |
Evidence:
|
Verify the trip speed with the Rig Manger Completed |
Evidence:
|
Lift the lube tube when bottom hole assembly reaches 75 metres prior to pulling out of hole Completed |
Evidence:
|
Conduct flow checks at specified intervals Completed |
Evidence:
|
Slip and cut coil tubing-grinder/rod cutter
|
|
Place tubing dimple at the desired working height Completed |
Evidence:
|
Place the hole cover in position Completed |
Evidence:
|
Run coil tubing through table to correct working height in cellar Completed |
Evidence:
|
Cut coil tubing with grinder/rod cutter Completed |
Evidence:
|
Remove with double wrapping sling and wire line Completed |
Evidence:
|
Lay down through v door Completed |
Evidence:
|