NTISthis.com

Evidence Guide: RIIOGD203D - Prepare and operate drilling fluid systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIOGD203D - Prepare and operate drilling fluid systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for operations

  1. Access, interpret and apply drilling fluid system documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select the personal protective equipment appropriate for the work activity
  5. Conform to safe working practices and current legislative and operational requirements
  6. Resolve coordination requirements with others at the site prior to commencing, during and on completion of the work activities
  7. Assess geographic layout of the active, reserve and slug pits under work instruction
  8. Assess operation of mud mixers, dump valves and equalising valves
  9. Identify and locate mud pump and discharge system
Access, interpret and apply drilling fluid system documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select the personal protective equipment appropriate for the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conform to safe working practices and current legislative and operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing, during and on completion of the work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess geographic layout of the active, reserve and slug pits under work instruction

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess operation of mud mixers, dump valves and equalising valves

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and locate mud pump and discharge system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish operational requirements

  1. Clarify difficulties in carrying out the instructions with the relevant personnel
  2. Confirm availability and status of necessary permits to work
  3. Confirm availability of necessary third party utilities
  4. Confirm availability of required quantities and type of consumables
  5. Identify errors, omissions and shortages and take appropriate remedial action within functional responsibility
Clarify difficulties in carrying out the instructions with the relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability and status of necessary permits to work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of necessary third party utilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of required quantities and type of consumables

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify errors, omissions and shortages and take appropriate remedial action within functional responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and test equipment

  1. Identify and select equipment appropriate for the work to be performed
  2. Confirm equipment is functional and fit for the purpose and the environment in which it will be used
  3. Identify defects in the equipment and take appropriate remedial action within functional responsibility
Identify and select equipment appropriate for the work to be performed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm equipment is functional and fit for the purpose and the environment in which it will be used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify defects in the equipment and take appropriate remedial action within functional responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare drilling fluids

  1. Confirm availability of sufficient quantities and types of fluids against operational requirements
  2. Confirm tanks and mixing equipment are clean and free from contamination in accordance with instructions
  3. Mix and treat fluids to specification
  4. Obtain, correctly label in writing and store samples
  5. Identify defects in the equipment and take appropriate remedial action within functional responsibility
Confirm availability of sufficient quantities and types of fluids against operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm tanks and mixing equipment are clean and free from contamination in accordance with instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mix and treat fluids to specification

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, correctly label in writing and store samples

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify defects in the equipment and take appropriate remedial action within functional responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pump drilling fluids

  1. Confirm recording and monitoring devices are preset to required parameters
  2. Operate equipment
  3. Identify faults and defects accurately and take appropriate remedial action within functional responsibility
  4. Assist with obtaining samples, weigh, measure viscosity and record details
  5. Operate pipe in the derrick manually and under supervision
  6. Grease crown block and identify hanging sheaves
  7. Record in writing data accurately at appropriate times and frequencies in accordance with operational requirements
Confirm recording and monitoring devices are preset to required parameters

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify faults and defects accurately and take appropriate remedial action within functional responsibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assist with obtaining samples, weigh, measure viscosity and record details

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate pipe in the derrick manually and under supervision

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grease crown block and identify hanging sheaves

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record in writing data accurately at appropriate times and frequencies in accordance with operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate hopper system

  1. Recognise operation of the hopper system
  2. Operate and maintain hopper system and associated components
  3. Measure, calculate and log in writing mud properties correctly
  4. Recognise, record and report changes in returns of drilling fluid and pit volumes
Recognise operation of the hopper system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate and maintain hopper system and associated components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measure, calculate and log in writing mud properties correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise, record and report changes in returns of drilling fluid and pit volumes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for operations

1.1 Access, interpret and apply drilling fluid system documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select the personal protective equipment appropriate for the work activity

1.5 Conform to safe working practices and current legislative and operational requirements

1.6 Resolve coordination requirements with others at the site prior to commencing, during and on completion of the work activities

1.7 Assess geographic layout of the active, reserve and slug pits under work instruction

1.8 Assess operation of mud mixers, dump valves and equalising valves

1.9 Identify and locate mud pump and discharge system

2. Establish operational requirements

2.1 Clarify difficulties in carrying out the instructions with the relevant personnel

2.2 Confirm availability and status of necessary permits to work

2.3 Confirm availability of necessary third party utilities

2.4 Confirm availability of required quantities and type of consumables

2.5 Identify errors, omissions and shortages and take appropriate remedial action within functional responsibility

3. Select and test equipment

3.1 Identify and select equipment appropriate for the work to be performed

3.2 Confirm equipment is functional and fit for the purpose and the environment in which it will be used

3.3 Identify defects in the equipment and take appropriate remedial action within functional responsibility

4. Prepare drilling fluids

4.1 Confirm availability of sufficient quantities and types of fluids against operational requirements

4.2 Confirm tanks and mixing equipment are clean and free from contamination in accordance with instructions

4.3 Mix and treat fluids to specification

4.4 Obtain, correctly label in writing and store samples

4.5 Identify defects in the equipment and take appropriate remedial action within functional responsibility

5. Pump drilling fluids

5.1 Confirm recording and monitoring devices are preset to required parameters

5.2 Operate equipment

5.3 Identify faults and defects accurately and take appropriate remedial action within functional responsibility

5.4 Assist with obtaining samples, weigh, measure viscosity and record details

5.5 Operate pipe in the derrick manually and under supervision

5.6 Grease crown block and identify hanging sheaves

5.7 Record in writing data accurately at appropriate times and frequencies in accordance with operational requirements

6. Operate hopper system

6.1 Recognise operation of the hopper system

6.2 Operate and maintain hopper system and associated components

6.3 Measure, calculate and log in writing mud properties correctly

6.4 Recognise, record and report changes in returns of drilling fluid and pit volumes

Required Skills and Knowledge

1. Plan and prepare for operations

1.1 Access, interpret and apply drilling fluid system documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select the personal protective equipment appropriate for the work activity

1.5 Conform to safe working practices and current legislative and operational requirements

1.6 Resolve coordination requirements with others at the site prior to commencing, during and on completion of the work activities

1.7 Assess geographic layout of the active, reserve and slug pits under work instruction

1.8 Assess operation of mud mixers, dump valves and equalising valves

1.9 Identify and locate mud pump and discharge system

2. Establish operational requirements

2.1 Clarify difficulties in carrying out the instructions with the relevant personnel

2.2 Confirm availability and status of necessary permits to work

2.3 Confirm availability of necessary third party utilities

2.4 Confirm availability of required quantities and type of consumables

2.5 Identify errors, omissions and shortages and take appropriate remedial action within functional responsibility

3. Select and test equipment

3.1 Identify and select equipment appropriate for the work to be performed

3.2 Confirm equipment is functional and fit for the purpose and the environment in which it will be used

3.3 Identify defects in the equipment and take appropriate remedial action within functional responsibility

4. Prepare drilling fluids

4.1 Confirm availability of sufficient quantities and types of fluids against operational requirements

4.2 Confirm tanks and mixing equipment are clean and free from contamination in accordance with instructions

4.3 Mix and treat fluids to specification

4.4 Obtain, correctly label in writing and store samples

4.5 Identify defects in the equipment and take appropriate remedial action within functional responsibility

5. Pump drilling fluids

5.1 Confirm recording and monitoring devices are preset to required parameters

5.2 Operate equipment

5.3 Identify faults and defects accurately and take appropriate remedial action within functional responsibility

5.4 Assist with obtaining samples, weigh, measure viscosity and record details

5.5 Operate pipe in the derrick manually and under supervision

5.6 Grease crown block and identify hanging sheaves

5.7 Record in writing data accurately at appropriate times and frequencies in accordance with operational requirements

6. Operate hopper system

6.1 Recognise operation of the hopper system

6.2 Operate and maintain hopper system and associated components

6.3 Measure, calculate and log in writing mud properties correctly

6.4 Recognise, record and report changes in returns of drilling fluid and pit volumes