NTISthis.com

Evidence Guide: RIIOGD303D - Trip pipe

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIOGD303D - Trip pipe

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for operations

  1. Access, interpret and apply trip pipe documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select the personal protective equipment appropriate for the work activity
  5. Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on
  6. Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements
  7. Confirm availability of necessary third party utilities in accordance with operational requirements
  8. Check safety lines, ropes and air hoists
  9. Check equipment for safety and operations
Access, interpret and apply trip pipe documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select the personal protective equipment appropriate for the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of necessary third party utilities in accordance with operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check safety lines, ropes and air hoists

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check equipment for safety and operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to trip tubulars

  1. Line up trip tank
  2. Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable
Line up trip tank

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Trip tubulars

  1. Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole
  2. Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole
  3. Visually check the elevator latch, identify faults and report
  4. Operate air hoist to manoeuvre tubulars in the derrick
  5. Record tasks where required
Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visually check the elevator latch, identify faults and report

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate air hoist to manoeuvre tubulars in the derrick

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record tasks where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate racking system

  1. Release pipe from elevators and rack in proper position when pulling out of the hole
  2. Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole
  3. Operate air hoists which manoeuvre drill string in the derrick
Release pipe from elevators and rack in proper position when pulling out of the hole

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate air hoists which manoeuvre drill string in the derrick

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for operations

1.1 Access, interpret and apply trip pipe documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select the personal protective equipment appropriate for the work activity

1.5 Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on

1.6 Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements

1.7 Confirm availability of necessary third party utilities in accordance with operational requirements

1.8 Check safety lines, ropes and air hoists

1.9 Check equipment for safety and operations

2. Prepare to trip tubulars

2.1 Line up trip tank

2.2 Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable

3. Trip tubulars

3.1 Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole

3.2 Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole

3.3 Visually check the elevator latch, identify faults and report

3.4 Operate air hoist to manoeuvre tubulars in the derrick

3.5 Record tasks where required

4. Operate racking system

4.1 Release pipe from elevators and rack in proper position when pulling out of the hole

4.2 Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole

4.3 Operate air hoists which manoeuvre drill string in the derrick

Required Skills and Knowledge

1. Plan and prepare for operations

1.1 Access, interpret and apply trip pipe documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select the personal protective equipment appropriate for the work activity

1.5 Resolve coordination requirements with others at the site prior to commencing and during work activities and ensure briefings/handover details are read/passed on

1.6 Confirm availability and status of necessary permits to work in accordance with operational and legislative requirements

1.7 Confirm availability of necessary third party utilities in accordance with operational requirements

1.8 Check safety lines, ropes and air hoists

1.9 Check equipment for safety and operations

2. Prepare to trip tubulars

2.1 Line up trip tank

2.2 Prepare pipe racking system to stand back, run in, lay down or pick-up pipe, where applicable

3. Trip tubulars

3.1 Latch elevators on to the tubulars which is stabilised by the Derrickman while being stabbed by pulling out of the hole

3.2 Latch elevators on to the tubular which is being stabilised by the Derrickman while running into hole

3.3 Visually check the elevator latch, identify faults and report

3.4 Operate air hoist to manoeuvre tubulars in the derrick

3.5 Record tasks where required

4. Operate racking system

4.1 Release pipe from elevators and rack in proper position when pulling out of the hole

4.2 Latch elevators onto drill string and stabilise while stand stabbed by roughnecks when running in the hole

4.3 Operate air hoists which manoeuvre drill string in the derrick