The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare rig up, conduct pre-spud operations and rig down
|
|
Access, interpret and apply rig up, conduct pre-spud operations and rig down documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify, address and report potential hazards, risks and environmental issues and implement control measures Completed |
Evidence:
|
the work activities Completed |
Evidence:
|
to commencing, during, and on completion of work activities Completed |
Evidence:
|
Carry out pre rig-up procedure inspections (by rig manager, operator and crew) Completed |
Evidence:
|
Coordinate movement of load and sequence of installation and location Completed |
Evidence:
|
Check equipment for damage and/or loss by moving contractor and report and BI Completed |
Evidence:
|
Rig up to spud
|
|
Receive and action rig manager authorisation to commence rig-up to spud operations Completed |
Evidence:
|
Receive detailed verbal and written instructions on use and type of mud from the operator and distribute Completed |
Evidence:
|
Identify potential rig-up problems and take corrective action Completed |
Evidence:
|
Keep rig manager informed of operations Completed |
Evidence:
|
hole/subsea hole
|
|
Check drilling and hoist equipment, report damage to rig manager and record Completed |
Evidence:
|
Conduct equipment checks for nippling-up or cross-checked with relevant procedures Completed |
Evidence:
|
Check handling equipment for correct sizing and if fit for purpose Completed |
Evidence:
|
Confirm availability of and inspect, clean, calibrate and record tubulars Completed |
Evidence:
|
Check well control equipment Completed |
Evidence:
|
Identify special tool requirements and check if fit for purpose and approved for use Completed |
Evidence:
|
Prepare for pre-spud operations
|
|
Lock pipe racks with drill pipe and position drill collars Completed |
Evidence:
|
Inspect casing running tools for safety and fitness-for-purpose and rectify and/or report faults and malfunctions Completed |
Evidence:
|
Record casing tallies and report Completed |
Evidence:
|
Conduct operations as per drilling program
|
|
Determine optimum circulating and penetration rates and check deviations are in accordance with operators drilling program Completed |
Evidence:
|
Continually check mud cleaning equipment and screens for integrity and correct operation Completed |
Evidence:
|
Check drilling fluid quantities with sufficient being in reserve to kill well and keep hole on full trip Completed |
Evidence:
|
Record correct mud properties on tour report Completed |
Evidence:
|
Operate all equipment in accordance with manufacturer regulations and company procedures Completed |
Evidence:
|
Maintain a sound working relationship with third party contractors Completed |
Evidence:
|
Rig down
|
|
Receive and action rig manager authorisation to commence rig-down operations Completed |
Evidence:
|
Identify potential rig-down problems and take corrective action Completed |
Evidence:
|
Keep rig manager informed of operations Completed |
Evidence:
|
Conduct housekeeping activities
|
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Report issues identified with plant, tools and equipment Completed |
Evidence:
|
Prepare for drilling of surface hole/subsea hole
|
|
Check drilling and hoist equipment, report damage to rig manager and record Completed |
Evidence:
|
Conduct equipment checks for nippling-up or cross-checked with relevant procedures Completed |
Evidence:
|
Check handling equipment for correct sizing and if fit for purpose Completed |
Evidence:
|
Confirm availability of and inspect, clean, calibrate and record tubulars Completed |
Evidence:
|
Check well control equipment Completed |
Evidence:
|
Identify special tool requirements and check if fit for purpose and approved for use Completed |
Evidence:
|