NTISthis.com

Evidence Guide: RIIOGD503D - Oversee drilling operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIOGD503D - Oversee drilling operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to oversee drilling operations

  1. Access, interpret and apply overseeing drilling documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential hazards, risks and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for the work activity
  5. Obtain and interpret emergency procedures, and be prepared for an emergency
  6. Resolve coordination requirements with others at the site prior to commencing, during and on completion of work activities
Access, interpret and apply overseeing drilling documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential hazards, risks and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for an emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing, during and on completion of work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise drilling of surface hole

  1. Obtain copies of contract and well program, check and implement strategies designed and communicate to relevant personnel
  2. Select, obtain and confirm plant, tools, equipment and personnel are on hand for surface hole operations
  3. Prepare and check integrity of equipment, inspect casing and joints for damage
  4. Maintain written records and liaise with service companies to rectify faults
Obtain copies of contract and well program, check and implement strategies designed and communicate to relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, obtain and confirm plant, tools, equipment and personnel are on hand for surface hole operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare and check integrity of equipment, inspect casing and joints for damage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain written records and liaise with service companies to rectify faults

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise and participate in nippling up and pressure testing

  1. Organise equipment and nippling-up requirements for drilling out
  2. Identify and carry out pressure testing of all blow out prevention (BOP) equipment
  3. Carry out rig up to drill out
  4. Monitor drill out safety processes and test gauge leak off
Organise equipment and nippling-up requirements for drilling out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and carry out pressure testing of all blow out prevention (BOP) equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out rig up to drill out

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor drill out safety processes and test gauge leak off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Organise rig up and rig up to spud

  1. Assign crews to specific jobs and implement performance measures to monitor operations
  2. Implement monitoring strategies and checks in place to ensure integrity of operations
  3. Confirm verbal and written work instructions with operator’s representative for drilling hole
  4. Conduct crew meetings on total rig safety
  5. Report damage to plant, tools and equipment, repair or recommend corrective actions
  6. Ensure mud is mixed as per drilling program
  7. Carry out pre-spud safety inspections with circulation and spud-in established
  8. Undertake surveys and report variations to operator’s representative
  9. Maintain written records
  10. Supervise running in and cementing of casing with operators representative
Assign crews to specific jobs and implement performance measures to monitor operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Implement monitoring strategies and checks in place to ensure integrity of operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm verbal and written work instructions with operator’s representative for drilling hole

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct crew meetings on total rig safety

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report damage to plant, tools and equipment, repair or recommend corrective actions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure mud is mixed as per drilling program

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-spud safety inspections with circulation and spud-in established

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake surveys and report variations to operator’s representative

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain written records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supervise running in and cementing of casing with operators representative

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and abandon well

  1. Supervise completion and well abandonment with operator’s representative
  2. Make preparations to release rig and coordinate shutdown preparation list
  3. Abandon well
Supervise completion and well abandonment with operator’s representative

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Make preparations to release rig and coordinate shutdown preparation list

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Abandon well

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct housekeeping activities

  1. Clean, check, maintain and store plant, tools and equipment
  2. Report issues identified with plant, tools and equipment
Clean, check, maintain and store plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report issues identified with plant, tools and equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to oversee drilling operations

1.1 Access, interpret and apply overseeing drilling documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential hazards, risks and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for the work activity

1.5 Obtain and interpret emergency procedures, and be prepared for an emergency

1.6 Resolve coordination requirements with others at the site prior to commencing, during and on completion of work activities

2. Organise drilling of surface hole

2.1 Obtain copies of contract and well program, check and implement strategies designed and communicate to relevant personnel

2.2 Select, obtain and confirm plant, tools, equipment and personnel are on hand for surface hole operations

2.3 Prepare and check integrity of equipment, inspect casing and joints for damage

2.4 Maintain written records and liaise with service companies to rectify faults

3. Supervise and participate in nippling up and pressure testing

3.1 Organise equipment and nippling-up requirements for drilling out

3.2 Identify and carry out pressure testing of all blow out prevention (BOP) equipment

3.3 Carry out rig up to drill out

3.4 Monitor drill out safety processes and test gauge leak off

4. Organise rig up and rig up to spud

4.1 Assign crews to specific jobs and implement performance measures to monitor operations

4.2 Implement monitoring strategies and checks in place to ensure integrity of operations

4.3 Confirm verbal and written work instructions with operator’s representative for drilling hole

4.4 Conduct crew meetings on total rig safety

4.5 Report damage to plant, tools and equipment, repair or recommend corrective actions

4.6 Ensure mud is mixed as per drilling program

4.7 Carry out pre-spud safety inspections with circulation and spud-in established

4.8 Undertake surveys and report variations to operator’s representative

4.9 Maintain written records

4.10 Supervise running in and cementing of casing with operators representative

5. Complete and abandon well

5.1 Supervise completion and well abandonment with operator’s representative

5.2 Make preparations to release rig and coordinate shutdown preparation list

5.3 Abandon well

6. Conduct housekeeping activities

6.1 Clean, check, maintain and store plant, tools and equipment

6.2 Report issues identified with plant, tools and equipment

Required Skills and Knowledge

1. Plan and prepare to oversee drilling operations

1.1 Access, interpret and apply overseeing drilling documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential hazards, risks and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for the work activity

1.5 Obtain and interpret emergency procedures, and be prepared for an emergency

1.6 Resolve coordination requirements with others at the site prior to commencing, during and on completion of work activities

2. Organise drilling of surface hole

2.1 Obtain copies of contract and well program, check and implement strategies designed and communicate to relevant personnel

2.2 Select, obtain and confirm plant, tools, equipment and personnel are on hand for surface hole operations

2.3 Prepare and check integrity of equipment, inspect casing and joints for damage

2.4 Maintain written records and liaise with service companies to rectify faults

3. Supervise and participate in nippling up and pressure testing

3.1 Organise equipment and nippling-up requirements for drilling out

3.2 Identify and carry out pressure testing of all blow out prevention (BOP) equipment

3.3 Carry out rig up to drill out

3.4 Monitor drill out safety processes and test gauge leak off

4. Organise rig up and rig up to spud

4.1 Assign crews to specific jobs and implement performance measures to monitor operations

4.2 Implement monitoring strategies and checks in place to ensure integrity of operations

4.3 Confirm verbal and written work instructions with operator’s representative for drilling hole

4.4 Conduct crew meetings on total rig safety

4.5 Report damage to plant, tools and equipment, repair or recommend corrective actions

4.6 Ensure mud is mixed as per drilling program

4.7 Carry out pre-spud safety inspections with circulation and spud-in established

4.8 Undertake surveys and report variations to operator’s representative

4.9 Maintain written records

4.10 Supervise running in and cementing of casing with operators representative

5. Complete and abandon well

5.1 Supervise completion and well abandonment with operator’s representative

5.2 Make preparations to release rig and coordinate shutdown preparation list

5.3 Abandon well

6. Conduct housekeeping activities

6.1 Clean, check, maintain and store plant, tools and equipment

6.2 Report issues identified with plant, tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of overseeing drilling operations including:

identifying, addressing and reporting potential hazards and risks

controlling identified hazards

carrying out emergency response

identifying, addressing and reporting environmental issues

preparing written records and reports

obtaining and checking correct equipment and tools

ensuring pressure testing of all BOP equipment is carried out

ensuring rig up to drill out is carried out

monitoring drill out safety processes and test gauge leak off

complete and abandon well

rectifying and/or reporting faults and malfunctions

works effectively with others to plan, prepare and oversee drilling operations that meets all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

demonstrates completion of the overseeing drilling operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

obtaining, checking and providing correct equipment and tools

assigning crews to specific jobs

implementing performance measures to monitor operations

carrying out appropriate inspections

arranging servicing, repairing and/or returning equipment

carry out numerical calculations including:

addition, subtraction, multiplication, division

relate normal pressure to temperature

using calculator if required

using estimated skills

basic geometry

use of metric and imperials and conversion between the two

calculations relating to pressure density, volume, height, velocity, length, weight

measurements

The candidate must demonstrate knowledge in overseeing drilling operations through:

applying the organisation and site requirements and procedures for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage and erecting barriers

work health and safety

selecting and checking for faults, all plant, tools and equipment to carry out tasks

blow our prevention (BOP) specifications

casing tools and their applications

equipment types and uses

drill out procedures

testing

rig up to spud procedure

drilling programs

run in and cementing

well abandonment