The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for rig lease operations
|
|
Access, interpret and apply Carry out rig lease operations documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify, address and report potential hazards, risks and environmental issues and implement control measures Completed |
Evidence:
|
Select and wear personal protective equipment appropriate to the work activities Completed |
Evidence:
|
Adhere to coordination requirements with others at the site prior to, during and on completion of work activities and ensure briefings/handover details are communicated Completed |
Evidence:
|
Place and tier tubulures in appropriate racks Completed |
Evidence:
|
Measure, label and record tubulures Completed |
Evidence:
|
Operate front end loader in accordance with manufacturer’s specifications Completed |
Evidence:
|
Operate pneumatic and electric power tools
|
|
Operate pneumatic and electric power tools Completed |
Evidence:
|
Identify faults with equipment and repair or report to relevant personnel Completed |
Evidence:
|
Assist drill crew in running and recovery of BOP stack
|
|
Assist operator of air tugger winches as directed Completed |
Evidence:
|
Assist in positioning blow out prevention BOP Completed |
Evidence:
|
Assist crew by supplying tools to the drill floor as required Completed |
Evidence:
|
Provide labour for loading and unloading transport
|
|
Use approved safety approach Completed |
Evidence:
|
Use correct lifting techniques and operate forklift Completed |
Evidence:
|
Provide labour for making up drilling mud
|
|
Access and interpret safety data sheet Completed |
Evidence:
|
Lift sack material correctly Completed |
Evidence:
|
Use safety equipment correctly in event of personal contact with hazardous materials Completed |
Evidence:
|