NTISthis.com

Evidence Guide: RIIOGN302D - Operate mud pumps

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIOGN302D - Operate mud pumps

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare

  1. Access, interpret and apply Operate mud pumps documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify, address and report potential hazards, risks and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate to the work activities
  5. Conform to safe working practices and current legislative and operational requirements
  6. Adhere to coordination requirements with others at the site prior to, during and on completion of work activities and ensure briefings/handover details are communicated
  7. Confirm availability of necessary third party utilities
Access, interpret and apply Operate mud pumps documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards, risks and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate to the work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conform to safe working practices and current legislative and operational requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhere to coordination requirements with others at the site prior to, during and on completion of work activities and ensure briefings/handover details are communicated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm availability of necessary third party utilities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor mud pumps

  1. Visually inspect and listen to mud pumps for abnormal sounds or noise
  2. Check piston lubricating system
  3. Check pop-off valve setting
  4. Check pressure of suction and discharge dampeners
  5. Charge discharge dampener with nitrogen
Visually inspect and listen to mud pumps for abnormal sounds or noise

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check piston lubricating system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check pop-off valve setting

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check pressure of suction and discharge dampeners

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Charge discharge dampener with nitrogen

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain and repair mud pumps

  1. Check pony rod clamp when pump is turned off
  2. Lubricate gear end of pump and check oil levels in gear end of pump
  3. Identify faults or potential faults, record and report
  4. Identify, record and report requirement for repair or maintenance of mud pumps
  5. Replace defective swabs, liner, valves, seats and wear plates of the fluid end of pump
  6. Ready replacement parts for fluid end of pump
  7. Select and use correct liners and swabs
Check pony rod clamp when pump is turned off

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lubricate gear end of pump and check oil levels in gear end of pump

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify faults or potential faults, record and report

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, record and report requirement for repair or maintenance of mud pumps

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Replace defective swabs, liner, valves, seats and wear plates of the fluid end of pump

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ready replacement parts for fluid end of pump

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use correct liners and swabs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare

1.1. Access, interpret and apply Operate mud pumps documentation and ensure the work activity is compliant

1.2. Obtain, read, interpret, clarify and confirm work requirements

1.3. Identify, address and report potential hazards, risks and environmental issues and implement control measures

1.4. Select and wear personal protective equipment appropriate to the work activities

1.5. Conform to safe working practices and current legislative and operational requirements

1.6. Adhere to coordination requirements with others at the site prior to, during and on completion of work activities and ensure briefings/handover details are communicated

1.7. Confirm availability of necessary third party utilities

2. Monitor mud pumps

2.1. Visually inspect and listen to mud pumps for abnormal sounds or noise

2.2. Check piston lubricating system

2.3. Check pop-off valve setting

2.4. Check pressure of suction and discharge dampeners

2.5. Charge discharge dampener with nitrogen

3. Maintain and repair mud pumps

3.1. Check pony rod clamp when pump is turned off

3.2. Lubricate gear end of pump and check oil levels in gear end of pump

3.3. Identify faults or potential faults, record and report

3.4. Identify, record and report requirement for repair or maintenance of mud pumps

3.5. Replace defective swabs, liner, valves, seats and wear plates of the fluid end of pump

3.6. Ready replacement parts for fluid end of pump

3.7. Select and use correct liners and swabs

Required Skills and Knowledge

1. Plan and prepare

1.1. Access, interpret and apply Operate mud pumps documentation and ensure the work activity is compliant

1.2. Obtain, read, interpret, clarify and confirm work requirements

1.3. Identify, address and report potential hazards, risks and environmental issues and implement control measures

1.4. Select and wear personal protective equipment appropriate to the work activities

1.5. Conform to safe working practices and current legislative and operational requirements

1.6. Adhere to coordination requirements with others at the site prior to, during and on completion of work activities and ensure briefings/handover details are communicated

1.7. Confirm availability of necessary third party utilities

2. Monitor mud pumps

2.1. Visually inspect and listen to mud pumps for abnormal sounds or noise

2.2. Check piston lubricating system

2.3. Check pop-off valve setting

2.4. Check pressure of suction and discharge dampeners

2.5. Charge discharge dampener with nitrogen

3. Maintain and repair mud pumps

3.1. Check pony rod clamp when pump is turned off

3.2. Lubricate gear end of pump and check oil levels in gear end of pump

3.3. Identify faults or potential faults, record and report

3.4. Identify, record and report requirement for repair or maintenance of mud pumps

3.5. Replace defective swabs, liner, valves, seats and wear plates of the fluid end of pump

3.6. Ready replacement parts for fluid end of pump

3.7. Select and use correct liners and swabs