Evidence Guide: RIIRAI601D - Establish and maintain the site infrastructure and fixed plant systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIRAI601D - Establish and maintain the site infrastructure and fixed plant systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare site infrastructure and fixed plant systems

  1. Access, interpret and apply site infrastructure and fixed plant systems documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Complete and/or confirm feasibility analysis
  6. Obtain and confirm statutory/legal approvals
  7. Carry out title searches
  8. Prepare detailed plans, budgets, financial models, in accordance with the feasibility analysis
  9. Prepare requirements for fixed plant and infrastructure within the general site development proposal and submit to the organisation, board or executive for endorsement
  10. Collect, analyse and organise strategic resource planning information in preparation for decision making
  11. Estimate impacts on the organisation business plans, and the financial benefit from fixed plant or infrastructure changes
Access, interpret and apply site infrastructure and fixed plant systems documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and/or confirm feasibility analysis

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and confirm statutory/legal approvals

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out title searches

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed plans, budgets, financial models, in accordance with the feasibility analysis

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare requirements for fixed plant and infrastructure within the general site development proposal and submit to the organisation, board or executive for endorsement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect, analyse and organise strategic resource planning information in preparation for decision making

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate impacts on the organisation business plans, and the financial benefit from fixed plant or infrastructure changes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop and test the detailed site infrastructure proposal

  1. Access, identify and interpret the legislative, statutory and likely site requirements related to infrastructure
  2. Identify the requirements for and purpose of infrastructure items in accordance with site design and system of mining
  3. Develop specifications for infrastructure items from a comprehensive analysis of site requirements
  4. Identify infrastructure options from an analysis of all relevant technical, operational and financial information
  5. Select preferred infrastructure options on the basis of projected performance against specification requirements
  6. Assess, by visit, and confirm potential infrastructure sites/routes and capacities, entered on the site plan
Access, identify and interpret the legislative, statutory and likely site requirements related to infrastructure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the requirements for and purpose of infrastructure items in accordance with site design and system of mining

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop specifications for infrastructure items from a comprehensive analysis of site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify infrastructure options from an analysis of all relevant technical, operational and financial information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select preferred infrastructure options on the basis of projected performance against specification requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess, by visit, and confirm potential infrastructure sites/routes and capacities, entered on the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop and test the detailed site plant proposal

  1. Access, identify and interpret the legislative, statutory and site requirements related to required fixed plant
  2. Identify the requirements for and purpose of fixed plant in accordance with site design and system of mining
  3. Identify supporting mobile plant requirements
  4. Develop specifications for plant from a comprehensive analysis of site requirements
  5. Identify plant options from an analysis of all relevant technical, operational and financial information
  6. Select preferred plant options on the basis of projected performance against specification requirements
  7. Assess by visit and confirm potential sites for fixed plant, entered on the site plan
Access, identify and interpret the legislative, statutory and site requirements related to required fixed plant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the requirements for and purpose of fixed plant in accordance with site design and system of mining

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify supporting mobile plant requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop specifications for plant from a comprehensive analysis of site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify plant options from an analysis of all relevant technical, operational and financial information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select preferred plant options on the basis of projected performance against specification requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess by visit and confirm potential sites for fixed plant, entered on the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and record site infrastructure and plant system approvals

  1. Prepare detailed proposals for the site infrastructure components, layout, specifications and costs
  2. Prepare detailed proposals for the site plant items, specifications, the locations of fixed plant and costs
  3. Prepare detailed proposals for supporting plant items and costs
  4. Obtain formal approvals for the proposed site infrastructure and plant systems in accordance with enterprise policies
  5. Vary the site infrastructure and plant systems records to reflect any approval conditions and finalise in preparation for implementation
Prepare detailed proposals for the site infrastructure components, layout, specifications and costs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed proposals for the site plant items, specifications, the locations of fixed plant and costs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed proposals for supporting plant items and costs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain formal approvals for the proposed site infrastructure and plant systems in accordance with enterprise policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vary the site infrastructure and plant systems records to reflect any approval conditions and finalise in preparation for implementation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish systems for audit and review of site infrastructure and plant system

  1. Establish audit/review procedures and schedule
  2. Identify and assess future systems and equipment requirements and incorporate into planning processes
  3. Establish procedures for incorporating feedback into the audit/review system
  4. Establish procedures for response to instances of non-compliance or other discrepancies/deficiencies revealed by audit
Establish audit/review procedures and schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and assess future systems and equipment requirements and incorporate into planning processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish procedures for incorporating feedback into the audit/review system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish procedures for response to instances of non-compliance or other discrepancies/deficiencies revealed by audit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare site infrastructure and fixed plant systems

  1. Access, interpret and apply site infrastructure and fixed plant systems documentation and ensure the work activity is compliant
  2. Obtain, read, interpret, clarify and confirm work requirements
  3. Identify and address potential risks, hazards and environmental issues and implement control measures
  4. Select and wear personal protective equipment appropriate for work activities
  5. Complete and/or confirm feasibility analysis
  6. Obtain and confirm statutory/legal approvals
  7. Carry out title searches
  8. Prepare detailed plans, budgets, financial models, in accordance with the feasibility analysis
  9. Prepare requirements for fixed plant and infrastructure within the general site development proposal and submit to the organisation, board or executive for endorsement
  10. Collect, analyse and organise strategic resource planning information in preparation for decision making
  11. Estimate impacts on the organisation business plans, and the financial benefit from fixed plant or infrastructure changes
Access, interpret and apply site infrastructure and fixed plant systems documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete and/or confirm feasibility analysis

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and confirm statutory/legal approvals

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out title searches

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed plans, budgets, financial models, in accordance with the feasibility analysis

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare requirements for fixed plant and infrastructure within the general site development proposal and submit to the organisation, board or executive for endorsement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect, analyse and organise strategic resource planning information in preparation for decision making

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Estimate impacts on the organisation business plans, and the financial benefit from fixed plant or infrastructure changes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop and test the detailed site infrastructure proposal

  1. Access, identify and interpret the legislative, statutory and likely site requirements related to infrastructure
  2. Identify the requirements for and purpose of infrastructure items in accordance with site design and system of mining
  3. Develop specifications for infrastructure items from a comprehensive analysis of site requirements
  4. Identify infrastructure options from an analysis of all relevant technical, operational and financial information
  5. Select preferred infrastructure options on the basis of projected performance against specification requirements
  6. Assess, by visit, and confirm potential infrastructure sites/routes and capacities, entered on the site plan
Access, identify and interpret the legislative, statutory and likely site requirements related to infrastructure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the requirements for and purpose of infrastructure items in accordance with site design and system of mining

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop specifications for infrastructure items from a comprehensive analysis of site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify infrastructure options from an analysis of all relevant technical, operational and financial information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select preferred infrastructure options on the basis of projected performance against specification requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess, by visit, and confirm potential infrastructure sites/routes and capacities, entered on the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop and test the detailed site plant proposal

  1. Access, identify and interpret the legislative, statutory and site requirements related to required fixed plant
  2. Identify the requirements for and purpose of fixed plant in accordance with site design and system of mining
  3. Identify supporting mobile plant requirements
  4. Develop specifications for plant from a comprehensive analysis of site requirements
  5. Identify plant options from an analysis of all relevant technical, operational and financial information
  6. Select preferred plant options on the basis of projected performance against specification requirements
  7. Assess by visit and confirm potential sites for fixed plant, entered on the site plan
Access, identify and interpret the legislative, statutory and site requirements related to required fixed plant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify the requirements for and purpose of fixed plant in accordance with site design and system of mining

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify supporting mobile plant requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop specifications for plant from a comprehensive analysis of site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify plant options from an analysis of all relevant technical, operational and financial information

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select preferred plant options on the basis of projected performance against specification requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess by visit and confirm potential sites for fixed plant, entered on the site plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and record site infrastructure and plant system approvals

  1. Prepare detailed proposals for the site infrastructure components, layout, specifications and costs
  2. Prepare detailed proposals for the site plant items, specifications, the locations of fixed plant and costs
  3. Prepare detailed proposals for supporting plant items and costs
  4. Obtain formal approvals for the proposed site infrastructure and plant systems in accordance with enterprise policies
  5. Vary the site infrastructure and plant systems records to reflect any approval conditions and finalise in preparation for implementation
Prepare detailed proposals for the site infrastructure components, layout, specifications and costs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed proposals for the site plant items, specifications, the locations of fixed plant and costs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare detailed proposals for supporting plant items and costs

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain formal approvals for the proposed site infrastructure and plant systems in accordance with enterprise policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vary the site infrastructure and plant systems records to reflect any approval conditions and finalise in preparation for implementation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish systems for audit and review of site infrastructure and plant system

  1. Establish audit/review procedures and schedule
  2. Identify and assess future systems and equipment requirements and incorporate into planning processes
  3. Establish procedures for incorporating feedback into the audit/review system
  4. Establish procedures for response to instances of non-compliance or other discrepancies/deficiencies revealed by audit
Establish audit/review procedures and schedule

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and assess future systems and equipment requirements and incorporate into planning processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish procedures for incorporating feedback into the audit/review system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish procedures for response to instances of non-compliance or other discrepancies/deficiencies revealed by audit

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare site infrastructure and fixed plant systems

1.1 Access, interpret and apply site infrastructure and fixed plant systems documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Complete and/or confirm feasibility analysis

1.6 Obtain and confirm statutory/legal approvals

1.7 Carry out title searches

1.8 Prepare detailed plans, budgets, financial models, in accordance with the feasibility analysis

1.9 Prepare requirements for fixed plant and infrastructure within the general site development proposal and submit to the organisation, board or executive for endorsement

1.10 Collect, analyse and organise strategic resource planning information in preparation for decision making

1.11 Estimate impacts on the organisation business plans, and the financial benefit from fixed plant or infrastructure changes

2. Develop and test the detailed site infrastructure proposal

2.1 Access, identify and interpret the legislative, statutory and likely site requirements related to infrastructure

2.2 Identify the requirements for and purpose of infrastructure items in accordance with site design and system of mining

2.3 Develop specifications for infrastructure items from a comprehensive analysis of site requirements

2.4 Identify infrastructure options from an analysis of all relevant technical, operational and financial information

2.5 Select preferred infrastructure options on the basis of projected performance against specification requirements

2.6 Assess, by visit, and confirm potential infrastructure sites/routes and capacities, entered on the site plan

3. Develop and test the detailed site plant proposal

3.1 Access, identify and interpret the legislative, statutory and site requirements related to required fixed plant

3.2 Identify the requirements for and purpose of fixed plant in accordance with site design and system of mining

3.3 Identify supporting mobile plant requirements

3.4 Develop specifications for plant from a comprehensive analysis of site requirements

3.5 Identify plant options from an analysis of all relevant technical, operational and financial information

3.6 Select preferred plant options on the basis of projected performance against specification requirements

3.7 Assess by visit and confirm potential sites for fixed plant, entered on the site plan

4. Obtain and record site infrastructure and plant system approvals

4.1 Prepare detailed proposals for the site infrastructure components, layout, specifications and costs

4.2 Prepare detailed proposals for the site plant items, specifications, the locations of fixed plant and costs

4.3 Prepare detailed proposals for supporting plant items and costs

4.4 Obtain formal approvals for the proposed site infrastructure and plant systems in accordance with enterprise policies

4.5 Vary the site infrastructure and plant systems records to reflect any approval conditions and finalise in preparation for implementation

5. Establish systems for audit and review of site infrastructure and plant system

5.1 Establish audit/review procedures and schedule

5.2 Identify and assess future systems and equipment requirements and incorporate into planning processes

5.3 Establish procedures for incorporating feedback into the audit/review system

5.4 Establish procedures for response to instances of non-compliance or other discrepancies/deficiencies revealed by audit

Required Skills and Knowledge

1. Plan and prepare site infrastructure and fixed plant systems

1.1 Access, interpret and apply site infrastructure and fixed plant systems documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Complete and/or confirm feasibility analysis

1.6 Obtain and confirm statutory/legal approvals

1.7 Carry out title searches

1.8 Prepare detailed plans, budgets, financial models, in accordance with the feasibility analysis

1.9 Prepare requirements for fixed plant and infrastructure within the general site development proposal and submit to the organisation, board or executive for endorsement

1.10 Collect, analyse and organise strategic resource planning information in preparation for decision making

1.11 Estimate impacts on the organisation business plans, and the financial benefit from fixed plant or infrastructure changes

2. Develop and test the detailed site infrastructure proposal

2.1 Access, identify and interpret the legislative, statutory and likely site requirements related to infrastructure

2.2 Identify the requirements for and purpose of infrastructure items in accordance with site design and system of mining

2.3 Develop specifications for infrastructure items from a comprehensive analysis of site requirements

2.4 Identify infrastructure options from an analysis of all relevant technical, operational and financial information

2.5 Select preferred infrastructure options on the basis of projected performance against specification requirements

2.6 Assess, by visit, and confirm potential infrastructure sites/routes and capacities, entered on the site plan

3. Develop and test the detailed site plant proposal

3.1 Access, identify and interpret the legislative, statutory and site requirements related to required fixed plant

3.2 Identify the requirements for and purpose of fixed plant in accordance with site design and system of mining

3.3 Identify supporting mobile plant requirements

3.4 Develop specifications for plant from a comprehensive analysis of site requirements

3.5 Identify plant options from an analysis of all relevant technical, operational and financial information

3.6 Select preferred plant options on the basis of projected performance against specification requirements

3.7 Assess by visit and confirm potential sites for fixed plant, entered on the site plan

4. Obtain and record site infrastructure and plant system approvals

4.1 Prepare detailed proposals for the site infrastructure components, layout, specifications and costs

4.2 Prepare detailed proposals for the site plant items, specifications, the locations of fixed plant and costs

4.3 Prepare detailed proposals for supporting plant items and costs

4.4 Obtain formal approvals for the proposed site infrastructure and plant systems in accordance with enterprise policies

4.5 Vary the site infrastructure and plant systems records to reflect any approval conditions and finalise in preparation for implementation

5. Establish systems for audit and review of site infrastructure and plant system

5.1 Establish audit/review procedures and schedule

5.2 Identify and assess future systems and equipment requirements and incorporate into planning processes

5.3 Establish procedures for incorporating feedback into the audit/review system

5.4 Establish procedures for response to instances of non-compliance or other discrepancies/deficiencies revealed by audit

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

implements procedures and techniques for the safe, effective and efficient completion of the establishing and maintenance of site infrastructure and fixed plant systems including:

accessing, interpreting and applying procedures for;

development and review of business plans

resource plan development

project budget preparation

title searches

statutory and legal approval applications

project management strategies

techniques to implement change

using appropriate technologies

preparation and presentation of management reports

negotiation with internal/external customers, community and statutory/legal authorities

conflict resolution

technical information

site/legislative requirements

records and reports

principles of site design

hazard identification and risk management

work planning and coordination

training needs analysis

using manufacturer’s instructions

maintenance surveys

works effectively with others to undertake and complete the establishing and maintenance of site infrastructure and fixed plant systems including:

managing people and processes

resolving conflict

coordinating human, financial and physical resources

developing, initiating and administering work plans

interpreting and applying operational performance data

engaging internal and external stakeholders

briefings and handover details

demonstrates completion of establishing and maintenance of site infrastructure and fixed plant system that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identification of the relevant information and scope of the work

identifying the full range of specification requirements

identifying all aspects of the site infrastructure and fixed plant systems

identification and selection of viable options for the establishment and maintenance of site infrastructure and fixed plant systems that best meet the required outcomes through:

accessing, interpreting and applying feasibility analysis

analysis of impacts of infrastructure options from relevant technical, operational and financial information

analysis of impacts of plant options from relevant technical, operational and financial information

providing detailed plans, budgets, financial models, in accordance with the feasibility analysis

establishing the audit and review system

The candidate must demonstrate knowledge in establishing and maintaining the site infrastructure and fixed plant systems through:

legislative, organisation and site requirements and procedures for;

risk management

statutory/legal control

conducting surveying

titles management

organisational change and development

project management

computer applications

financial models

site design

mining operations, plant and equipment

negotiation techniques

organisational objectives

planning and strategic management

resource quantification