Evidence Guide: RIISRM502D - Design stockpile formations and reclaiming systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIISRM502D - Design stockpile formations and reclaiming systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare stockpile formations and reclaiming systems

  1. Access, interpret and apply stockpiling and reclaiming systems documentation and ensure the work activity is compliant
  2. Analyse and document organisation goals, objectives and strategies for stockpile management
  3. Investigate and analyse worksite environments, and develop options, strategies and anticipated outcomes
  4. Evaluate economics and efficiency of the stock piling system options and configurations
  5. Identify and implement statutory requirements for locating of plant and stockpile
Access, interpret and apply stockpiling and reclaiming systems documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse and document organisation goals, objectives and strategies for stockpile management

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Investigate and analyse worksite environments, and develop options, strategies and anticipated outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate economics and efficiency of the stock piling system options and configurations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement statutory requirements for locating of plant and stockpile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design stockpile configuration

  1. Design stockpile configuration with appropriate drainage system
  2. Design reclaim systems to match stockpile configuration
  3. Match load mechanisms to stockpile requirements
  4. Design and install dust control measures to ensure correct operations
  5. Plan and organise, supervision and safety requirements associated with the operation and machine movements
  6. Ensure a program to satisfy identified stockpiling training requirements is implemented
Design stockpile configuration with appropriate drainage system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design reclaim systems to match stockpile configuration

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Match load mechanisms to stockpile requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design and install dust control measures to ensure correct operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and organise, supervision and safety requirements associated with the operation and machine movements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure a program to satisfy identified stockpiling training requirements is implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor stockpile operations

  1. Instruct operators on the outcomes required including Work Health & Safety issues and safe work procedures
  2. Monitor stockpiling operation including surveying, forming, order, dumping or ramp
  3. Monitor material removal from stockpile in accordance to Quality Assurance specifications
  4. Assess and reconcile stock quantities
Instruct operators on the outcomes required including Work Health & Safety issues and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor stockpiling operation including surveying, forming, order, dumping or ramp

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor material removal from stockpile in accordance to Quality Assurance specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and reconcile stock quantities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish audit and review of systems

  1. Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements
  2. Ensure future stockpile systems and equipment requirements are identified and assessed and incorporate into planning processes
  3. Establish procedures to confirm the currency and compliance of stockpile formations and reclaiming systems
  4. Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented
  5. Audit the stockpile training program for currency and relevance
  6. Ensure procedures for incorporating feedback into the audit/review system are developed and implemented
  7. Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements
  8. Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented
Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure future stockpile systems and equipment requirements are identified and assessed and incorporate into planning processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish procedures to confirm the currency and compliance of stockpile formations and reclaiming systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Audit the stockpile training program for currency and relevance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure procedures for incorporating feedback into the audit/review system are developed and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare stockpile formations and reclaiming systems

  1. Access, interpret and apply stockpiling and reclaiming systems documentation and ensure the work activity is compliant
  2. Analyse and document organisation goals, objectives and strategies for stockpile management
  3. Investigate and analyse worksite environments, and develop options, strategies and anticipated outcomes
  4. Evaluate economics and efficiency of the stock piling system options and configurations
  5. Identify and implement statutory requirements for locating of plant and stockpile
Access, interpret and apply stockpiling and reclaiming systems documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse and document organisation goals, objectives and strategies for stockpile management

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Investigate and analyse worksite environments, and develop options, strategies and anticipated outcomes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate economics and efficiency of the stock piling system options and configurations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and implement statutory requirements for locating of plant and stockpile

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design stockpile configuration

  1. Design stockpile configuration with appropriate drainage system
  2. Design reclaim systems to match stockpile configuration
  3. Match load mechanisms to stockpile requirements
  4. Design and install dust control measures to ensure correct operations
  5. Plan and organise, supervision and safety requirements associated with the operation and machine movements
  6. Ensure a program to satisfy identified stockpiling training requirements is implemented
Design stockpile configuration with appropriate drainage system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design reclaim systems to match stockpile configuration

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Match load mechanisms to stockpile requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design and install dust control measures to ensure correct operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and organise, supervision and safety requirements associated with the operation and machine movements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure a program to satisfy identified stockpiling training requirements is implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor stockpile operations

  1. Instruct operators on the outcomes required including Work Health & Safety issues and safe work procedures
  2. Monitor stockpiling operation including surveying, forming, order, dumping or ramp
  3. Monitor material removal from stockpile in accordance to Quality Assurance specifications
  4. Assess and reconcile stock quantities
Instruct operators on the outcomes required including Work Health & Safety issues and safe work procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor stockpiling operation including surveying, forming, order, dumping or ramp

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor material removal from stockpile in accordance to Quality Assurance specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and reconcile stock quantities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish audit and review of systems

  1. Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements
  2. Ensure future stockpile systems and equipment requirements are identified and assessed and incorporate into planning processes
  3. Establish procedures to confirm the currency and compliance of stockpile formations and reclaiming systems
  4. Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented
  5. Audit the stockpile training program for currency and relevance
  6. Ensure procedures for incorporating feedback into the audit/review system are developed and implemented
  7. Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements
  8. Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented
Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure future stockpile systems and equipment requirements are identified and assessed and incorporate into planning processes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Establish procedures to confirm the currency and compliance of stockpile formations and reclaiming systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Audit the stockpile training program for currency and relevance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure procedures for incorporating feedback into the audit/review system are developed and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare stockpile formations and reclaiming systems

1.1 Access, interpret and apply stockpiling and reclaiming systems documentation and ensure the work activity is compliant

1.2 Analyse and document organisation goals, objectives and strategies for stockpile management

1.3 Investigate and analyse worksite environments, and develop options, strategies and anticipated outcomes

1.4 Evaluate economics and efficiency of the stock piling system options and configurations

1.5 Identify and implement statutory requirements for locating of plant and stockpile

2. Design stockpile configuration

2.1 Design stockpile configuration with appropriate drainage system

2.2 Design reclaim systems to match stockpile configuration

2.3 Match load mechanisms to stockpile requirements

2.4 Design and install dust control measures to ensure correct operations

2.5 Plan and organise, supervision and safety requirements associated with the operation and machine movements

2.6 Ensure a program to satisfy identified stockpiling training requirements is implemented

3. Monitor stockpile operations

3.1 Instruct operators on the outcomes required including Work Health & Safety issues and safe work procedures

3.2 Monitor stockpiling operation including surveying, forming, order, dumping or ramp

3.3 Monitor material removal from stockpile in accordance to Quality Assurance specifications

3.4 Assess and reconcile stock quantities

4. Establish audit and review of systems

4.1 Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements

4.2 Ensure future stockpile systems and equipment requirements are identified and assessed and incorporate into planning processes

4.3 Establish procedures to confirm the currency and compliance of stockpile formations and reclaiming systems

4.4 Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented

4.5 Audit the stockpile training program for currency and relevance

4.6 Ensure procedures for incorporating feedback into the audit/review system are developed and implemented

4.7 Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements

4.8 Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented

Required Skills and Knowledge

1. Plan and prepare stockpile formations and reclaiming systems

1.1 Access, interpret and apply stockpiling and reclaiming systems documentation and ensure the work activity is compliant

1.2 Analyse and document organisation goals, objectives and strategies for stockpile management

1.3 Investigate and analyse worksite environments, and develop options, strategies and anticipated outcomes

1.4 Evaluate economics and efficiency of the stock piling system options and configurations

1.5 Identify and implement statutory requirements for locating of plant and stockpile

2. Design stockpile configuration

2.1 Design stockpile configuration with appropriate drainage system

2.2 Design reclaim systems to match stockpile configuration

2.3 Match load mechanisms to stockpile requirements

2.4 Design and install dust control measures to ensure correct operations

2.5 Plan and organise, supervision and safety requirements associated with the operation and machine movements

2.6 Ensure a program to satisfy identified stockpiling training requirements is implemented

3. Monitor stockpile operations

3.1 Instruct operators on the outcomes required including Work Health & Safety issues and safe work procedures

3.2 Monitor stockpiling operation including surveying, forming, order, dumping or ramp

3.3 Monitor material removal from stockpile in accordance to Quality Assurance specifications

3.4 Assess and reconcile stock quantities

4. Establish audit and review of systems

4.1 Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements

4.2 Ensure future stockpile systems and equipment requirements are identified and assessed and incorporate into planning processes

4.3 Establish procedures to confirm the currency and compliance of stockpile formations and reclaiming systems

4.4 Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented

4.5 Audit the stockpile training program for currency and relevance

4.6 Ensure procedures for incorporating feedback into the audit/review system are developed and implemented

4.7 Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements

4.8 Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

works effectively with others to undertake and effective design of stockpile formations and reclaiming systems to meet all required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to issue and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

demonstrates completion of the design of stockpile formations and reclaiming systems that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

analysing and documenting goals, objectives and strategies

investigating and analysing work environment

developing systems to achieve indicated goals and objectives

designing stockpile configuration and drainage systems

designing reclaim systems

establishing and implementing dust control measures

monitoring stockpile operations

establishing systems for audit, review and documentation of stockpile systems, emergency procedures, training programs and non-compliance

The candidate must demonstrate knowledge of designing stockpile formations and reclaiming systems through:

hazard identification, risk assessment and risk treatment processes

application of consultative, coaching and leadership techniques

plant and equipment capabilities and limitations

strategic planning techniques for designing stockpile formations and reclaiming systems

auditing, monitoring, recording and reporting systems, in consultation with stakeholders

training systems, identification of training needs for individuals and work groups, and implementation of training plans

consultation, emergency response and evacuation planning processes and techniques

risk management processes and techniques

organisational change and development process

action plans

environmental monitoring requirements

procedures for managing personnel, processes projects and tasks

coordinating of resources – human, financial and physical

procedures for managing surface mining traffic, equipment and maintenance systems

contract negotiation and finalisation techniques and requirements