Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUMM201D - Install ground support

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to install ground support

  1. Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions
  3. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  4. Select, and check for faults, equipment/tools for the activity
  5. Arrange for delivery of ground support materials to site
  6. Inspect and assess site conditions and determine if scaling is required and take action
  7. Conduct equipment pre-start checks and start up procedures
  8. Identify, address and report environmental issues, potential risks and hazards
  9. Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site
  10. Use approved dust suppression and extraction equipment/methods
Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment/tools for the activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange for delivery of ground support materials to site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions and determine if scaling is required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks and start up procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential risks and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction equipment/methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install ground support

  1. Assemble and install reinforcement components according to ground control plan
  2. Install reinforcement components with appropriate fixative
  3. Install reinforcement components following contour of ground and according to ground conditions
  4. Tension external reinforcement components according to ground control conditions
Assemble and install reinforcement components according to ground control plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install reinforcement components with appropriate fixative

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install reinforcement components following contour of ground and according to ground conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tension external reinforcement components according to ground control conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct housekeeping activities

  1. Clear work area and dispose of or recycle materials
  2. Clean and maintain condition of equipment, ensure suitability for use, and address/report issues
  3. Manage and/or report hazards, and maintain a safe working environment
  4. . Process and maintain written records
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and maintain condition of equipment, ensure suitability for use, and address/report issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage and/or report hazards, and maintain a safe working environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

. Process and maintain written records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to install ground support

  1. Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions
  3. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  4. Select, and check for faults, equipment/tools for the activity
  5. Arrange for delivery of ground support materials to site
  6. Inspect and assess site conditions and determine if scaling is required and take action
  7. Conduct equipment pre-start checks and start up procedures
  8. Identify, address and report environmental issues, potential risks and hazards
  9. Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site
  10. Use approved dust suppression and extraction equipment/methods
Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment/tools for the activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrange for delivery of ground support materials to site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions and determine if scaling is required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks and start up procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential risks and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction equipment/methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install ground support

  1. Assemble and install reinforcement components according to ground control plan
  2. Install reinforcement components with appropriate fixative
  3. Install reinforcement components following contour of ground and according to ground conditions
  4. Tension external reinforcement components according to ground control conditions
Assemble and install reinforcement components according to ground control plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install reinforcement components with appropriate fixative

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install reinforcement components following contour of ground and according to ground conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tension external reinforcement components according to ground control conditions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct housekeeping activities

  1. Clear work area and dispose of or recycle materials
  2. Clean and maintain condition of equipment, ensure suitability for use, and address/report issues
  3. Manage and/or report hazards, and maintain a safe working environment
  4. Process and maintain written records
Clear work area and dispose of or recycle materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and maintain condition of equipment, ensure suitability for use, and address/report issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manage and/or report hazards, and maintain a safe working environment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process and maintain written records

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to install ground support

1.1. Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions

1.3. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.4. Select, and check for faults, equipment/tools for the activity

1.5. Arrange for delivery of ground support materials to site

1.6. Inspect and assess site conditions and determine if scaling is required and take action

1.7. Conduct equipment pre-start checks and start up procedures

1.8. Identify, address and report environmental issues, potential risks and hazards

1.9. Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site

1.10. Use approved dust suppression and extraction equipment/methods

2. Install ground support

2.1. Assemble and install reinforcement components according to ground control plan

2.2. Install reinforcement components with appropriate fixative

2.3. Install reinforcement components following contour of ground and according to ground conditions

2.4. Tension external reinforcement components according to ground control conditions

3. Conduct housekeeping activities

3.1. Clear work area and dispose of or recycle materials

3.2. Clean and maintain condition of equipment, ensure suitability for use, and address/report issues

3.3. Manage and/or report hazards, and maintain a safe working environment

3.4. Process and maintain written records

Required Skills and Knowledge

1. Plan and prepare to install ground support

1.1. Access, interpret and apply installation of ground support documentation and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions

1.3. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.4. Select, and check for faults, equipment/tools for the activity

1.5. Arrange for delivery of ground support materials to site

1.6. Inspect and assess site conditions and determine if scaling is required and take action

1.7. Conduct equipment pre-start checks and start up procedures

1.8. Identify, address and report environmental issues, potential risks and hazards

1.9. Inspect and assess appropriateness of ground control mechanism/plan to ensure safety of site

1.10. Use approved dust suppression and extraction equipment/methods

2. Install ground support

2.1. Assemble and install reinforcement components according to ground control plan

2.2. Install reinforcement components with appropriate fixative

2.3. Install reinforcement components following contour of ground and according to ground conditions

2.4. Tension external reinforcement components according to ground control conditions

3. Conduct housekeeping activities

3.1. Clear work area and dispose of or recycle materials

3.2. Clean and maintain condition of equipment, ensure suitability for use, and address/report issues

3.3. Manage and/or report hazards, and maintain a safe working environment

3.4. Process and maintain written records

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of ground support installation including:

using appropriate dust suppression and extraction methods

works effectively with others to undertake and complete the installation of ground support that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions, and convey work progress

demonstrates completion of ground support installation that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting equipment pre-start checks and start up procedures

assembling and installing reinforcement components appropriately

conducting housekeeping activities

The candidate must demonstrate knowledge in ground support installation through:

equipment safety requirements

environmental issues

handling and transport hazardous substances

site inspection

equipment isolation

manufacturer’s specifications

basic geological and technical data

ground control characteristics and applications

dust suppression and extraction methods

using reinforcement components