NTISthis.com

Evidence Guide: RIIUMM301D - Conduct wet filling activities

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUMM301D - Conduct wet filling activities

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for wet filling

  1. Access, interpret and apply wet filling documentation, and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions
  3. Select and wear appropriate personal protective equipment
  4. Use approved dust suppression and extraction methods
  5. Select, and check for faults, equipment/tools for the activity
  6. Conduct equipment pre-start checks and start up procedures
  7. Identify, address and report environmental issues, potential risks and hazards
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  9. Inspect and assess site conditions and determine if scaling is required
  10. Ensure work area is well ventilated before entry
Access, interpret and apply wet filling documentation, and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear appropriate personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment/tools for the activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks and start up procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential risks and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions and determine if scaling is required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure work area is well ventilated before entry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fill voids

  1. Fill void in controlled manner according to characteristics of fill
Fill void in controlled manner according to characteristics of fill

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drain and monitor fill

  1. Manage and monitor drainage system according to engineering specifications
  2. Inspect bulkheads for faults, water flow and/or defects
  3. Monitor and manage dimensions of fill using approved indicators
  4. Process written and verbal records and reporting requirements
Manage and monitor drainage system according to engineering specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect bulkheads for faults, water flow and/or defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage dimensions of fill using approved indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written and verbal records and reporting requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for wet filling

  1. Access, interpret and apply wet filling documentation, and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work instructions
  3. Select and wear appropriate personal protective equipment
  4. Use approved dust suppression and extraction methods
  5. Select, and check for faults, equipment/tools for the activity
  6. Conduct equipment pre-start checks and start up procedures
  7. Identify, address and report environmental issues, potential risks and hazards
  8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  9. Inspect and assess site conditions and determine if scaling is required
  10. Ensure work area is well ventilated before entry
  11. Fill void in controlled manner according to characteristics of fill
Access, interpret and apply wet filling documentation, and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear appropriate personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, equipment/tools for the activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start checks and start up procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues, potential risks and hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions and determine if scaling is required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure work area is well ventilated before entry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fill void in controlled manner according to characteristics of fill

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drain and monitor fill

  1. Manage and monitor drainage system according to engineering specifications
  2. Inspect bulkheads for faults, water flow and/or defects
  3. Monitor and manage dimensions of fill using approved indicators
  4. Process written and verbal records and reporting requirements
Manage and monitor drainage system according to engineering specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect bulkheads for faults, water flow and/or defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage dimensions of fill using approved indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written and verbal records and reporting requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for wet filling

1.1. Access, interpret and apply wet filling documentation, and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions

1.3. Select and wear appropriate personal protective equipment

1.4. Use approved dust suppression and extraction methods

1.5. Select, and check for faults, equipment/tools for the activity

1.6. Conduct equipment pre-start checks and start up procedures

1.7. Identify, address and report environmental issues, potential risks and hazards

1.8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.9. Inspect and assess site conditions and determine if scaling is required

1.10. Ensure work area is well ventilated before entry

2. Fill voids

2.1 Fill void in controlled manner according to characteristics of fill

3. Drain and monitor fill

3.1. Manage and monitor drainage system according to engineering specifications

3.2. Inspect bulkheads for faults, water flow and/or defects

3.3. Monitor and manage dimensions of fill using approved indicators

3.4. Process written and verbal records and reporting requirements

Required Skills and Knowledge

1. Plan and prepare for wet filling

1.1. Access, interpret and apply wet filling documentation, and ensure the work activity is compliant

1.2. Obtain, interpret, clarify and confirm work instructions

1.3. Select and wear appropriate personal protective equipment

1.4. Use approved dust suppression and extraction methods

1.5. Select, and check for faults, equipment/tools for the activity

1.6. Conduct equipment pre-start checks and start up procedures

1.7. Identify, address and report environmental issues, potential risks and hazards

1.8. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

1.9. Inspect and assess site conditions and determine if scaling is required

1.10. Ensure work area is well ventilated before entry

2. Fill voids

2.1 Fill void in controlled manner according to characteristics of fill

3. Drain and monitor fill

3.1. Manage and monitor drainage system according to engineering specifications

3.2. Inspect bulkheads for faults, water flow and/or defects

3.3. Monitor and manage dimensions of fill using approved indicators

3.4. Process written and verbal records and reporting requirements

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of set installation including:

using appropriate dust suppression and extraction methods

works effectively with others to undertake and complete the conduct of wet filling activities that meets all of the required outcomes including:

communicating clearly and concisely with others to receive and clarify work instructions, and convey work progress

demonstrates completion of conducting of wet filling that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

conducting equipment pre-start checks and start up procedures

inspecting and assessing site conditions to determine if scaling is required

filling void in controlled manner according to characteristics of fill

inspecting bulk head for faults and defects

using at least two (2) of the following fill materials:

combination of wet and dry

paste

wet

monitoring the drainage system against engineering specifications

maintaining written and verbal reporting requirements and procedures

The candidate must demonstrate knowledge in conducting wet filling activities through:

risk assessment and hazard management

assessing voids

filling voids

backfilling

identifying bulk heads and defects

handling and transporting hazardous substances

working safely underground

work, health and safety

accessing, interpreting and applying mine operational systems

being prepared for events for fire/accident/emergency