Evidence Guide: RIIUND201D - Install, maintain and recover reticulation systems

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUND201D - Install, maintain and recover reticulation systems

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installation of reticulation system

  1. Access, interpret and apply documentation and procedures for installing, maintaining and recovering reticulation systems and ensure the work activity is compliant
  2. Obtain, interpret and clarify work requirements before proceeding
  3. Access and apply safety information and procedures throughout the work
  4. Inspect and assess site conditions to determine if scaling is required and take action
  5. Select and prepare required materials
  6. Communicate and coordinate work activities with other personnel prior and during operation
  7. Identify, address and report potential hazards, risks and environmental issues
  8. Adhere to emergency procedures
  9. Use approved dust suppression and extraction methods
  10. Ensure area is well ventilated before entry into work area
Access, interpret and apply documentation and procedures for installing, maintaining and recovering reticulation systems and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and clarify work requirements before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access and apply safety information and procedures throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine if scaling is required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and prepare required materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate and coordinate work activities with other personnel prior and during operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhere to emergency procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure area is well ventilated before entry into work area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and recover service pipes

  1. Install service pipe support systems
  2. Carry out isolation, tagging and re-energising procedures
  3. Install and stabilise service pipes
  4. Inspect and test installation to ensure functionality, safety and compliance
  5. Connect/recover supply to service pipes
Install service pipe support systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out isolation, tagging and re-energising procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and stabilise service pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test installation to ensure functionality, safety and compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect/recover supply to service pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out ongoing maintenance

  1. Inspect and assess site conditions to determine if cable support systems are required and take action
  2. Report verbally or in writing on maintenance requirements
  3. Clean and store equipment
Inspect and assess site conditions to determine if cable support systems are required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report verbally or in writing on maintenance requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for installation of reticulation system

  1. Access, interpret and apply documentation and procedures for installing, maintaining and recovering reticulation systems and ensure the work activity is compliant
  2. Obtain, interpret and clarify work requirements before proceeding
  3. Access and apply safety information and procedures throughout the work
  4. Inspect and assess site conditions to determine if scaling is required and take action
  5. Select and prepare required materials
  6. Communicate and coordinate work activities with other personnel prior and during operation
  7. Identify, address and report potential hazards, risks and environmental issues
  8. Adhere to emergency procedures
  9. Use approved dust suppression and extraction methods
  10. Ensure area is well ventilated before entry into work area
Access, interpret and apply documentation and procedures for installing, maintaining and recovering reticulation systems and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret and clarify work requirements before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Access and apply safety information and procedures throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine if scaling is required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and prepare required materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communicate and coordinate work activities with other personnel prior and during operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential hazards, risks and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhere to emergency procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure area is well ventilated before entry into work area

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and recover service pipes

  1. Install service pipe support systems
  2. Carry out isolation, tagging and re-energising procedures
  3. Install and stabilise service pipes
  4. Inspect and test installation to ensure functionality, safety and compliance
  5. Connect/recover supply to service pipes
Install service pipe support systems

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out isolation, tagging and re-energising procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and stabilise service pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and test installation to ensure functionality, safety and compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect/recover supply to service pipes

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out ongoing maintenance

  1. Inspect and assess site conditions to determine if cable support systems are required and take action
  2. Report verbally or in writing on maintenance requirements
  3. Clean and store equipment
Inspect and assess site conditions to determine if cable support systems are required and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report verbally or in writing on maintenance requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean and store equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for installation of reticulation system

1.1 Access, interpret and apply documentation and procedures for installing, maintaining and recovering reticulation systems and ensure the work activity is compliant

1.2 Obtain, interpret and clarify work requirements before proceeding

1.3 Access and apply safety information and procedures throughout the work

1.4 Inspect and assess site conditions to determine if scaling is required and take action

1.5 Select and prepare required materials

1.6 Communicate and coordinate work activities with other personnel prior and during operation

1.7 Identify, address and report potential hazards, risks and environmental issues

1.8 Adhere to emergency procedures

1.9 Use approved dust suppression and extraction methods

1.10 Ensure area is well ventilated before entry into work area

2. Install and recover service pipes

2.1 Install service pipe support systems

2.2 Carry out isolation, tagging and re-energising procedures

2.3 Install and stabilise service pipes

2.4 Inspect and test installation to ensure functionality, safety and compliance

2.5 Connect/recover supply to service pipes

3. Carry out ongoing maintenance

3.1 Inspect and assess site conditions to determine if cable support systems are required and take action

3.2 Report verbally or in writing on maintenance requirements

3.3 Clean and store equipment

Required Skills and Knowledge

1. Plan and prepare for installation of reticulation system

1.1 Access, interpret and apply documentation and procedures for installing, maintaining and recovering reticulation systems and ensure the work activity is compliant

1.2 Obtain, interpret and clarify work requirements before proceeding

1.3 Access and apply safety information and procedures throughout the work

1.4 Inspect and assess site conditions to determine if scaling is required and take action

1.5 Select and prepare required materials

1.6 Communicate and coordinate work activities with other personnel prior and during operation

1.7 Identify, address and report potential hazards, risks and environmental issues

1.8 Adhere to emergency procedures

1.9 Use approved dust suppression and extraction methods

1.10 Ensure area is well ventilated before entry into work area

2. Install and recover service pipes

2.1 Install service pipe support systems

2.2 Carry out isolation, tagging and re-energising procedures

2.3 Install and stabilise service pipes

2.4 Inspect and test installation to ensure functionality, safety and compliance

2.5 Connect/recover supply to service pipes

3. Carry out ongoing maintenance

3.1 Inspect and assess site conditions to determine if cable support systems are required and take action

3.2 Report verbally or in writing on maintenance requirements

3.3 Clean and store equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of installation, maintenance and recovery of reticulation systems including:

inspecting and assessing site conditions

identifying, addressing and reporting risks, hazards and environmental issues

demonstrates completion of the installation, maintenance and recovery of reticulation systems that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

selecting and preparing materials for the task

using approved dust suppression and extraction methods

determining if cable support systems are required

completing installation and recovery of service pipes operations

maintaining, cleaning and storing equipment

The candidate must demonstrate knowledge in installing, maintaining and recovering reticulation systems through:

work health and safety

installing, maintaining and recovering equipment and materials

identifying defects and damage

air/water systems

mine operating

environmental safety

site and underground operations

start-up and shutdown activities