NTISthis.com

Evidence Guide: RIIUND301D - Operate manual winder

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUND301D - Operate manual winder

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for manual winder operations

  1. Access, interpret and apply documentation and procedures for operating manual winders and ensure the work activity is compliant
  2. Receive, interpret and clarify shift changeover details and take over control of winder
  3. Select and wear personal protective equipment
  4. Perform equipment and work area pre-operational checks to ensure equipment is ready for operation
  5. Check records for outstanding maintenance/inspections, record defects and take action
  6. Identify, address and report defects and potential hazards and risks
  7. Carry out start-up procedures including checking that area is clear for operations
  8. Identify, address and report environmental issues
  9. Adhere to emergency procedures
  10. Apply dust suppression and extraction methods
  11. Check and confirm that control cabin is environmentally and ergonomically sound
Access, interpret and apply documentation and procedures for operating manual winders and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive, interpret and clarify shift changeover details and take over control of winder

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform equipment and work area pre-operational checks to ensure equipment is ready for operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check records for outstanding maintenance/inspections, record defects and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report defects and potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out start-up procedures including checking that area is clear for operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhere to emergency procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and confirm that control cabin is environmentally and ergonomically sound

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Haul personnel

  1. Communicate with relevant personnel
  2. Confirm cage is ready for operations
  3. Initiate the system, follow start-up procedures and operate personnel cage, complying with directions from person in charge of cage
  4. Monitor and manage cage performance using appropriate indicators
  5. Adjust speed and movement as required
  6. Carry out shutdown procedures
Communicate with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm cage is ready for operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate the system, follow start-up procedures and operate personnel cage, complying with directions from person in charge of cage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage cage performance using appropriate indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust speed and movement as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Haul equipment/ materials

  1. Communicate with relevant personnel
  2. Confirm cage/skip is ready for operation
  3. Initiate the system, follow start-up procedures and transport equipment using manual winder
  4. Adjust speed and movement as required
  5. Monitor and manage cage and/or skip performance using appropriate indicators
  6. Carry out shutdown procedures
Communicate with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm cage/skip is ready for operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate the system, follow start-up procedures and transport equipment using manual winder

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust speed and movement as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage cage and/or skip performance using appropriate indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out winder inspections

  1. Isolate and prove isolation of equipment
  2. Inspect winder and auxiliary equipment and report faults/defects
  3. Prepare winder for routine servicing
Isolate and prove isolation of equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect winder and auxiliary equipment and report faults/defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare winder for routine servicing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct end-of shift activities

  1. Complete all required written documentation
  2. Pass on end-of-shift information verbally or in writing and hand over control to oncoming shift
  3. Ensure control room is clean and tidy
Complete all required written documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end-of-shift information verbally or in writing and hand over control to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure control room is clean and tidy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for manual winder operations

  1. Access, interpret and apply documentation and procedures for operating manual winders and ensure the work activity is compliant
  2. Receive, interpret and clarify shift changeover details and take over control of winder
  3. Select and wear personal protective equipment
  4. Perform equipment and work area pre-operational checks to ensure equipment is ready for operation
  5. Check records for outstanding maintenance/inspections, record defects and take action
  6. Identify, address and report defects and potential hazards and risks
  7. Carry out start-up procedures including checking that area is clear for operations
  8. Identify, address and report environmental issues
  9. Adhere to emergency procedures
  10. Apply dust suppression and extraction methods
  11. Check and confirm that control cabin is environmentally and ergonomically sound
Access, interpret and apply documentation and procedures for operating manual winders and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Receive, interpret and clarify shift changeover details and take over control of winder

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform equipment and work area pre-operational checks to ensure equipment is ready for operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check records for outstanding maintenance/inspections, record defects and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report defects and potential hazards and risks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out start-up procedures including checking that area is clear for operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhere to emergency procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply dust suppression and extraction methods

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and confirm that control cabin is environmentally and ergonomically sound

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Haul personnel

  1. Communicate with relevant personnel
  2. Confirm cage is ready for operations
  3. Initiate the system, follow start-up procedures and operate personnel cage, complying with directions from person in charge of cage
  4. Monitor and manage cage performance using appropriate indicators
  5. Adjust speed and movement as required
  6. Carry out shutdown procedures
Communicate with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm cage is ready for operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate the system, follow start-up procedures and operate personnel cage, complying with directions from person in charge of cage

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage cage performance using appropriate indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust speed and movement as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Haul equipment/ materials

  1. Communicate with relevant personnel
  2. Confirm cage/skip is ready for operation
  3. Initiate the system, follow start-up procedures and transport equipment using manual winder
  4. Adjust speed and movement as required
  5. Monitor and manage cage and/or skip performance using appropriate indicators
  6. Carry out shutdown procedures
Communicate with relevant personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm cage/skip is ready for operation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Initiate the system, follow start-up procedures and transport equipment using manual winder

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust speed and movement as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and manage cage and/or skip performance using appropriate indicators

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out winder inspections

  1. Isolate and prove isolation of equipment
  2. Inspect winder and auxiliary equipment and report faults/defects
  3. Prepare winder for routine servicing
Isolate and prove isolation of equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect winder and auxiliary equipment and report faults/defects

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare winder for routine servicing

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct end-of shift activities

  1. Complete all required written documentation
  2. Pass on end-of-shift information verbally or in writing and hand over control to oncoming shift
  3. Ensure control room is clean and tidy
Complete all required written documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end-of-shift information verbally or in writing and hand over control to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure control room is clean and tidy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for manual winder operations

1.1 Access, interpret and apply documentation and procedures for operating manual winders and ensure the work activity is compliant

1.2 Receive, interpret and clarify shift changeover details and take over control of winder

1.3 Select and wear personal protective equipment

1.4 Perform equipment and work area pre-operational checks to ensure equipment is ready for operation

1.5 Check records for outstanding maintenance/inspections, record defects and take action

1.6 Identify, address and report defects and potential hazards and risks

1.7 Carry out start-up procedures including checking that area is clear for operations

1.8 Identify, address and report environmental issues

1.9 Adhere to emergency procedures

1.10 Apply dust suppression and extraction methods

1.11 Check and confirm that control cabin is environmentally and ergonomically sound

2. Haul personnel

2.1 Communicate with relevant personnel

2.2 Confirm cage is ready for operations

2.3 Initiate the system, follow start-up procedures and operate personnel cage, complying with directions from person in charge of cage

2.4 Monitor and manage cage performance using appropriate indicators

2.5 Adjust speed and movement as required

2.6 Carry out shutdown procedures

3. Haul equipment/ materials

3.1 Communicate with relevant personnel

3.2 Confirm cage/skip is ready for operation

3.3 Initiate the system, follow start-up procedures and transport equipment using manual winder

3.4 Adjust speed and movement as required

3.5 Monitor and manage cage and/or skip performance using appropriate indicators

3.6 Carry out shutdown procedures

4. Carry out winder inspections

4.1 Isolate and prove isolation of equipment

4.2 Inspect winder and auxiliary equipment and report faults/defects

4.3 Prepare winder for routine servicing

5. Conduct end-of shift activities

5.1 Complete all required written documentation

5.2 Pass on end-of-shift information verbally or in writing and hand over control to oncoming shift

5.3 Ensure control room is clean and tidy

Required Skills and Knowledge

1. Plan and prepare for manual winder operations

1.1 Access, interpret and apply documentation and procedures for operating manual winders and ensure the work activity is compliant

1.2 Receive, interpret and clarify shift changeover details and take over control of winder

1.3 Select and wear personal protective equipment

1.4 Perform equipment and work area pre-operational checks to ensure equipment is ready for operation

1.5 Check records for outstanding maintenance/inspections, record defects and take action

1.6 Identify, address and report defects and potential hazards and risks

1.7 Carry out start-up procedures including checking that area is clear for operations

1.8 Identify, address and report environmental issues

1.9 Adhere to emergency procedures

1.10 Apply dust suppression and extraction methods

1.11 Check and confirm that control cabin is environmentally and ergonomically sound

2. Haul personnel

2.1 Communicate with relevant personnel

2.2 Confirm cage is ready for operations

2.3 Initiate the system, follow start-up procedures and operate personnel cage, complying with directions from person in charge of cage

2.4 Monitor and manage cage performance using appropriate indicators

2.5 Adjust speed and movement as required

2.6 Carry out shutdown procedures

3. Haul equipment/ materials

3.1 Communicate with relevant personnel

3.2 Confirm cage/skip is ready for operation

3.3 Initiate the system, follow start-up procedures and transport equipment using manual winder

3.4 Adjust speed and movement as required

3.5 Monitor and manage cage and/or skip performance using appropriate indicators

3.6 Carry out shutdown procedures

4. Carry out winder inspections

4.1 Isolate and prove isolation of equipment

4.2 Inspect winder and auxiliary equipment and report faults/defects

4.3 Prepare winder for routine servicing

5. Conduct end-of shift activities

5.1 Complete all required written documentation

5.2 Pass on end-of-shift information verbally or in writing and hand over control to oncoming shift

5.3 Ensure control room is clean and tidy

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

demonstrates completion of the operation of manual winders that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing start-up and shutdown procedures

applying dust suppression and extraction methods

energising the system

completing personnel haulage operations using manual winder

completing equipment haulage operations using manual winder

monitor and manage cage and skip performance

isolate and inspect winder

The candidate must demonstrate knowledge in operating a manual winder through:

use hand tools

the key areas of mining acts and regulations

winder types, systems and operations

shaft configuration and construction

shaft services and installations (pipes, cables, ladders etc)

identification of defects relevant to skip operations through inspection or observation

primary and secondary ventilation/mine ventilation system

shaft installations

in-shaft communications equipment