Evidence Guide: RIIUND309D - Conduct mechanical underground ground support drilling and installation

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUND309D - Conduct mechanical underground ground support drilling and installation

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to conduct drilling and installation

  1. Access, interpret and apply drilling and installation documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work requirements and shift changeover details before proceeding
  3. Select and wear appropriate personal protective equipment for work activity
  4. Inspect and assess site conditions to determine scaling requirements, misfires and starting point and take action
  5. Conduct equipment pre-start and visual checks
  6. Identify, address and report potential risks, hazards and environmental issues
  7. Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
  8. Assess site conditions and review historical information to clarify drilling requirements
  9. Use approved dust suppression and extraction methods if required
Access, interpret and apply drilling and installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work requirements and shift changeover details before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear appropriate personal protective equipment for work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine scaling requirements, misfires and starting point and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start and visual checks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential risks, hazards and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess site conditions and review historical information to clarify drilling requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up and prepare for installation

  1. Scale loose material and make site safe, where applicable
  2. Connect auxiliary services where required
  3. Align equipment to access drill pattern
  4. Drill holes according to ground support design and work plan
  5. Erect boundaries to prevent unauthorised access
  6. Complete all required documentation clearly, concisely and on time
Scale loose material and make site safe, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect auxiliary services where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Align equipment to access drill pattern

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drill holes according to ground support design and work plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect boundaries to prevent unauthorised access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all required documentation clearly, concisely and on time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install ground support

  1. Position and stabilise drill equipment and ensure safety of operating personnel
  2. Install reinforcements
  3. Conduct equipment shutdown procedures
  4. Pass on end of shift information to oncoming shift
Position and stabilise drill equipment and ensure safety of operating personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install reinforcements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end of shift information to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to conduct drilling and installation

  1. Access, interpret and apply drilling and installation documentation and ensure the work activity is compliant
  2. Obtain, interpret, clarify and confirm work requirements and shift changeover details before proceeding
  3. Select and wear appropriate personal protective equipment for work activity
  4. Inspect and assess site conditions to determine scaling requirements, misfires and starting point and take action
  5. Conduct equipment pre-start and visual checks
  6. Identify, address and report potential risks, hazards and environmental issues
  7. Obtain and interpret emergency procedures and be prepared for fire/accident/emergency
  8. Assess site conditions and review historical information to clarify drilling requirements
  9. Use approved dust suppression and extraction methods if required
Access, interpret and apply drilling and installation documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, interpret, clarify and confirm work requirements and shift changeover details before proceeding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear appropriate personal protective equipment for work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and assess site conditions to determine scaling requirements, misfires and starting point and take action

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment pre-start and visual checks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, address and report potential risks, hazards and environmental issues

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess site conditions and review historical information to clarify drilling requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use approved dust suppression and extraction methods if required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up and prepare for installation

  1. Scale loose material and make site safe, where applicable
  2. Connect auxiliary services where required
  3. Align equipment to access drill pattern
  4. Drill holes according to ground support design and work plan
  5. Erect boundaries to prevent unauthorised access
  6. Complete all required documentation clearly, concisely and on time
Scale loose material and make site safe, where applicable

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Connect auxiliary services where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Align equipment to access drill pattern

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drill holes according to ground support design and work plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect boundaries to prevent unauthorised access

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete all required documentation clearly, concisely and on time

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install ground support

  1. Position and stabilise drill equipment and ensure safety of operating personnel
  2. Install reinforcements
  3. Conduct equipment shutdown procedures
  4. Pass on end of shift information to oncoming shift
Position and stabilise drill equipment and ensure safety of operating personnel

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install reinforcements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct equipment shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pass on end of shift information to oncoming shift

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to conduct drilling and installation

1.1 Access, interpret and apply drilling and installation documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work requirements and shift changeover details before proceeding

1.3 Select and wear appropriate personal protective equipment for work activity

1.4 Inspect and assess site conditions to determine scaling requirements, misfires and starting point and take action

1.5 Conduct equipment pre-start and visual checks

1.6 Identify, address and report potential risks, hazards and environmental issues

1.7 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

1.8 Assess site conditions and review historical information to clarify drilling requirements

1.9 Use approved dust suppression and extraction methods if required

2. Set up and prepare for installation

2.1 Scale loose material and make site safe, where applicable

2.2 Connect auxiliary services where required

2.3 Align equipment to access drill pattern

2.4 Drill holes according to ground support design and work plan

2.5 Erect boundaries to prevent unauthorised access

2.6 Complete all required documentation clearly, concisely and on time

3. Install ground support

3.1 Position and stabilise drill equipment and ensure safety of operating personnel

3.2 Install reinforcements

3.3 Conduct equipment shutdown procedures

3.4 Pass on end of shift information to oncoming shift

Required Skills and Knowledge

1. Plan and prepare to conduct drilling and installation

1.1 Access, interpret and apply drilling and installation documentation and ensure the work activity is compliant

1.2 Obtain, interpret, clarify and confirm work requirements and shift changeover details before proceeding

1.3 Select and wear appropriate personal protective equipment for work activity

1.4 Inspect and assess site conditions to determine scaling requirements, misfires and starting point and take action

1.5 Conduct equipment pre-start and visual checks

1.6 Identify, address and report potential risks, hazards and environmental issues

1.7 Obtain and interpret emergency procedures and be prepared for fire/accident/emergency

1.8 Assess site conditions and review historical information to clarify drilling requirements

1.9 Use approved dust suppression and extraction methods if required

2. Set up and prepare for installation

2.1 Scale loose material and make site safe, where applicable

2.2 Connect auxiliary services where required

2.3 Align equipment to access drill pattern

2.4 Drill holes according to ground support design and work plan

2.5 Erect boundaries to prevent unauthorised access

2.6 Complete all required documentation clearly, concisely and on time

3. Install ground support

3.1 Position and stabilise drill equipment and ensure safety of operating personnel

3.2 Install reinforcements

3.3 Conduct equipment shutdown procedures

3.4 Pass on end of shift information to oncoming shift

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of mechanical underground ground support drilling and installation including:

setting up, preparing and installing ground support

drilling

operating hand and power tools

identifying hazards

monitoring operations

reporting defects

demonstrates completion of mechanical underground ground support drilling and installation that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

completing equipment pre-start, visual checks and shutdown activities

scaling loose material

drilling holes

erecting boundaries

positioning and stabilising drill equipment

installing reinforcements

The candidate must demonstrate knowledge in conducting mechanical underground ground support drilling and installation through:

relevant hand and power tool use

recording and reporting

dewatering

drilling

equipment safety

hazardous goods

inspections

isolation

site operations

ground support characteristics and applications

stope areas and characteristics