NTISthis.com

Evidence Guide: RIIUND401E - Apply and monitor the ventilation management plan

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIUND401E - Apply and monitor the ventilation management plan

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to apply and monitor ventilation management plan

  1. Access, interpret and apply ventilation management documentation and confirm work activity is compliant
  2. Identify, clarify and communicate roles and responsibilities to involved personnel according to ventilation management plan
  3. Identify and obtain required resources according to ventilation management plan
Access, interpret and apply ventilation management documentation and confirm work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, clarify and communicate roles and responsibilities to involved personnel according to ventilation management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and obtain required resources according to ventilation management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply ventilation management plan

  1. Identify and interpret impact of changes to ventilation system on the mine atmosphere
  2. Apply installation and operation procedures for monitoring systems and equipment according to ventilation management plan
  3. Install, monitor and maintain ventilation control device in ventilation system according to ventilation management plan
  4. Apply procedures for monitoring, recording and reporting on mine ventilation according to ventilation management plan
  5. Adjust mine control devices according to ventilation management plan and site requirements
  6. Collect and report ventilation data according to ventilation management plan and site requirements
  7. Record and report monitoring system data according to ventilation management plan and site requirements
  8. Respond to alarms raised according to ventilation management plan and site requirements
  9. Apply ventilation emergency and evacuation procedures according to ventilation management plan and site requirements
  10. Contribute to systems audit and review requirements within scope of own role and according to site requirements
Identify and interpret impact of changes to ventilation system on the mine atmosphere

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply installation and operation procedures for monitoring systems and equipment according to ventilation management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install, monitor and maintain ventilation control device in ventilation system according to ventilation management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply procedures for monitoring, recording and reporting on mine ventilation according to ventilation management plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust mine control devices according to ventilation management plan and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Collect and report ventilation data according to ventilation management plan and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record and report monitoring system data according to ventilation management plan and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Respond to alarms raised according to ventilation management plan and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply ventilation emergency and evacuation procedures according to ventilation management plan and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Contribute to systems audit and review requirements within scope of own role and according to site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Apply ventilation system maintenance procedures

  1. Schedule and carry out inspections, repair and maintenance activities according to manufacturer specifications and site requirements
  2. Record, report and review maintenance requirements and activities according to ventilation management plan and site requirements
Schedule and carry out inspections, repair and maintenance activities according to manufacturer specifications and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Record, report and review maintenance requirements and activities according to ventilation management plan and site requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Required Skills and Knowledge

The candidate must demonstrate the ability to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including evidence of the ability to:

apply and monitor ventilation management plans on at least two occasions, including:

operating hand-held monitoring equipment

installing, monitoring and maintaining ventilation control device

monitoring, recording and reporting on mine ventilation, including defects to ventilation control devices

adjusting mine control devices

scheduling and carrying out inspections, repair and maintenance activities

reviewing and reporting on maintenance requirements and activities.

During the above, the candidate must:

locate and apply relevant legislation, documentation, policies and procedures and confirm work activity is compliant

implement requirements, procedures and techniques for applying and monitoring ventilation management plans, including:

performing routine operational mathematical calculations, including quantity, pressure, prediction calculations

interpreting and applying a limited range of mathematical and scientific theorems/laws relating to ventilation

collating and interpreting ventilation data

interpreting and applying ventilation device construction/installation specifications

conducting enquiries/investigations and preparing reports

accessing, interpreting and applying data from monitoring systems and equipment

applying risk management processes and techniques.

The candidate must be able to demonstrate knowledge to complete the tasks outlined in the elements, performance criteria and foundation skills of this unit, including knowledge of:

key legislation required to apply and monitor ventilation management plans

key procedures and documentation required to apply and monitor ventilation management plans, including ventilation management plan

methods of mine ventilation and their applications and limitations, including:

exhaust/force

antitropal

homotropal

flank returns

ascensional/descensional

bleeder

Z/U/Y systems

types, characteristics, uses and limitations of ventilation control devices, including:

main and auxiliary fans

doors

regulators

seals

stoppings

air crossings

pressure balancing

methods of mine ventilation and their applications and limitations

methods of panel ventilation and their applications and limitations

impacts of mining techniques and mine and panel design on ventilation

mine roadways and shafts and their impact on mine ventilation

impact of geological characteristics and seam gradients on mine ventilation design

impacts on the ventilation system of gas drainage, spontaneous combustion, outburst and windblast

types of mine gases, including:

characteristics under varying circumstances

sources

physiological effects

methods of detection

types of airborne contaminants, including:

sources

physical and physiological effects

control and mitigation methods

types of mine fires, including:

sources of ignition

possible effects on the ventilation circuit

prevention, control and mitigation methods

types of mine explosions, including:

ignition sources

possible effects on the ventilation circuit

prevention, control and mitigation methods

pressure change principles, including:

causes

impacts on the ventilation system

responses, including the causes and effects of natural ventilation and recirculation

types, frequency and method for conducting ventilation surveys, including:

pressure

quantity

temperature

gas

heat and humidity principles, including sources and factors which may impact ventilation and personnel

fixed ventilation monitoring systems types, uses and limitations

types, characteristics, uses and limitations of portable monitoring equipment

types, uses and limitations of airborne contaminant surveys for irrespirable quantity

techniques for identifying individual training needs

principles, processes and techniques for emergency response, evacuation and disaster planning

techniques for communicating and coordinating work activities with others.