Evidence Guide: RIIWMG202D - Conduct dewatering operations in underground mining operations

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIWMG202D - Conduct dewatering operations in underground mining operations

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to conduct dewatering operations in underground mining operations

  1. Access, interpret and apply dewatering operations documentation and ensure the work activity is compliant
  2. Obtain read, interpret, clarify and confirm work requirements
  3. Select, and check for faults, tools/equipment for work activities
  4. Develop dewatering plan
  5. Identify and obtain signage requirements
  6. Prepare sumps and pads
  7. Coordinate and transport required equipment and tools to and from the site
  8. Identify and address potential risks, hazards and environmental issues, and implement control measures
  9. Select and wear personal protective equipment appropriate for work activities
  10. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply dewatering operations documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, tools/equipment for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop dewatering plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and obtain signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare sumps and pads

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate and transport required equipment and tools to and from the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install, operate and recover dewatering equipment

  1. Communicate and coordinate with others at the site throughout the work activity
  2. Install and dismantle dewatering system in accordance with the plan
  3. Carry out pre-start, start-up and shutdown procedures
  4. Monitor and adjust dewatering system performance where required
  5. Recognise and follow procedures in hazardous and emergency situations
  6. Ensure discharged water is dispersed as required
  7. Complete work activity in accordance with the work plan
  8. Recover dewatering system
  9. Clear work area and dispose of materials
Communicate and coordinate with others at the site throughout the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and dismantle dewatering system in accordance with the plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-start, start-up and shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and adjust dewatering system performance where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise and follow procedures in hazardous and emergency situations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure discharged water is dispersed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work activity in accordance with the work plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover dewatering system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operator maintenance

  1. Carry out dewatering equipment and systems inspections and fault finding
  2. Carry out operational maintenance, servicing, lubricating and housekeeping tasks
  3. Process written records and reports
Carry out dewatering equipment and systems inspections and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operational maintenance, servicing, lubricating and housekeeping tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written records and reports

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to conduct dewatering operations in underground mining operations

  1. Access, interpret and apply dewatering operations documentation and ensure the work activity is compliant
  2. Obtain read, interpret, clarify and confirm work requirements
  3. Select, and check for faults, tools/equipment for work activities
  4. Develop dewatering plan
  5. Identify and obtain signage requirements
  6. Prepare sumps and pads
  7. Coordinate and transport required equipment and tools to and from the site
  8. Identify and address potential risks, hazards and environmental issues, and implement control measures
  9. Select and wear personal protective equipment appropriate for work activities
  10. Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
Access, interpret and apply dewatering operations documentation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain read, interpret, clarify and confirm work requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select, and check for faults, tools/equipment for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Develop dewatering plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and obtain signage requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare sumps and pads

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate and transport required equipment and tools to and from the site

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and address potential risks, hazards and environmental issues, and implement control measures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and wear personal protective equipment appropriate for work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install, operate and recover dewatering equipment

  1. Communicate and coordinate with others at the site throughout the work activity
  2. Install and dismantle dewatering system in accordance with the plan
  3. Carry out pre-start, start-up and shutdown procedures
  4. Monitor and adjust dewatering system performance where required
  5. Recognise and follow procedures in hazardous and emergency situations
  6. Ensure discharged water is dispersed as required
  7. Complete work activity in accordance with the work plan
  8. Recover dewatering system
  9. Clear work area and dispose of materials
Communicate and coordinate with others at the site throughout the work activity

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install and dismantle dewatering system in accordance with the plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pre-start, start-up and shutdown procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monitor and adjust dewatering system performance where required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise and follow procedures in hazardous and emergency situations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ensure discharged water is dispersed as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work activity in accordance with the work plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recover dewatering system

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clear work area and dispose of materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operator maintenance

  1. Carry out dewatering equipment and systems inspections and fault finding
  2. Carry out operational maintenance, servicing, lubricating and housekeeping tasks
  3. Process written records and reports
Carry out dewatering equipment and systems inspections and fault finding

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out operational maintenance, servicing, lubricating and housekeeping tasks

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Process written records and reports

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare to conduct dewatering operations in underground mining operations

1.1 Access, interpret and apply dewatering operations documentation and ensure the work activity is compliant

1.2 Obtain read, interpret, clarify and confirm work requirements

1.3 Select, and check for faults, tools/equipment for work activities

1.4 Develop dewatering plan

1.5 Identify and obtain signage requirements

1.6 Prepare sumps and pads

1.7 Coordinate and transport required equipment and tools to and from the site

1.8 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.9 Select and wear personal protective equipment appropriate for work activities

1.10 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install, operate and recover dewatering equipment

2.1 Communicate and coordinate with others at the site throughout the work activity

2.2 Install and dismantle dewatering system in accordance with the plan

2.3 Carry out pre-start, start-up and shutdown procedures

2.4 Monitor and adjust dewatering system performance where required

2.5 Recognise and follow procedures in hazardous and emergency situations

2.6 Ensure discharged water is dispersed as required

2.7 Complete work activity in accordance with the work plan

2.8 Recover dewatering system

2.9 Clear work area and dispose of materials

3. Carry out operator maintenance

3.1 Carry out dewatering equipment and systems inspections and fault finding

3.2 Carry out operational maintenance, servicing, lubricating and housekeeping tasks

3.3 Process written records and reports

Required Skills and Knowledge

1. Plan and prepare to conduct dewatering operations in underground mining operations

1.1 Access, interpret and apply dewatering operations documentation and ensure the work activity is compliant

1.2 Obtain read, interpret, clarify and confirm work requirements

1.3 Select, and check for faults, tools/equipment for work activities

1.4 Develop dewatering plan

1.5 Identify and obtain signage requirements

1.6 Prepare sumps and pads

1.7 Coordinate and transport required equipment and tools to and from the site

1.8 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.9 Select and wear personal protective equipment appropriate for work activities

1.10 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Install, operate and recover dewatering equipment

2.1 Communicate and coordinate with others at the site throughout the work activity

2.2 Install and dismantle dewatering system in accordance with the plan

2.3 Carry out pre-start, start-up and shutdown procedures

2.4 Monitor and adjust dewatering system performance where required

2.5 Recognise and follow procedures in hazardous and emergency situations

2.6 Ensure discharged water is dispersed as required

2.7 Complete work activity in accordance with the work plan

2.8 Recover dewatering system

2.9 Clear work area and dispose of materials

3. Carry out operator maintenance

3.1 Carry out dewatering equipment and systems inspections and fault finding

3.2 Carry out operational maintenance, servicing, lubricating and housekeeping tasks

3.3 Process written records and reports

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient conducting of dewatering operations in underground mining operations including:

selecting dewatering methods

interpreting ground conditions

pumping equipment operating requirements

responding to changing circumstances

complying with environmental requirements

working in confined spaces

applying equipment records maintenance requirements

interpreting and applying work instructions

selecting and using the required tools and equipment

selecting and wearing appropriate personal protective equipment

being prepared for emergency

works effectively with others to undertake and complete dewatering operations in underground mining operations that meets all of the required outcomes including:

using a range of communication techniques to convey information to others

maintaining written and verbal reporting requirements and procedures

demonstrates completion of conducting dewatering operations in underground mining operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

installing and dismantling dewatering equipment

completing pre-start, start-up and shutdown procedures

starting, testing, monitoring and adjusting dewatering equipment

inspecting dewatering equipment and systems

maintaining, servicing and lubricating equipment

dispersing discharged water

clearing work area and disposing of materials

inspecting dewatering equipment and systems

completing the work plan

The candidate must demonstrate knowledge in conducting dewatering operations in underground mining operations through:

identifying and complying with site requirements and constraints

identifying site geological and survey data

identifying and applying dewatering equipment pre-start, start-up, operating and shutdown procedures and techniques

identifying dewatering equipment characteristics, technical capability and limitations

identifying and applying drainage principles and processes