The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare for site water table construction
|
|
Access, interpret and apply site water table construction documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify, obtain and implement traffic signage requirements Completed |
Evidence:
|
Select and inspect required plant, tools and equipment and rectify or report any faults Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear personal protective equipment appropriate for work activities Completed |
Evidence:
|
Install site drainage/ dewatering system
|
|
Identify proposed permanent stormwater outlets from site plans and drawings Completed |
Evidence:
|
Erect barricades around the excavation/ installation area Completed |
Evidence:
|
Construct sumps and wells Completed |
Evidence:
|
Install well points, spears or wick drains Completed |
Evidence:
|
Place gravel and filter material in spears, sumps and wells to level above that of existing water table Completed |
Evidence:
|
Install surface or submersible pumps in designated locations Completed |
Evidence:
|
Connect suction hoses to sumps, wells, spears and pumps Completed |
Evidence:
|
Fit pipes and hoses to well points, spears and pumps Completed |
Evidence:
|
Establish stormwater treatment system
|
|
Set out holding pond and support construction operations Completed |
Evidence:
|
Monitor, assess and rectify water quality and treatment Completed |
Evidence:
|
Release water which meets the approved quality criteria into the main system Completed |
Evidence:
|
Operate and maintain drainage and dewatering system
|
|
Activate pumps to lower water table level Completed |
Evidence:
|
Maintain pumps Completed |
Evidence:
|
Maintain site drainage and dewatering system and maximise water flow to project requirements Completed |
Evidence:
|
Remove and restore area
|
|
Disconnect and remove pumping system Completed |
Evidence:
|
Withdraw and remove well points and spears Completed |
Evidence:
|
Restore area according to environmental management plan Completed |
Evidence:
|
Clean up
|
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|
Plan and prepare for site water table construction
|
|
Access, interpret and apply site water table construction documentation and ensure the work activity is compliant Completed |
Evidence:
|
Obtain, read, interpret, clarify and confirm work requirements Completed |
Evidence:
|
Identify, obtain and implement traffic signage requirements Completed |
Evidence:
|
Select and inspect required plant, tools and equipment and rectify or report any faults Completed |
Evidence:
|
Identify and address potential risks, hazards and environmental issues, and implement control measures Completed |
Evidence:
|
Select and wear personal protective equipment appropriate for work activities Completed |
Evidence:
|
Install site drainage/ dewatering system
|
|
Identify proposed permanent stormwater outlets from site plans and drawings Completed |
Evidence:
|
Erect barricades around the excavation/ installation area Completed |
Evidence:
|
Construct sumps and wells Completed |
Evidence:
|
Install well points, spears or wick drains Completed |
Evidence:
|
Place gravel and filter material in spears, sumps and wells to level above that of existing water table Completed |
Evidence:
|
Install surface or submersible pumps in designated locations Completed |
Evidence:
|
Connect suction hoses to sumps, wells, spears and pumps Completed |
Evidence:
|
Fit pipes and hoses to well points, spears and pumps Completed |
Evidence:
|
Establish stormwater treatment system
|
|
Set out holding pond and support construction operations Completed |
Evidence:
|
Monitor, assess and rectify water quality and treatment Completed |
Evidence:
|
Release water which meets the approved quality criteria into the main system Completed |
Evidence:
|
Operate and maintain drainage and dewatering system
|
|
Activate pumps to lower water table level Completed |
Evidence:
|
Maintain pumps Completed |
Evidence:
|
Maintain site drainage and dewatering system and maximise water flow to project requirements Completed |
Evidence:
|
Remove and restore area
|
|
Disconnect and remove pumping system Completed |
Evidence:
|
Withdraw and remove well points and spears Completed |
Evidence:
|
Restore area according to environmental management plan Completed |
Evidence:
|
Clear work area and dispose of or recycle materials Completed |
Evidence:
|
Clean, check, maintain and store plant, tools and equipment Completed |
Evidence:
|