The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare derrick operations
|
|
Obtain, confirm and apply work instructions Completed |
Evidence:
|
Access, interpret and apply compliance documentation and confirm work activity is compliant Completed |
Evidence:
|
Clarify difficulties in carrying out instructions with the relevant personnel Completed |
Evidence:
|
Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures Completed |
Evidence:
|
Confirm personnel coordination requirements at the site are met prior to commencement of work activities Completed |
Evidence:
|
Confirm availability and status of necessary permits to work Completed |
Evidence:
|
Confirm availability of necessary third party utilities according to operational requirements Completed |
Evidence:
|
Confirm availability of required quantities and type of consumables against operational requirements Completed |
Evidence:
|
Select and use wear personal protective equipment and wear protective clothing required for work activities Completed |
Evidence:
|
Identify errors, omissions and shortages and take required remedial action within functional responsibility Completed |
Evidence:
|
Inform driller of status of derrick operating equipment Completed |
Evidence:
|
Handle tubulars and equipment
|
|
Position tubulars and equipment according to operational requirements Completed |
Evidence:
|
Assist in making and breaking connections where required Completed |
Evidence:
|
Identify faults and defects and take required remedial action within functional responsibility Completed |
Evidence:
|
Handle equipment using safe lifting and handling techniques Completed |
Evidence:
|
Prepare hole for circulation with air/fluid
|
|
Complete pre-raise and pre-circulation checks and establish required circulation Completed |
Evidence:
|
Perform pre-spud safety checks Completed |
Evidence:
|
Check all connections and valves to manifold and well head are in proper position as required Completed |
Evidence:
|
Maintain drilling fluid volume and properties according to work requirements Completed |
Evidence:
|
Inform driller of current operating conditions Completed |
Evidence:
|
Maintain written inventory of circulation system and parts as required Completed |
Evidence:
|
Check and record mud and fluid additives as required Completed |
Evidence:
|
Follow all operator instructions Completed |
Evidence:
|
Participate in head-up and pressure test
|
|
Prepare for necessary equipment changes Completed |
Evidence:
|
Prepare drilling fluid according to work requirements Completed |
Evidence:
|
Assist driller in blow out prevention testing Completed |
Evidence:
|
Clean out well bore/drill plugs
|
|
Consult driller and follow instructions Completed |
Evidence:
|
Maintain housekeeping and safe practices during drilling according to workplace procedures and safety requirements Completed |
Evidence:
|
Assist in completion or abandonment of well Completed |
Evidence:
|
Prepare to commence drilling/circulating operations
|
|
Align equipment on active systems for drilling/circulating Completed |
Evidence:
|
Turn on and check all required machinery Completed |
Evidence:
|
Watch for return sand report changes Completed |
Evidence:
|
Measure and log pit, tank and fluid levels regularly as required Completed |
Evidence:
|
Assist driller on drill floor
|
|
Assist in handling and nippling-up of blow out prevention stack Completed |
Evidence:
|
Carry out role of assistant to driller when on drill floor Completed |
Evidence:
|
Shutdown rig and rig out
|
|
Wash and drain circulation system Completed |
Evidence:
|
Repair equipment according to manufacturer specifications and work requirements Completed |
Evidence:
|
Store equipment according to safety requirements and workplace procedures Completed |
Evidence:
|