NTISthis.com

Evidence Guide: RIIWSV403D - Participate in well servicing nippling-up and pressure test

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

RIIWSV403D - Participate in well servicing nippling-up and pressure test

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for nippling-up and pressure testing

  1. Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant
  2. Obtain, read, confirm and apply work instructions
  3. Identify, manage and report all potential hazards
  4. Resolve coordination requirements with others at the site prior to commencing, and during, work activities
  5. Check and adjust surface equipment pressure ratings and compatibility
Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Obtain, read, confirm and apply work instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify, manage and report all potential hazards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resolve coordination requirements with others at the site prior to commencing, and during, work activities

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check and adjust surface equipment pressure ratings and compatibility

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform nippling up

  1. Correctly nipple up Blowout Preventer (BOP)
Correctly nipple up Blowout Preventer (BOP)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Perform pressure test

  1. Perform accurate Blowout Preventer (BOP) test
  2. Carry out rig-up to drill-out operations in accordance with parameters, specifications and operations
  3. Carry out pressure tests prior to operations and record in writing test results
Perform accurate Blowout Preventer (BOP) test

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out rig-up to drill-out operations in accordance with parameters, specifications and operations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out pressure tests prior to operations and record in writing test results

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

1. Plan and prepare for nippling-up and pressure testing

1.1 Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant

1.2 Obtain, read, confirm and apply work instructions

1.3 Identify, manage and report all potential hazards

1.4 Resolve coordination requirements with others at the site prior to commencing, and during, work activities

1.5 Check and adjust surface equipment pressure ratings and compatibility

2. Perform nippling up

2.1 Correctly nipple up Blowout Preventer (BOP)

3. Perform pressure test

3.1 Perform accurate Blowout Preventer (BOP) test

3.2 Carry out rig-up to drill-out operations in accordance with parameters, specifications and operations

3.3 Carry out pressure tests prior to operations and record in writing test results

Required Skills and Knowledge

1. Plan and prepare for nippling-up and pressure testing

1.1 Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant

1.2 Obtain, read, confirm and apply work instructions

1.3 Identify, manage and report all potential hazards

1.4 Resolve coordination requirements with others at the site prior to commencing, and during, work activities

1.5 Check and adjust surface equipment pressure ratings and compatibility

2. Perform nippling up

2.1 Correctly nipple up Blowout Preventer (BOP)

3. Perform pressure test

3.1 Perform accurate Blowout Preventer (BOP) test

3.2 Carry out rig-up to drill-out operations in accordance with parameters, specifications and operations

3.3 Carry out pressure tests prior to operations and record in writing test results

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

works effectively with others to undertake and complete well servicing nippling up and pressure testing that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements throughout work activities

demonstrates completion of participating in well servicing nippling-up and pressure test that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

inspecting and adjusting equipment pressure ratings

carrying out nippling up of Blowout Prevention (BOP)

performing Blowout Prevention (BOP) and pressure testing

carrying out rig-up to drill out operations

processing written records and reports

The candidate must demonstrate knowledge of the following when participating in well servicing nippling-up and pressure testing:

accessing, interpreting and applying the organisation and site requirements and procedures

carrying out high pressure lines requiring pressure testing

knowledge and use of test equipment

testing equipment and procedures

rig maintenance procedures

identifying and managing surface production equipment

well head identification – pressures

well head identification – type (seal pockets, down hole gauges, stuffing boxes, DSA flanges)

re-pressure testing

manage and monitor nippling up and pressure testing within a team environment

identifying well head pressure ratings

pressure recording equipment operations

PSV ratings and operations

converting metric and imperial measurement

performing gas testing

performing a range of numerical calculations including:

volume

quantity

mass

weight

length

pressure

using calculator if required

using estimating skills (e.g. mental arithmetic, visualisation of size and quantity)

basic geometry (e.g. interpreting depth, direction, angles)