NTISthis.com

Evidence Guide: SFLDEC009 - Construct complex floristry products

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

SFLDEC009 - Construct complex floristry products

What evidence can you provide to prove your understanding of each of the following citeria?

Interpret the design and job specifications

  1. Interpret job specifications and itemised job costing.
  2. Discuss, with relevant personnel, design and construction requirements including cost and production deadlines.
  3. Read, view or discuss job specifications regularly during construction phase to comply with product requirements.
Interpret job specifications and itemised job costing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discuss, with relevant personnel, design and construction requirements including cost and production deadlines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read, view or discuss job specifications regularly during construction phase to comply with product requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan the production stages.

  1. Prepare a production plan for construction and display.
  2. Source and roster staff for construction of complex floristry products.
  3. Source, purchase or hire fabrication and structural support requirements according to job specifications and costing.
Prepare a production plan for construction and display.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source and roster staff for construction of complex floristry products.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source, purchase or hire fabrication and structural support requirements according to job specifications and costing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select flower and plant materials and ancillary items.

  1. Recognise and select ancillary items, flower, plant and presentation materials according to job specifications and costing.
  2. Sort items in preparation for construction.
  3. Identify potential problems for meeting design requirements and adjust as required.
Recognise and select ancillary items, flower, plant and presentation materials according to job specifications and costing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sort items in preparation for construction.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential problems for meeting design requirements and adjust as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to construct the floristry product.

  1. Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.
  2. Clean product construction area to avoid spoilage of flower and plant materials.
  3. Check flower and plant materials have been correctly prepared and conditioned.
  4. Recognise, rectify and report any spoilt materials.
  5. Select tools and equipment and other construction components.
  6. Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.
Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean product construction area to avoid spoilage of flower and plant materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check flower and plant materials have been correctly prepared and conditioned.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise, rectify and report any spoilt materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment and other construction components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct complex floral designs.

  1. Select appropriate floristry techniques according to job specifications.
  2. Coordinate staff involved in team construction of complex floristry products.
  3. Produce complex floristry products considering and applying elements and principles of design.
  4. Determine and use appropriate support methods.
  5. Secure all components of complex floristry products according to job specifications.
  6. Evaluate and modify the floral design according to need, considering and applying elements and principles of design.
Select appropriate floristry techniques according to job specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate staff involved in team construction of complex floristry products.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce complex floristry products considering and applying elements and principles of design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and use appropriate support methods.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure all components of complex floristry products according to job specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate and modify the floral design according to need, considering and applying elements and principles of design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise and evaluate the complex floristry product.

  1. Attach and secure ancillary and presentation items to floral product.
  2. Select and use wrapping and packaging materials according to job specifications and make required adjustments to enhance or protect presentation.
  3. Dispose of hazardous and other waste safely to minimise negative environmental impacts.
  4. Review and evaluate the complex floristry product for compliance with job specifications, for technical and aesthetic quality and make required adjustments.
  5. Consider and apply elements and principles of design when wrapping, packing and altering the complex floristry product.
  6. Prepare basic reports to justify variations to original design and to inform future improvements.
Attach and secure ancillary and presentation items to floral product.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use wrapping and packaging materials according to job specifications and make required adjustments to enhance or protect presentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of hazardous and other waste safely to minimise negative environmental impacts.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review and evaluate the complex floristry product for compliance with job specifications, for technical and aesthetic quality and make required adjustments.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consider and apply elements and principles of design when wrapping, packing and altering the complex floristry product.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare basic reports to justify variations to original design and to inform future improvements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Interpret the design and job specifications

  1. Interpret job specifications and itemised job costing.
  2. Discuss, with relevant personnel, design and construction requirements including cost and production deadlines.
  3. Read, view or discuss job specifications regularly during construction phase to comply with product requirements.
Interpret job specifications and itemised job costing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discuss, with relevant personnel, design and construction requirements including cost and production deadlines.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Read, view or discuss job specifications regularly during construction phase to comply with product requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan the production stages.

  1. Prepare a production plan for construction and display.
  2. Source and roster staff for construction of complex floristry products.
  3. Source, purchase or hire fabrication and structural support requirements according to job specifications and costing.
Prepare a production plan for construction and display.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source and roster staff for construction of complex floristry products.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Source, purchase or hire fabrication and structural support requirements according to job specifications and costing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select flower and plant materials and ancillary items.

  1. Recognise and select ancillary items, flower, plant and presentation materials according to job specifications and costing.
  2. Sort items in preparation for construction.
  3. Identify potential problems for meeting design requirements and adjust as required.
Recognise and select ancillary items, flower, plant and presentation materials according to job specifications and costing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sort items in preparation for construction.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify potential problems for meeting design requirements and adjust as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to construct the floristry product.

  1. Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.
  2. Clean product construction area to avoid spoilage of flower and plant materials.
  3. Check flower and plant materials have been correctly prepared and conditioned.
  4. Recognise, rectify and report any spoilt materials.
  5. Select tools and equipment and other construction components.
  6. Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.
Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean product construction area to avoid spoilage of flower and plant materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Check flower and plant materials have been correctly prepared and conditioned.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recognise, rectify and report any spoilt materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select tools and equipment and other construction components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct complex floral designs.

  1. Select appropriate floristry techniques according to job specifications.
  2. Coordinate staff involved in team construction of complex floristry products.
  3. Produce complex floristry products considering and applying elements and principles of design.
  4. Determine and use appropriate support methods.
  5. Secure all components of complex floristry products according to job specifications.
  6. Evaluate and modify the floral design according to need, considering and applying elements and principles of design.
Select appropriate floristry techniques according to job specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Coordinate staff involved in team construction of complex floristry products.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Produce complex floristry products considering and applying elements and principles of design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Determine and use appropriate support methods.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Secure all components of complex floristry products according to job specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Evaluate and modify the floral design according to need, considering and applying elements and principles of design.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise and evaluate the complex floristry product.

  1. Attach and secure ancillary and presentation items to floral product.
  2. Select and use wrapping and packaging materials according to job specifications and make required adjustments to enhance or protect presentation.
  3. Dispose of hazardous and other waste safely to minimise negative environmental impacts.
  4. Review and evaluate the complex floristry product for compliance with job specifications, for technical and aesthetic quality and make required adjustments.
  5. Consider and apply elements and principles of design when wrapping, packing and altering the complex floristry product.
  6. Prepare basic reports to justify variations to original design and to inform future improvements.
Attach and secure ancillary and presentation items to floral product.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and use wrapping and packaging materials according to job specifications and make required adjustments to enhance or protect presentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dispose of hazardous and other waste safely to minimise negative environmental impacts.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Review and evaluate the complex floristry product for compliance with job specifications, for technical and aesthetic quality and make required adjustments.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Consider and apply elements and principles of design when wrapping, packing and altering the complex floristry product.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare basic reports to justify variations to original design and to inform future improvements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Interpret the design and job specifications

1.1 Interpret job specifications and itemised job costing.

1.2 Discuss, with relevant personnel, design and construction requirements including cost and production deadlines.

1.3 Read, view or discuss job specifications regularly during construction phase to comply with product requirements.

2. Plan the production stages.

2.1 Prepare a production plan for construction and display.

2.2 Source and roster staff for construction of complex floristry products.

2.3 Source, purchase or hire fabrication and structural support requirements according to job specifications and costing.

3. Select flower and plant materials and ancillary items.

3.1 Recognise and select ancillary items, flower, plant and presentation materials according to job specifications and costing.

3.2 Sort items in preparation for construction.

3.3 Identify potential problems for meeting design requirements and adjust as required.

4. Prepare to construct the floristry product.

4.1 Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.

4.2 Clean product construction area to avoid spoilage of flower and plant materials.

4.3 Check flower and plant materials have been correctly prepared and conditioned.

4.4 Recognise, rectify and report any spoilt materials.

4.5 Select tools and equipment and other construction components.

4.6 Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.

5. Construct complex floral designs.

5.1 Select appropriate floristry techniques according to job specifications.

5.2 Coordinate staff involved in team construction of complex floristry products.

5.3 Produce complex floristry products considering and applying elements and principles of design.

5.4 Determine and use appropriate support methods.

5.5 Secure all components of complex floristry products according to job specifications.

5.6 Evaluate and modify the floral design according to need, considering and applying elements and principles of design.

6. Finalise and evaluate the complex floristry product.

6.1 Attach and secure ancillary and presentation items to floral product.

6.2 Select and use wrapping and packaging materials according to job specifications and make required adjustments to enhance or protect presentation.

6.3 Dispose of hazardous and other waste safely to minimise negative environmental impacts.

6.4 Review and evaluate the complex floristry product for compliance with job specifications, for technical and aesthetic quality and make required adjustments.

6.5 Consider and apply elements and principles of design when wrapping, packing and altering the complex floristry product.

6.6 Prepare basic reports to justify variations to original design and to inform future improvements.

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Interpret the design and job specifications

1.1 Interpret job specifications and itemised job costing.

1.2 Discuss, with relevant personnel, design and construction requirements including cost and production deadlines.

1.3 Read, view or discuss job specifications regularly during construction phase to comply with product requirements.

2. Plan the production stages.

2.1 Prepare a production plan for construction and display.

2.2 Source and roster staff for construction of complex floristry products.

2.3 Source, purchase or hire fabrication and structural support requirements according to job specifications and costing.

3. Select flower and plant materials and ancillary items.

3.1 Recognise and select ancillary items, flower, plant and presentation materials according to job specifications and costing.

3.2 Sort items in preparation for construction.

3.3 Identify potential problems for meeting design requirements and adjust as required.

4. Prepare to construct the floristry product.

4.1 Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.

4.2 Clean product construction area to avoid spoilage of flower and plant materials.

4.3 Check flower and plant materials have been correctly prepared and conditioned.

4.4 Recognise, rectify and report any spoilt materials.

4.5 Select tools and equipment and other construction components.

4.6 Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.

5. Construct complex floral designs.

5.1 Select appropriate floristry techniques according to job specifications.

5.2 Coordinate staff involved in team construction of complex floristry products.

5.3 Produce complex floristry products considering and applying elements and principles of design.

5.4 Determine and use appropriate support methods.

5.5 Secure all components of complex floristry products according to job specifications.

5.6 Evaluate and modify the floral design according to need, considering and applying elements and principles of design.

6. Finalise and evaluate the complex floristry product.

6.1 Attach and secure ancillary and presentation items to floral product.

6.2 Select and use wrapping and packaging materials according to job specifications and make required adjustments to enhance or protect presentation.

6.3 Dispose of hazardous and other waste safely to minimise negative environmental impacts.

6.4 Review and evaluate the complex floristry product for compliance with job specifications, for technical and aesthetic quality and make required adjustments.

6.5 Consider and apply elements and principles of design when wrapping, packing and altering the complex floristry product.

6.6 Prepare basic reports to justify variations to original design and to inform future improvements.

Evidence of the ability to complete tasks outlined in elements and performance criteria of this unit in the context of the job role, and:

correctly interpret designs and follow job specifications to construct these types of complex floristry products which must be of consistent quality:

two custom-made complex floristry products in response to customer briefs

products fully constructed and displayed on-site at the floristry business:

one complex display or stock item

one complex window display

one large scale corporate display including components constructed off-site at the floristry business and assembled and displayed at corporate site

themed displays for an event including components constructed off-site at the floristry business and assembled and displayed at event venue

adapt to different display contexts by constructing complex floristry products in three different site environments

construct complex floristry products using these techniques across the above suite of products:

complex and other base medium construction techniques

complex and other hand tied techniques

complex, decorative and other wired floristry techniques

integrated hand tied, wired and base medium construction techniques

new and emerging techniques

use fresh and dry flower and plant materials across the above suite of products:

non-Australian species whether they are grown in Australia or overseas

Australian species.

Demonstrated knowledge required to complete the tasks outlined in elements and performance criteria of this unit:

intricate characteristics and interrelationships of elements and principles of design and use in complex floristry products:

elements of design:

texture

form

colour

space

line

principles of design:

harmony

rhythm

balance

dominance

scale

proportion

contrast

intricacies and use of these design guidelines or forms and categories for complex floristry products:

decorative

vegetative

formal-linear

radial

parallel

intricacies and use of these floral construction techniques for complex products:

complex and other base medium construction techniques

complex and other hand tied techniques

complex, decorative and other wired floristry techniques

integrated hand tied, wired and base medium construction techniques

new and emerging techniques

techniques for:

wrapping for enhancement

packaging and protecting flower and plant materials

packaging and protecting partially constructed displays during transportation

intricacies and use of an extensive range of fresh and dry flower and plant materials:

non-Australian species whether they are grown in Australia or overseas

Australian species

features of spoilt and unsuitable flower and plant materials

complementary nature of flower and plant materials to modify design during construction

handling techniques to avoid spoilage of ancillary items, flower, plant and presentation materials

intricacies and use of an extensive range of ancillary floristry products and presentation materials used to enhance complex floristry products

essential features and use of fabrication and structural support components of complex floristry products

staffing requirements to service the construction of complex floristry products

a range of formats for and inclusions of production plans for complex floristry products

types and correct use of personal protection equipment for constructing floristry products

safe handling techniques for:

toxic flower and plant materials

flower and plant materials treated with toxic fungicides and pesticides

cleaning products

floristry tools

cleaning techniques and uses of cleaning products for floristry construction areas

cleaning products:

role, use and basic content of Safety Data Sheets (SDS) or plain English workplace documents or diagrams that interpret SDS content

safe practices for storing

environmentally sound disposal methods for hazardous waste

potential environmental and site impacts of constructing complex floristry products and practices for:

reducing water and energy use

reducing wastage of floristry raw materials

environmentally sound disposal methods for these types of floristry construction waste:

wrapping and packaging materials

recyclable materials

spoiled and diseased flower and plant materials

flower and plant materials that have a propensity to propagate weeds.