The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare to lay vaults.
|
|
Liaise with supervisors or co-workers to identify and confirm work requirements including tools and equipment. Completed |
Evidence:
|
Identify, prepare and use personal protective equipment. Completed |
Evidence:
|
Select and assemble tools and equipment. Completed |
Evidence:
|
Check tools and equipment for serviceability and report faults to supervisor. Completed |
Evidence:
|
Determine safety hazards and take corrective action. Completed |
Evidence:
|
Set up drainage provisions in excavated vault areas according to plan details. Completed |
Evidence:
|
Install formwork in site according to work requirements. Completed |
Evidence:
|
Install sub-base material in site and compact area to specified level and consistency. Completed |
Evidence:
|
Install waterproof membrane to area as required according to manufacturer guidelines. Completed |
Evidence:
|
Cut, place and tie reinforcement to area according to plan details. Completed |
Evidence:
|
Apply release agent to formwork according to manufacturer guidelines. Completed |
Evidence:
|
Mix concrete.
|
|
Calculate volume of concrete required for vaults according to work requirements. Completed |
Evidence:
|
Determine proportions for concrete mix according to vault strength requirements. Completed |
Evidence:
|
Establish volume of dry materials to produce final concrete mix and mix to blend all materials. Completed |
Evidence:
|
Introduce sufficient water to produce a plastic concrete mix after making allowances for damp aggregates. Completed |
Evidence:
|
Place and finish concrete.
|
|
Check faults and take required corrective action prior to placing concrete. Completed |
Evidence:
|
Apply release agent to formwork according to manufacturer guidelines. Completed |
Evidence:
|
Conduct concrete slump test to confirm specifications where required. Completed |
Evidence:
|
Place concrete to designated levels in a manner that avoids segregation of materials. Completed |
Evidence:
|
Consolidate concrete using approved vibration method. Completed |
Evidence:
|
Screed concrete according to required level. Completed |
Evidence:
|
Prepare surface to required finish. Completed |
Evidence:
|
Use appropriate curing agent and method according to manufacturer guidelines. Completed |
Evidence:
|
Clean equipment on completion. Completed |
Evidence:
|
Complete installation.
|
|
Remove formwork and nails. Completed |
Evidence:
|
Gather and place vault lids according to work requirements. Completed |
Evidence:
|
Clean work area and store all equipment according to workplace requirements. Completed |
Evidence:
|
Prepare to lay vaults.
|
|
Liaise with supervisors or co-workers to identify and confirm work requirements including tools and equipment. Completed |
Evidence:
|
Identify, prepare and use personal protective equipment. Completed |
Evidence:
|
Select and assemble tools and equipment. Completed |
Evidence:
|
Check tools and equipment for serviceability and report faults to supervisor. Completed |
Evidence:
|
Determine safety hazards and take corrective action. Completed |
Evidence:
|
Set up drainage provisions in excavated vault areas according to plan details. Completed |
Evidence:
|
Install formwork in site according to work requirements. Completed |
Evidence:
|
Install sub-base material in site and compact area to specified level and consistency. Completed |
Evidence:
|
Install waterproof membrane to area as required according to manufacturer guidelines. Completed |
Evidence:
|
Cut, place and tie reinforcement to area according to plan details. Completed |
Evidence:
|
Apply release agent to formwork according to manufacturer guidelines. Completed |
Evidence:
|
Mix concrete.
|
|
Calculate volume of concrete required for vaults according to work requirements. Completed |
Evidence:
|
Determine proportions for concrete mix according to vault strength requirements. Completed |
Evidence:
|
Establish volume of dry materials to produce final concrete mix and mix to blend all materials. Completed |
Evidence:
|
Introduce sufficient water to produce a plastic concrete mix after making allowances for damp aggregates. Completed |
Evidence:
|
Place and finish concrete.
|
|
Check faults and take required corrective action prior to placing concrete. Completed |
Evidence:
|
Apply release agent to formwork according to manufacturer guidelines. Completed |
Evidence:
|
Conduct concrete slump test to confirm specifications where required. Completed |
Evidence:
|
Place concrete to designated levels in a manner that avoids segregation of materials. Completed |
Evidence:
|
Consolidate concrete using approved vibration method. Completed |
Evidence:
|
Screed concrete according to required level. Completed |
Evidence:
|
Prepare surface to required finish. Completed |
Evidence:
|
Use appropriate curing agent and method according to manufacturer guidelines. Completed |
Evidence:
|
Clean equipment on completion. Completed |
Evidence:
|
Complete installation.
|
|
Remove formwork and nails. Completed |
Evidence:
|
Gather and place vault lids according to work requirements. Completed |
Evidence:
|
Clean work area and store all equipment according to workplace requirements. Completed |
Evidence:
|