Evidence Guide: TLIB3094 - Check and repair track geometry

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIB3094 - Check and repair track geometry

What evidence can you provide to prove your understanding of each of the following citeria?

Determine job requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Faults and deficiencies in track geometry are identified, and work required to restore track to required standard is determined

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate repair methods are identified to enable repairs to be effected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job requirements and resources are determined in accordance with workplace procedures and scope of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore track geometry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Survey data is used as required to establish correct geometry

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate lifting and lining methods and equipment are used to lift and line track to restore running surface to required geometry in accordance with workplace standards and procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm compliance after work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track geometry is checked for compliance with acceptance rail industry standards

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vertical and horizontal structural and overhead clearances are checked against required standards to allow safe passage of trains

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track structure where work has been undertaken is checked for compliance with standards required to enable reinstatement of service

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate operating conditions are applied in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required documentation procedures and processes are confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is filled in legibly and proofread

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is processed in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Faults and deficiencies in track geometry are identified, and work required to restore track to required standard is determined

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Appropriate repair methods are identified to enable repairs to be effected

1.4

Job requirements and resources are determined in accordance with workplace procedures and scope of work

2

Restore track geometry

2.1

Survey data is used as required to establish correct geometry

2.2

Appropriate lifting and lining methods and equipment are used to lift and line track to restore running surface to required geometry in accordance with workplace standards and procedures

3

Confirm compliance after work

3.1

Track geometry is checked for compliance with acceptance rail industry standards

3.2

Vertical and horizontal structural and overhead clearances are checked against required standards to allow safe passage of trains

3.3

Track structure where work has been undertaken is checked for compliance with standards required to enable reinstatement of service

3.4

Appropriate operating conditions are applied in accordance with workplace procedures

4

Complete documentation

4.1

Required documentation procedures and processes are confirmed

4.2

Documentation is filled in legibly and proofread

4.3

Documentation is processed in accordance with workplace procedures

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Faults and deficiencies in track geometry are identified, and work required to restore track to required standard is determined

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Appropriate repair methods are identified to enable repairs to be effected

1.4

Job requirements and resources are determined in accordance with workplace procedures and scope of work

2

Restore track geometry

2.1

Survey data is used as required to establish correct geometry

2.2

Appropriate lifting and lining methods and equipment are used to lift and line track to restore running surface to required geometry in accordance with workplace standards and procedures

3

Confirm compliance after work

3.1

Track geometry is checked for compliance with acceptance rail industry standards

3.2

Vertical and horizontal structural and overhead clearances are checked against required standards to allow safe passage of trains

3.3

Track structure where work has been undertaken is checked for compliance with standards required to enable reinstatement of service

3.4

Appropriate operating conditions are applied in accordance with workplace procedures

4

Complete documentation

4.1

Required documentation procedures and processes are confirmed

4.2

Documentation is filled in legibly and proofread

4.3

Documentation is processed in accordance with workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least three separate occasions and include:

adapting to differences in equipment in accordance with operating procedures

applying relevant workplace procedures

assessing and identifying track geometry defects against required rail industry standards and applying appropriate restrictions

certifying track to operational standards after repair work is completed

checking the horizontal and vertical alignment, cross-level and cant of the track

confirming safe clearances of any structure erected adjacent to or over the track

determining appropriate repair methods for identified faults

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

identifying, selecting and using tools and equipment required for checking and repairing track geometry

implementing contingency plans

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

planning and organising work, including determining work requirements and work methods

reading and interpreting relevant instructions, procedures, information, plans, drawings and specifications

recording and reporting results of track work in accordance with workplace procedures

reporting and rectifying identified problems within limits of own role, in accordance with regulatory requirements and workplace procedures

selecting and using appropriate lifting and lining methods, and equipment to correct geometry defects

using appropriate lifting and lining methods, and equipment to restore running surface to required geometry

using appropriate measurement methods to assess and correct track geometry defects

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

documentation and/or work authorisation and work completion processes and procedures

emergency procedures

fault detection techniques

hazards that may exist when checking and repairing track geometry, and ways of controlling the risks involved

maintenance and measuring of track geometry workplace procedures

problems that may occur when checking and repairing track geometry, and action that can be taken to report or resolve these problems that may occur when measuring track geometry

relevant rail industry standards, technical specifications and workplace manuals and/or procedures

relevant safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

relevant work recording procedures

track certification requirements

track geometry acceptance standards

track geometry maintenance methods and techniques

track stability and the work requirements for different weather conditions

workplace procedures for checking and repairing track geometry.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.