NTISthis.com

Evidence Guide: TLIB3102 - Adjust rail

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIB3102 - Adjust rail

What evidence can you provide to prove your understanding of each of the following citeria?

Identify and determine rail adjustment requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate adjustment method is determined and required resources are arranged

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustment length is established depending on track geometry and location, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjust rail

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Anchor points are identified and created as required to enable rail adjustment to be undertaken in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track is released and rail is vibrated to achieve stress free state in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measurements are appropriately taken and used to calculate adjustment requirements in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail length is adjusted using appropriate method to achieve desired rail stress

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Rail is joined using determined appropriate method in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Track fastenings are restored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Creep control marks are installed or reset in continuous welded rail track as required, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete documentation

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed work is checked for compliance with rail industry standards to ensure safe operations of trains and compliance records are processed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation is completed and processed, in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify and determine rail adjustment requirements

1.1

Appropriate adjustment method is determined and required resources are arranged

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Adjustment length is established depending on track geometry and location, in accordance with workplace procedures

2

Adjust rail

2.1

Anchor points are identified and created as required to enable rail adjustment to be undertaken in accordance with workplace procedures

2.2

Track is released and rail is vibrated to achieve stress free state in accordance with workplace procedures

2.3

Measurements are appropriately taken and used to calculate adjustment requirements in accordance with workplace procedures

2.4

Rail length is adjusted using appropriate method to achieve desired rail stress

2.5

Rail is joined using determined appropriate method in accordance with workplace procedures

2.6

Track fastenings are restored in accordance with workplace procedures

2.7

Creep control marks are installed or reset in continuous welded rail track as required, in accordance with workplace procedures

3

Complete documentation

3.1

Completed work is checked for compliance with rail industry standards to ensure safe operations of trains and compliance records are processed

3.2

Documentation is completed and processed, in accordance with workplace procedures

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify and determine rail adjustment requirements

1.1

Appropriate adjustment method is determined and required resources are arranged

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Adjustment length is established depending on track geometry and location, in accordance with workplace procedures

2

Adjust rail

2.1

Anchor points are identified and created as required to enable rail adjustment to be undertaken in accordance with workplace procedures

2.2

Track is released and rail is vibrated to achieve stress free state in accordance with workplace procedures

2.3

Measurements are appropriately taken and used to calculate adjustment requirements in accordance with workplace procedures

2.4

Rail length is adjusted using appropriate method to achieve desired rail stress

2.5

Rail is joined using determined appropriate method in accordance with workplace procedures

2.6

Track fastenings are restored in accordance with workplace procedures

2.7

Creep control marks are installed or reset in continuous welded rail track as required, in accordance with workplace procedures

3

Complete documentation

3.1

Completed work is checked for compliance with rail industry standards to ensure safe operations of trains and compliance records are processed

3.2

Documentation is completed and processed, in accordance with workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant workplace procedures

ensuring track is restored in accordance with operational procedures

establishing appropriate adjustment length

identifying and determining appropriate methods for adjusting rail

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

installing and resetting creep control marks in continuous welded rail track, as required

interpreting and following operational instructions and prioritising work

measuring and calculating adjustment condition

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

operating and adapting to differences in equipment in accordance with operating procedures

reading and interpreting relevant instructions, procedures, information and signs

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with regulatory requirements and workplace procedures

taking appropriate measurements and calculating adjustments

using rail adjustment procedures for different track configurations

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

creep control marks

documentation and record keeping requirements

hazards that may exist when adjusting rail and ways of controlling the risks involved

problems that may occur when adjusting rail and action that can be taken to report or resolve these problems

rail adjustment methods and critical aspects of rail stress

relevant safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

temperature and alignment limitations on rail gap adjustment

workplace procedures for adjusting rail.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.