NTISthis.com

Evidence Guide: TLIB4071 - Install and maintain pole mounted switches and transformers

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

TLIB4071 - Install and maintain pole mounted switches and transformers

What evidence can you provide to prove your understanding of each of the following citeria?

Plan installation and maintenance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Works order is analysed and confirmed as required by site inspection

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Resources required for the job are identified and scheduled in accordance with operational procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards are identified, risks are assessed and control measures are implemented

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Switch equipment and transformer are transported to worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Liaison and communication issues are resolved in accordance with organisational negotiation procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare the worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work plan and resources required are confirmed/checked at worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Personnel participating in the activity, including plant operators and contractors, are fully briefed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Road signs, barriers and warning devices are positioned to ensure a safe worksite

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safeworking practices are observed on or about the running track/line

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is laid out in accordance with work plan to ensure minimum waste and rework

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Systems/circuits are isolated as required, proved safe to work on in accordance with works order, and electrical permits are received/accepted/returned as required

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install switches and transformers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Switch equipment, transformers and earthing systems are installed and connected

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Transformer is tested and voltage output is adjusted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Visual inspection is carried out to confirm equipment/apparatus is in a safe condition to test and/or commission

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Commission is carried out in accordance with works order/plan

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintain switches and transformers

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance requirement is confirmed by detailed site diagnosis

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Maintenance, including removal, repair, replacement and reinstatement, is carried out in accordance with works order and the condition of equipment

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Worksite is rehabilitated

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate authority is notified on completion of work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Records and documentation for updating system data are completed and processed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan installation and maintenance

1.1

Works order is analysed and confirmed as required by site inspection

1.2

Resources required for the job are identified and scheduled in accordance with operational procedures

1.3

Hazards are identified, risks are assessed and control measures are implemented

1.4

Switch equipment and transformer are transported to worksite

1.5

Liaison and communication issues are resolved in accordance with organisational negotiation procedures

2

Prepare the worksite

2.1

Work plan and resources required are confirmed/checked at worksite

2.2

Personnel participating in the activity, including plant operators and contractors, are fully briefed

2.3

Road signs, barriers and warning devices are positioned to ensure a safe worksite

2.4

Safeworking practices are observed on or about the running track/line

2.5

Worksite is laid out in accordance with work plan to ensure minimum waste and rework

2.6

Systems/circuits are isolated as required, proved safe to work on in accordance with works order, and electrical permits are received/accepted/returned as required

3

Install switches and transformers

3.1

Switch equipment, transformers and earthing systems are installed and connected

3.2

Transformer is tested and voltage output is adjusted

3.3

Visual inspection is carried out to confirm equipment/apparatus is in a safe condition to test and/or commission

3.4

Commission is carried out in accordance with works order/plan

4

Maintain switches and transformers

4.1

Maintenance requirement is confirmed by detailed site diagnosis

4.2

Maintenance, including removal, repair, replacement and reinstatement, is carried out in accordance with works order and the condition of equipment

5

Complete work

5.1

Worksite is rehabilitated

5.2

Appropriate authority is notified on completion of work

5.3

Records and documentation for updating system data are completed and processed

Required Skills and Knowledge

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan installation and maintenance

1.1

Works order is analysed and confirmed as required by site inspection

1.2

Resources required for the job are identified and scheduled in accordance with operational procedures

1.3

Hazards are identified, risks are assessed and control measures are implemented

1.4

Switch equipment and transformer are transported to worksite

1.5

Liaison and communication issues are resolved in accordance with organisational negotiation procedures

2

Prepare the worksite

2.1

Work plan and resources required are confirmed/checked at worksite

2.2

Personnel participating in the activity, including plant operators and contractors, are fully briefed

2.3

Road signs, barriers and warning devices are positioned to ensure a safe worksite

2.4

Safeworking practices are observed on or about the running track/line

2.5

Worksite is laid out in accordance with work plan to ensure minimum waste and rework

2.6

Systems/circuits are isolated as required, proved safe to work on in accordance with works order, and electrical permits are received/accepted/returned as required

3

Install switches and transformers

3.1

Switch equipment, transformers and earthing systems are installed and connected

3.2

Transformer is tested and voltage output is adjusted

3.3

Visual inspection is carried out to confirm equipment/apparatus is in a safe condition to test and/or commission

3.4

Commission is carried out in accordance with works order/plan

4

Maintain switches and transformers

4.1

Maintenance requirement is confirmed by detailed site diagnosis

4.2

Maintenance, including removal, repair, replacement and reinstatement, is carried out in accordance with works order and the condition of equipment

5

Complete work

5.1

Worksite is rehabilitated

5.2

Appropriate authority is notified on completion of work

5.3

Records and documentation for updating system data are completed and processed

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying appropriate repair/testing practices and procedures

applying relevant workplace procedures

communicating effectively with others

communicating plans, intentions and safety criteria to others

implementing contingency plans

interpreting and following operational instructions and prioritising work

modifying activities depending on operational contingencies, risk situations and environments

monitoring work activities in terms of planned schedule

operating and adapting to differences in equipment in accordance with operating procedures

performing calculations required for installation procedures

reading and interpreting relevant instructions, procedures, information, technical data, manuals and drawings

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with regulatory requirements and workplace procedures

selecting and using test equipment and testing techniques

working collaboratively with others

working systematically with required attention to detail without injury to self or others, or damage to goods or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

applicable state/territory legislated rail safety requirements, relevant codes of practice, rail industry standards and/or guidelines

characteristics, capabilities and uses of types of pole mounted switches and transformers

distribution system earthing procedures as they relate to installing and maintaining electrical switches and transformer equipment

hazards that may exist when installing and maintaining pole mounted switches and transformers

live/energised line working techniques and equipment

problems that may occur when installing and maintaining pole mounted switches and transformers

relevant electrical/electronic theory and principles

relevant work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

relevant organisation and commercial publications, including construction manuals and technical instructions as they relate to installing and maintaining electrical equipment

relevant recording and documentation procedures

relevant sections of railway safety management plans, rail industry standards and the Australian/New Zealand Standard for Wiring Rules

relevant technical regulatory requirements

statutory/organisation traffic control requirements, work zone regulations and guidance signals for planned operations

switching or de-energising procedures and maintenance operations

visual inspection workplace procedures

workplace procedures for installing and maintaining pole mounted switches and transformers.

Range Statement

Range is restricted to essential operating conditions and any other variables essential to the work environment.