The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Access rail track |
|
Completed |
Evidence:
|
Permission to occupy rail track is requested from Network Control Officer |
|
Completed |
Evidence:
|
Permission to occupy rail track is documented in accordance with Occupancy Authority requirements |
|
Completed |
Evidence:
|
Hazards are identified, risks are assessed and control measures are implemented |
|
Completed |
Evidence:
|
Appropriate personal protective equipment (PPE) is used conforming to Rail Infrastructure Manager requirements |
|
Completed |
Evidence:
|
Limits of travel are determined and agreed with Network Control Officer |
|
Completed |
Evidence:
|
Points are operated as required to gain access to the track as authorised by Network Control Officer |
|
Completed |
Evidence:
|
Situational awareness is maintained to identify local conditions and changed circumstances |
|
Completed |
Evidence:
|
Communication with Network Control Officer is maintained using communications rules and procedures |
|
Completed |
Evidence:
|
Travel track vehicle on track |
|
Completed |
Evidence:
|
Speed limit is observed for type and classification of track vehicle and type of track |
|
Completed |
Evidence:
|
Speed is varied in accordance with local conditions |
|
Completed |
Evidence:
|
Permission is obtained to pass signals at STOP in accordance with workplace procedures |
|
Completed |
Evidence:
|
Position of points are identified and operated as required to establish correct direction as authorised by Network Control Officer |
|
Completed |
Evidence:
|
Signals are identified and obeyed |
|
Completed |
Evidence:
|
Level crossing protection equipment is operated for the safe passage of track vehicle/s in accordance with workplace procedures |
|
Completed |
Evidence:
|
Vigilance system is operated, as required in accordance with workplace procedures |
|
Completed |
Evidence:
|
Unsafe situations and/or emergencies are identified, and appropriate action is taken in accordance with workplace procedures |
|
Completed |
Evidence:
|
Remove track vehicle from track |
|
Completed |
Evidence:
|
Network Control Officer is informed when track vehicle is off and clear of track |
|
Completed |
Evidence:
|
Occupancy Authority is correctly cancelled or fulfilled |
|
Completed |
Evidence:
|