The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan for travel movements |
|
Completed |
Evidence:
|
Travel requirements are established and application for approval is initiated |
|
Completed |
Evidence:
|
Movements are confirmed with Network Control Officer prior to travel |
|
Completed |
Evidence:
|
Hazards are identified, risks are assessed and control measures are implemented |
|
Completed |
Evidence:
|
Pre-start briefing is conducted with track vehicle operators to clarify travel movements and their responsibilities, in accordance with advertised approval and workplace procedures |
|
Completed |
Evidence:
|
Access track |
|
Completed |
Evidence:
|
Permission to occupy track is requested from Network Control Officer and documented as required |
|
Completed |
Evidence:
|
Appropriate personal protective equipment (PPE) is used in accordance with Rail Infrastructure Manager requirements |
|
Completed |
Evidence:
|
Limits of travel are identified and protection of the route by Network Control Officer is confirmed |
|
Completed |
Evidence:
|
Stand alone signalling control equipment is identified and points are operated as required to gain access to the track as authorised by Network Control Officer |
|
Completed |
Evidence:
|
Changed local conditions are identified |
|
Completed |
Evidence:
|
Communications with Network Control Officer is maintained using appropriate communications protocols and systems, in accordance with Rail Infrastructure Manager requirements and workplace procedures |
|
Completed |
Evidence:
|
Travel track vehicle/s on track to worksite |
|
Completed |
Evidence:
|
Communications protocols and systems are used to coordinate the convoy as required |
|
Completed |
Evidence:
|
Speed limit is maintained for type of vehicle/s and track conditions |
|
Completed |
Evidence:
|
Speed limit is varied in accordance with local conditions |
|
Completed |
Evidence:
|
Permission is obtained to pass signals at STOP in accordance with workplace procedures |
|
Completed |
Evidence:
|
Track vehicle is managed to be able to stop short of other track vehicles or obstruction on track |
|
Completed |
Evidence:
|
Stand alone signalling control equipment is identified and points are operated as required, to establish correct direction as authorised by Network Control Officer |
|
Completed |
Evidence:
|
Signals are identified and obeyed |
|
Completed |
Evidence:
|
Level crossing protection equipment is operated as required, for the safe passage of track vehicle/s in accordance with workplace procedures |
|
Completed |
Evidence:
|
Unsafe situations and/or emergencies are identified and appropriate action is taken in accordance with workplace procedures |
|
Completed |
Evidence:
|
Clear limit of travel |
|
Completed |
Evidence:
|
Network Control Officer is informed when track vehicle/s has arrived and is clear of limit of travel |
|
Completed |
Evidence:
|
Stand alone signalling control equipment is identified and points are operated as required |
|
Completed |
Evidence:
|
Authority to travel is recorded in accordance with organisational procedures |
|
Completed |
Evidence:
|