The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Position equipment and motive power unit/s |
|
Completed |
Evidence:
|
Remote control equipment and motive power units are positioned in required locations |
|
Completed |
Evidence:
|
Brake test is conducted on each train section with assistance from appropriate personnel |
|
Completed |
Evidence:
|
Front and rear train consists are coupled together to form one train, in accordance with safeworking techniques |
|
Completed |
Evidence:
|
Relevant work health and safety (WHS)/occupational health and safety (OHS) requirements are followed to prevent injury and damage |
|
Completed |
Evidence:
|
Relevant codes of practice, and safeworking systems and requirements are followed |
|
Completed |
Evidence:
|
Monitor and operate remote control equipment |
|
Completed |
Evidence:
|
Motive power units and control system set-up are checked to ensure safe operational status |
|
Completed |
Evidence:
|
Remote control equipment is operated and monitored in accordance with operational requirements during train movements to provide safe train handling and control |
|
Completed |
Evidence:
|
Operational difficulties encountered are addressed by re-establishing control of the motive power unit/s with minimum risk to personnel and equipment |
|
Completed |
Evidence:
|
Shut down remote control equipment |
|
Completed |
Evidence:
|
Shut-down procedures of lead and remote control equipment are followed to ensure train security and de-activation of the system |
|
Completed |
Evidence:
|
Equipment indicators or functions are operated to ensure shut-down process is correct and complete |
|
Completed |
Evidence:
|